Title Page
-
Title:
-
Add media
-
Conducted on
-
Prepared by
-
Location
Pre-amble:
Maintenance carried out in accordance with requirements of Part-145 and organisational procedures
-
145.A.25(d) Is secure storage provided for components equipment tools and equipment?<br>Must include segregation of serviceable from unserviceable materials and components and tooling. Review Storage of tooling, materials and components for compliance with BAMC procedures.<br>
-
145.A.25(c) Do the facilities ensure the environment is appropriate for the planned task? <br>e.g. temperature, lighting, noise, airborne contamination, any specific environmental conditions per the AMM <br>•Record observations in relation to requirements of environmental control
-
145.A.40(a) Does the organisation have available and in- use, the necessary equipment, tools and material to perform the approved scope of work?<br>•Confirm tool control methods conform to BAMC procedures. <br>•Check all control logs and registers for accuracy of completion, where applicable. e.g. CB controls, blanking of systems and components, control for 'fly-away' kits etc.
-
145.A.40(B)<br>Does the organisation ensure that all tools, equipment and particularly test equipment, as appropriate, are controlled and calibrated?<br>•Review available tooling and confirm evidence of serviceability and/or calibration is available<br>•Confirm with site manager/supervisor extent of tooling and equipment being used, in particular any items loaned/borrowed or utilised from sources external to BAMC; e.g. loaned from satellite site.
-
Are All components classified and appropriately segregated?<br>•Components which are in a satisfactory condition, released on an EASA Form 1 or equivalent<br>•Unserviceable components<br>•Unsalvageable components - Disposal or aircraft parts or material<br>•Standard parts used on an aircraft - Confirm all AGS supplied is recorded on use
-
145.A.42(c)The organisation may fabricate a restricted range of parts to be used in the course of undergoing work within its own facilities provided procedures are identified in the exposition.<br>Review fabricated parts and confirm conformance to BAMC fabrication procedures
-
145.A.45 Is the required maintenance data available, in use, and at the correct revision? Is the in-use maintenance data the same as quoted on the associated work instructions/work orders?<br>•Review methods available to access maintenance data, and appropriate use thereof.
-
145.A.47(b) HANDOVERS - Is relevant information adequately communicated between outgoing and incoming personnel - handover completion iaw GPR.3.14
-
145.A.47 Maintenance Planning:<br>Additional maintenance requirements:<br>Confirm that, where applicable, in addition to the casualty task, all additional requirements have been captured, either accomplished or maintenance records have been raised for the accomplishment thereof<br>e.g dailys/weeklys/ ADD actions/ minor check requirements.<br>
-
Structural Repairs: Confirm evidence is available to establish conformity with the following requirements:
-
• Review technical instructions provided through technical support and confirm compliance with current instructions, QEANS, EANS, ITI. Etc.
-
• Confirm through an audit sample that accomplishment instructions have been embodied/Actioned
-
• CPCP program reporting and re-protection as required - Carried out, or maintenance records available to cover, per requirements.
-
• Damage tolerance assessment requirements and any subsequent inspection regime.
Release to Service requirements
-
A CRS signatory has been nominated and is appropriately approved?
-
The following minimum requirements apply for the issue of a CRS:
Closing the Package
- The SAP system at the end of the check can generate a report of routine and non-routine tasks generated on that check
-The nominated person will satisfy him/herself that all orders generated are accounted for by checking the Revision Certification Card Record sheet (RCCRS) and that the audit process has been carried out. He/she should confirm this by randomly sampling routine and non-routine tasks. The works order should then be closed on the SAP system by carrying out transaction ‘Review and Clear Workpack’ PRIOR TO DESPATCHING THE AIRCRAFT OR SIGNING THE CRS.
- Pre CRS Airworthiness Inspection
- A report confirming no structure gaps exists must be printed and entered in the log.
- Ensure that all check pack documentation is accounted for and completed. Ensure the closed log is reviewed to confirm no open entries.
- Ensure all Planning queries, Technical queries and fabrication applications (QL0028s) directly associated with the check have been resolved accordingly
- Check the revision certification and control record sheet for completion (RCCRS)
- Ensure that the aircraft Technical Log book is completed and dressed to the required standard.
- Ensure transaction set ATS/close revision on SAP has been carried out. -
Work pack card sample carried out?
-
Work pack documentation checked for accuracy and completeness?
-
Tech log reviewed to ensure complete and dressed?<br>- confirm required actions/requirements recorded as required.
-
7-day look ahead:<br>Confirm evidence for the following is available:<br>MEB/Ramp planning tool has been checked and confirmed aircraft remains in compliance for 7 days after release to service?<br>
-
Pre-CRS walkround inspection carried out.<br>-GPR.3.8 refers
-
CRS completed?
Executive Summary
Executive summary
-
Executive summary
-
Auditor:
-
Responsible Manager: