Information
-
Site:
-
Audit Scope:
-
Auditor:
-
Date & Time:
-
Audit Number:
-
DPM Project Number:
-
Water Authority:
-
Water Authority Reference No:
-
Principal Contractor:
-
Water Contractor:
Administration
-
Does the construction crew have a copy of the latest version of the "construction issue" plan on site? <br> (Photo Required)
-
Are the Company's SWMS relevant to the task and with the crew on site? (Can be in Electronic Format) <br> (Photo Required)
-
Are the crew members the same as the last Audit?
-
Are the Key personnel nominated on the precommencement form on site? <br> (i.e. Pipe layer, Maintenance hole builder, Operator)
-
Can Operators produce their licence when asked? <br> (Can be in Electronic Format)
-
Is the licence valid and current? <br> (Photo Required)
-
Is the prestart check list kept with the machine? <br> (Can be in Electronic Format)
-
Has the prestart check list been completed? <br> (Photo Required)
-
Are the machines flashing light and reverse beepers operating correctly? <br> (If not has it been recorded in the prestart check list)
-
Are personnel wearing their PPE where required and according to their SWMS / JSA? <br> (Photo Required)
Safety - Excavations
-
Type of work being carried out
-
Are personnel using the equipment in a safe manner according to their SWMS / JSA?
-
Is the spoil heap far enough away from the edge of the trench to prevent sliding back into the excavation? <br> (Photo Required)
-
Are trenches barricaded and made safe to prevent access to the excavation site when left open?
Safety-Lifting
-
If slings are being used are they in a sound condition with no fraying, cuts, nicks and rated to carry loads? <br> (Photo Required)
-
If chains are being used, are they tagged and rated to lift the loads? <br> (Photo required)
Materials and Storage, Potable and Recycled Pipe and fittings
-
Are any Materials stored on site?
-
Are the Materials on site correct for the works being carried out as specified on the plans and specifications? <br> (Photo Required of Delivery Dockets for Bedding, Backfill, Concrete, Pipes and fittings)
-
Are pipes and other fittings being stored free from contamination in a position that prevents damage?
-
Are the stockpiles of Bedding material and Backfill material kept separate with no mixing or contamination? <br> (Photo Required)
Site Works - Pipelaying, Potable and Recycled
-
Is there any pipe works taking place?
-
Are trench widths in accordance with the Design requirements and suitable for the pipe size / type? <br> (Photo Required)
-
Is the bedding material the correct type and placed in accordance to the Design and Specifications? <br> (Photo Required)
-
Is the correct pipe and fittings type, size and Colour according to the Design and specifications being used? <br> (Photo Required)
-
Are pipes and fittings being installed in accordance with design specification, manufacturers recommendations and are approved products? <br> (Photo Required)
-
Are thrust Restraints installed as per the Design and Specifications? (Photo Required)
-
Are clearances to other services being maintained as per specification and design? <br> (Photo Required)
-
If DICL is being used have fittings been wrapped in approved labelled plastic according to the Design, Specifications and Manufactories recommendations? <br> (Photo Required)
Site Works - Backfilling, Potable and Recycled
-
Is Back Filling taking place?
-
Does the backfill material conform to the Design and Specifications? <br> (Photo Required)
-
If the backfill material is Clay, has the material been sifted to remove rocks? <br> (Photo Required)
-
Does the Clay backfill have the correct Clay / Rock ratio as per Design and Specifications? <br> (Photo Required)
Site Works - Property Connections, Main to Meter, Potable and Recycled
-
Have Property Connections Main to Meter been Constructed?
-
Have the Property Connections Main to Meter been constructed according to the Design, Specifications and MRWA Standards? <br> (Photo Required)
-
Has 100mm PVC pipe been used as a conduit for passing under all Footpaths, Roadways or where indicated on the Design and Specifications? <br> (Photo Required)
-
Has each property have a Potable and Recycled connection point as per Design, Specifications and MRWA Standards? <br> (Photo Required)
-
Has the connection been Terminated within the property boundaries as per Design, Specification and MRWA Standards? <br> (Photo Required)
General Comments
-