Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Maintenance checklist

  • Contractor

  • Time & date of inspection

  • Job number

  • Builder

  • Address

  • Roof inspected

  • Has the final inspection been completed to Bristile's standards

  • General comments

  • Signature of contractor

  • Has the cold glaze been completed as per docket supplied and is completed to Bristile's standard

  • Is the roof up to Bristile's/ Australian standards if no please advise why in box below.

  • Is there any additional work that need to be carried out or concerns on this roof if yes please provide details below.

  • Cost of additional work

  • Images of additional work required / concerns

  • Front elevation taken from the roof including a valley

  • Right hand elevation taken from the roof

  • Rear elevation taken from the roof

  • Left hand elevation

  • Have you placed a sticker in the meter box

  • This job has been inspected in accordance with the above points & has been deemed to have met the Australian standards & company quality standards

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.