Information
-
Site:
-
Audit Scope:
-
Auditor:
-
Date & Time:
-
Audit Number:
-
DPM Project Number:
-
Water Authority:
-
Water Authority Reference Number:
-
Principal Contractor:
-
Sewer Contractor:
Administration
-
Does the construction crew have a copy of the latest version of the "construction issue" plan on site? <br> (Photo Required)
-
Are the Company's SWMS relevant to the task and with the crew on site? (Can be in Electronic Format) <br> (Photo Required)
-
Is the Crew the same personal as previous Audit
-
Are the Key personnel nominated on the precommencement form on site? <br> (i.e. Pipe layer, Maintenance hole builder, Operator)
-
Can Operators produce their licence when asked? <br> (Can be in Electronic Format)
-
Is the licence valid and current? <br> (Photo Required)
-
Is the prestart check list kept with the machine? <br> (Can be in Electronic Format)
-
Has the prestart check list been completed? <br> (Photo Required)
-
Are the machines flashing light and reverse beepers operating correctly? <br> (If not has it been recorded in the prestart check list)
-
Are personnel wearing their PPE where required and according to their SWMS / JSA? <br> (Photo Required)
Safety - Excavations
-
Type of work being carried out
-
What is the Type of shoring being used? (Photo Required)
-
Is ground support suitable for the ground conditions and depth of excavation?
-
Is the ground support set up correctly? <br> (Photo Required)
-
Are crew members provided with a ladder or other means of access and egress where required? <br> (Photo Required)
-
If a Ladder is provided, Is the Ladder set up and supported correctly?
-
Is a fall arrest system in place?
-
Is a Davit arm, Winch and Harness being used?
-
Is the David arm, Winch and Harness rated correctly for use as a fall arrest system? <br> (Photo Required)
-
Are the personal wearing the Harness correctly? (no twists in the straps, buckles correctly fastened) <br> (Photo Required)
-
Is the Harness fit for purpose, and is compliant with regulations? <br> (Photo of Harness tag Required)
-
Does the Harness connect to the Winch line via shock absorbing lanyard?
-
Are personnel using the equipment in a safe manner according to their SWMS / JSA?
-
Is the spoil heap far enough away from the edge of the trench to prevent sliding back into the excavation? <br> (Photo Required)
-
Are trenches barricaded and made safe to prevent access to the excavation site when left open? <br> (Photo Required)
-
Is Dewatering of Excavation taking place?
-
Are Environmental measures being used? i.e. does discharge pass through a silt control measure. <br> (Photo Required)
-
Are works generating excessive Dust?
-
Have dust suppression measures been taken? <br> (Photo Required)
Safety-Lifting
-
Is lifting equipment rated and tagged and is suitable for the works being carried out? <br> (Photo Required)
-
Are the shields marked with their weight? <br> (Photo Required)
-
What type of lifting hooks are being used to raise or lower the shields <br> (Photo Required)
-
Does the Sewer Contractor have authorization to use Open hooks?
Materials and Storage
-
Are any Materials stored on site?
-
Are the on site Materials correct for the works being carried out as specified on the plans and specifications? <br> (Photo Required of Delivery Dockets for Bedding, Backfill, Concrete, Pipes and fittings)
-
Are the stockpiles of Bedding material and Backfill material kept separate to prevent cross contamination? <br> (Photo Required)
Site Works - Pipelaying
-
Is there any pipe works taking place?
-
Have only approved products been used in the construction of pipelaying as per plans and specifications? <br> (Photo Required)
-
Are trench widths in accordance with the Design requirements and suitable for the pipe size / type? <br> (Photo Required)
-
Is the bedding material the correct type according to the Design and specifications?
-
Is the bedding material being placed correctly according to the design and specifications?
-
Are pipes being installed in accordance with design specification and manufacturers recommendations?
-
Are clearances to other services being maintained as per specification and design?
Site Works - Backfilling
-
Is Back Filling taking place?
-
Does the backfill material conform to the design and specifications?
-
If the backfill material is Clay, has the material been sifted to remove rocks?
-
Does the Clay backfill have the correct Clay / Rock ratio as per specifications? <br> (Photo Required)
Site Works - Structures
-
Are Maintenance Holes or other Structures been constructed?
-
Structure:
-
Have only approved products been used in the construction of all structures as per plans and specifications? <br> (Photo Required)
-
Are the Maintenance Holes being constructed as per plans and specifications? <br> (Photo Required)
-
Are any other type of Sewer structures being constructed? <br> (Photo Required)
-
Are the structures the correct size according to the design and specifications?
-
Have all Structures been protected from damage?
Site Works - Property Connections
-
Have Property Connections been Constructed?
-
Have the Property Connections been constructed according to the Design and Specifications? <br> (Photo Required)
-
Has a peg and tape been left at surface as per specifications indicating the connection point? <br> (Photo Required)
General Comments
-