Information
-
Maintenance PLI Plantrooms
-
Wollongong Central GPT
-
Conducted on
-
Prepared by
Maintenance Checks
1- Building 1
Plant Rooms Building 1 (Level 3)
-
Boilers (Level 3 North West Plant Room)<br>Check operational if required
-
Cooling Towers (Level 3 North Plant Room)<br>Check level in tower ponds<br>Check operational including Dosing Pumps & Chemical levels<br>Check Condenser pumps 4 & 5 (Coles ) western side of room operational.<br>Check Eye Wash Station Operational ( weekly)
-
Kitchen Extracts (Level 3 Central Plant Room).<br>-Check all VSD set in Auto<br>- Check room free of Waste & Equipment
-
Radio Repeater Building 1 (Electrical Cupboard outside Guest Lift Lobby)<br>- Check power to cabinet is on <br>- Check UPS in place and working.
-
Air Handling Units & Car Park Extracts (Level 3 North, South West & South East Plant Rooms)<br>-Please check operational & VSD units set in auto.<br>- Check rooms are free of waste & Equipment.
-
Distribution Panel (North West next to Boiler House)<br>- Check door locked<br>- checked for tripped Circuits
Plant Rooms (Level 2)s
-
Kitchen Extracts (Level 2 South Plant room)
-
-
Air Handling Units & Car Park Extracts (Level 2 North, North East ,South East & South West Plant Rooms)<br>- Please check operational & VSD units set in auto.<br>- Check room free of waste or Equipment
-
Chillers (Level 2 North plant Room).
-
Kitchen Extracts North East Plant Room (next to Ramp up to Level 3)
-
Distribution Panel (North West next to Maintenance Workshop)<br>- Check door locked<br>- checked for tripped Circuits including Dynalight Relays
Plant Rooms (Level 1)
-
Main Switch Room (North West)<br>- is the EP&T equipment powered and operational?<br><br>Is the Power Factor Correction (PFC) powered and operational?<br>- check percentage value & if fluctuations are present<br><br>
-
Distribution Panel (North West within Main Switch Room)<br>- Check door locked<br>- checked for tripped Circuits including Dynalight Relays
-
Rainwater harvesting Tank Room (West)<br>- Check valves open & water passing through UV filter<br>- Check Life of UV filter<br>- check level of tank (weekly)<br>- Check the 'Check Valve is operational and UPS is on stand By
-
Air Handling Units West & South<br>- Check operational & VSD is in Auto<br>- Check room free free of Waste & Equipment
-
Fire Control Room (Outside South West Exit).<br>- check for Isolations<br>- Check for Alarms
-
EWIS Panel<br>- Check for faults
-
Mains Water Meter Room (Outside North West Exit)<br>- Check area clean and free of Waste & Equipment.<br>-
Plant Rooms (Ground Level).
-
Tenant Metering Room including Distribution Panel & IDF<br>- Check meters are functional <br>- check DB for tripped circuits including Dynalight Relays<br>- Check IDF board is secure with no loose or pulled lines.
-
Car park extract (off entry next to Richardson St )
-
Air Handling Unit (South)<br>- Check operational & VSD in auto<br>- Check room free of waste & Equipment
-
Gas isolation (Gas Safe) Switch & Intake/ meter room (South)<br>- check system is functional & not tripped<br>- Check room free of waste & Equipment
-
Communication & MDF Room (East of Gas Room end of Corridor)
Plant Rooms ( Lower Ground)
-
Distribution Panel (South west of corridor)<br>- Check door locked<br>- checked for tripped Circuits including Dynalight Relays
-
Air Handling Unit (adjoining Distribution room)<br>- Checks VSD operational & in Auto<br>- Check room free of waste & equipment
-
Car Park Extracts (South West next to lift & North Corridor )<br>- Check VSD operational & in Auto<br>- Check room clean and free of Waste & Equipment.
Plant Rooms (Basement)
-
Air Pelhams North & South<br>- check nothing stored within these areas.
-
Distribution Panel (North)<br>- Check panel door locked<br>- checked for tripped Circuits including Dynalight Relays<br>- Check integrity of Server
-
Air Handling Units & Car Park Extracts (North East)<br>- Please check operational & VSD units set in auto.<br>- Check room free of waste or Equipment
-
DAF Room (East)<br>- Check room not flooded. Low point pit empty<br>- Check inlet Flow Switch active (lights indication if working) west end of DAF<br>- check operational including Air Compressor<br>- Check air pressure correct (sight glass between 2 & 3 - between 6.25 & 6.5 pressure gauge)<br>- Flush Sludge valve (small valves at bottom of Tank leading back to DAF)<br>- Check stored level of both solids & fluid tank.
-
Sump Pumps (East & West) <br>- Check for high level alarms<br>- Test pumps in Manual
-
Grease Arrestor Room (West)<br>- Check for flooding
-
Sprinkler Tank Storage Room (South West)<br>- Check for leaks<br>-Confirm level full ( Tank level indicator)<br>- Check filler valve open
-
Sprinkler Tank Room (Weekly on Thursdays) Confirm tank capacity
-
Sprinkler valve room including diesel pumps (South West)<br>- Check pumps on stand by<br>- check all pumps are up to pressure required
-
Valves strapped open?
