Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Maintenance checklist
-
Contractor
-
Time & date of inspection
-
Job number
-
Builder
-
Address
-
Roof inspected
- Top floor
- Middle floor
- Ground floor
-
Has the final inspection been completed to Bristile's standards
- Yes
- No
-
General comments
-
Signature of contractor
-
Has the cold glaze been completed as per docket supplied and is completed to Bristile's standard
- Yes
- No
-
Is the roof up to Bristile's/ Australian standards if no please advise why in box below.
- Yes
- No
-
Is there any additional work that need to be carried out or concerns on this roof if yes please provide details below.
-
Cost of additional work
-
Images of additional work required / concerns
-
Front elevation taken from the roof including a valley
-
Right hand elevation taken from the roof
-
Rear elevation taken from the roof
-
Left hand elevation
-
Have you placed a sticker in the meter box
- Yes
- No
-
This job has been inspected in accordance with the above points & has been deemed to have met the Australian standards & company quality standards