Information
-
Site:
-
Audit Scope :
-
Auditor:
-
Date & Time :
-
Audit Number
-
DPM Reference :
-
Water Authority :
-
Water Authority Reference :
-
Water Authority Auditor :
-
Principal Contractor :
-
Sewer Contractor :
-
Is Contractors representative present? :
Audit - EDLP Sewer Other Structures
-
Are All covers set at correct height to the surrounding area? <br> (Photo Required)
-
Have the correct covers been used on surface fittings? <br> (Photo Required)
-
Do all the covers have a surround Collar Fitted? <br> (Photo Required)
-
Are there covers located in a Footpath? <br> (Photo Required)
-
Do the Covers finish flush with the surrounding area?
Audit - EDLP Sewer Maintenance Hole
-
Have the Chase in all MH's been formed correctly? <br> ( Photo Required)
-
Are all the step irons set into the Walls?
-
Has a ladder been installed? <br> (Photo required)
-
Has the ladder been fixed to the Maintenance Hole Correctly? <br> (Photo Required)
-
Are the MH/IS located in a Footpath? <br> (Photo Required)
-
Do the MH/IS finish flush with the surrounding area?
-
Has the MH been cleaned? <br> (Photo Required)
-
Are the MH lifting lug holes covered with a plastic plug? <br> (Photo Required)
-
Has the MH cover been greased? <br> (Photo Required)
Materials
-
Have only approved products been used?
-
Has the EDLP Audit Passed?
General Comments
-