2 - Building 2
Plant rooms (Level 4)
-
Cooling Towers <br>- Check operational including Dosing Pumps & Chemical levels<br>-Check Eye Wash Station Operational ( weekly)
Plant Rooms Level 3
-
Are the Chillers and Pneumatics in Buildings 2
-
Boilers (Level 3 North West Plant Room)<br>Check operational if required
-
Gas intake including Metering
Plant Rooms (Level 2) Sprinkler Valve Room/ Fire Indication Panels
-
Fire panel checked and functioning?
-
Isolations noted?
-
Alarm panel checked and functioning?
-
Valves strapped open?
-
Main Switch Room (Left Door P2 Entry)<br>- is the EP&T equipment powered and operational?<br><br>Is the Power Factor Correction (PFC) powered and operational?<br>- check percentage value & if fluctuations are present<br><br>
Plant Room (Level 2) Main Switch Room/ Fire Control Room / MDF
-
EWIS checked and functional (Middle Room P2 Entry)<br>
-
MDF (Right Door P2 Entry)<br>- Check no wiring exposed or disconnected
Plant Rooms (Level 1 a)
-
Air Handling Unit / Kitchen Extracts / Toilet Extracts (East,Central & West)<br>- Check operational and VSD is in Auto (if fitted) or control panels without faults/alarms<br>- check room is free of Waste & Equipment
Tower Centre Management Office ECO (Tone Testing Every Thursday 0700- 0730 Hrs)
-
Please note areas Tested this day.
Tower Plant rooms (Levels 8-12)
-
Air Handling Unit & Toilet Extracts (Level 8 Terrace entry & Levels 9-12 West corridor access)<br>- Check operational and VSD is in Auto (if fitted) or control panels without faults/alarms<br>- check room is free of Waste & Equipment
-
Roof plant room Tank , Diesel Booster Pump<br>- Check for leaks<br>- Check fuel for Pump full and Gerry Can full.
Plant room (Level Ground A)
-
Sprinkler Tank Storage Room (behind staff toilets)<br>- Check for leaks<br>-Confirm level full ( Tank level indicator)<br>- Check filler valve open
-
Sprinkler Tank Room (Weekly on Thursdays) Confirm tank capacity
-
Auxiliary Diesel Pump<br>- check Fuel level in tank<br>- check spare fuel cans full<br>- Pump showing as on duty
Plant Room (Ground)
-
Grease Arrestor Room (off lift lobby BOH near CML storage )<br>- Check level of tank<br>- Check high level alarm<br>- Check pump in Manual are working<br>- Check room free of waste & Equipment
-
Water Meter (Behind Pandora stairwell to Keira St)<br>- Check for leaks
3- Building 3
Plant Room Level 5 (roof via plant room)
-
Cooling Towers <br>- Check operational including Dosing Pumps & Chemical levels<br>- Check Eye Wash Station Operational ( weekly)
Plant Room Level 4
-
Air Handling Units / Toilet Extracts
-
Compressors
-
Boilers
Plant rooms Dock Level
-
Main Switch Room ( 2 x Doors opposite Cardboard Compactor)<br>- is the EP&T equipment powered and operational?<br><br>Is the Power Factor Correction (PFC) powered and operational?<br>- check percentage value & if fluctuations are present<br><br>
-
Gas intake Room
-
Sprinkler Valve Room including F.I.P<br>- Check all valves are strapped open<br>- Check Fire Indicator Panel is functional <br>- Check for alarms and note isolations
-
Grease Arrestor Room (opposite Wet compactor)<br>- Check level of tank<br>- Check high level alarm<br>- Check pump in Manual are working<br>- Check room free of waste & Equipment
-
MDF
-
Mains Water Meter<br>- Check valve are locked open<br>- Check no leaks
CCTV
-
Check operational (Security Office Dock 2)
Casual Leasing
-
Is the test and tagging up to date?
-
Are the tables and chairs in good working order?
-
Is the area surrouding all casual leases clear of hazards?
Remedial Action
-
Remedial Action Required
Task
-
Job Details
-
Photos
Fire Control Room Inspections
Building 1 Sprinkler Valve Room
-
Sprinkler Valve Sets
Sprinkler Valve Set
-
Sprinkler Valve Set in range?
-
Booster Valve Sets
Booster Valve Set
-
Booster Valve Set in range?
Building 2 Sprinkler Valve Room
-
Sprinkler Valve Sets
Sprinkler Valve Set
-
Sprinkler Valve Set in range?
-
Booster Valve Sets
Booster Valve Set
-
Booster Valve Set in range?
Building 3 Sprinkler Valve Room
-
Sprinkler Valve Sets
Sprinkler Valve Set
-
Sprinkler Valve Set in range?
-
Booster Valve Sets
Booster Valve Set
-
Booster Valve Set in range?