Title Page
-
Location
-
Gym Number
-
Conducted on
-
Prepared by
-
Scheme Development Manager
-
Development Scrum (Development Manager/Architect/Design Manager)
1 - Critical Items
a) Equipment
-
Is Matrix/Precor equipment installed?
-
Is BLK Box Functional Zone installed?
-
Is Jordan equipment installed?
b) Health & Safety
-
All Pure Safety filing system (folders 1-5) setup as per key?
-
Fire extinguishers in place and labelled up, inventory completed for File 2?
-
Are red fire call points numbered 1, 2, 3 etc. and inventory completed for File 2?
-
Are all fire exits completely clear, and inventory of fire exits completed for File 2?
-
Tannoy working - internal and external - and can be heard over the fire alarm when sounding?
-
Fire alarm tested and mag locks release, signal received by Custodian?
-
Is fire alarm panel standalone or linked in?
-
Fire exit directional signage adequately displayed?
-
Is health & safety signage displayed?
-
Attention for Emergency Services sheet completed and in red fire box, along with copy of fire evac plan?
-
Unmanned announcements have been scheduled to play at club during unmanned scheduled times (This is through Mood Media or Cloud Casting)?
-
Defib and spare pads onsite?
-
First aid station and ice packs onsite and available?
-
Health & Safety poster, Jelf PLI certificate, Barbican ELI certificate, H&S Policy statement and Incident Report Procedure displayed in the staff room?
-
Fire exit plan, fire evacuation procedure and VRT displayed in staff room?
-
DDA Shower/Toilet emergency pull cords working, signal sent to pagers and tannoy activated?
-
Disabled refuge phones working, if applicable?
-
Help points working, connecting, and labelled up with emergency number?
-
Pagers working and set up?
-
Plant room free from combustibles?
c) Operational Setup
-
Cleaning supplies and machines delivered to site?
-
All member facing areas are clean and gym floor is reset, ready for opening?
-
Operational issues highlighted and passed onto relevant department (e.g. landscaping/high level clean).
-
Has a walkaround with the gym team being completed to demo the fire alarm, HVAC, extraction systems, and any other operational functions?
-
Staff WiFi working?
d) Access & Security
-
Are main front doors working on all settings?
-
Are external door mag locks set and working?
-
DDA swing door working on all settings, if applicable?
-
Pods/Speedgates working?
-
Member pins active and working?
e) Construction, Mechanical & Electrical
-
Did the site PC and handover on scheduled date?
-
Is the ventilation and extraction live and working on opening?
-
Have fire call-point reset keys and mag-lock reset keys been left onsite?”
-
Has there been a constant water supply throughout the install?
-
Has there been constant power during the install? Detail any power outages.
-
Has there been a constant gas supply during the install, if applicable?
-
Is the lift operational, if applicable?
-
Has a check of the cameras been made against the Brand Standards document and any issues raised with supplier?
f) Design
-
External signage installed?
2 - Non-Critical Items
a) Equipment
-
Is the equipment laid out as per the CAD plan, unless there is an opportunity to optimise?
-
All equipment snags completed 72 hours after identified?
-
Has all required equipment been bolted down (squat rack(s), smith machine(s), functional trainers, cable crossover(s), 5-stack, barbell holder)?
b) Health & Safety
-
Fire exit plans sent to content team and uploaded to website?
-
Fire alarm zone map displayed next to fire panel in foyer?
-
Isolation points tagged (gas, water, electricity)?
-
Unmanned poster and stand on site and ready to be displayed?
-
Is the lift auto-dialler operational and connects?
-
Have all certificates from handover placed in File 4?
c) Operational Setup
-
Defib cabinet on wall, alarm system set up, and can be seen on CCTV?
-
First aid kit installed on wall in staff room?
-
Clocks up in various locations?
-
Hooks up in staff room?
-
Toilet roll holders, soap dispenser and anti-bacterial dispenser installed?
-
All consumables stocked?
-
Keys and cabinet in comms room?
-
Red fire box on wall in entrance lobby?
-
Is external key box installed if club is non-24/7?
-
Has the safe been installed in comms room?
-
Stationery order delivered to site and stored away in filing cabinet?
-
Back of house areas tidy?
-
Vending machines and Yanga (if applicable) installed, stocked up, correct planogram and prices set, card readers working?
-
Have the cleaning hours been fulfilled during install week?
-
Have all the cleaning contractor responsibilities been fulfilled? To include recruitment of staff, training, p-files, and staff in correct uniform.
-
Atlas or Otium liability insurance certificate in date, loss of comms patrol sheets, Incident Reporting Procedure, daily checksheets and sign in book displayed in cleaning cupboard?
-
Have the sanitary bins, sharp bin, air fresheners, bolt cutters and external bin been delivered to site?
-
All staff profiles up on 'Meet The Team' board, and any empty slots filled with marketing posters?
-
Group Exercise timetable printed and placed up on 'Timetable' board, empty slots filled with marketing?
-
All belly posters and clip frames filled?
-
Daily check sheets placed up in changing rooms and for gym floor reset?
-
Felt board(s) on the wall in the staff room?
-
Is the comms room access poster, equipment reporting guide and cleaning escalation process (Atlas or Otium) displayed in staff room?
-
Photo to support felt board display.
-
Equipment maintenance check sheet, open/close check sheet, cleaning rota, and clipboard set up for class registers displayed in staff room?
-
Is fitness testing equipment set up and health assessment posters displayed in Assessment Room?
-
Can the music be heard in all areas of the gym, including the entrance lobby?
-
Head mics and music working for Cycle, Studio and Functional areas?
-
Has the expiry date been written on the stability balls?
-
Is the member WiFi working?
d) Access & Security
-
Are internal door mag locks set and working?
-
Door keypads all set to specific codes?
-
Is the CCTV working and loaded on managers PC's, and managers have been shown how to operate?
e) Construction, Mechanical & Electrical
-
Front fascia free from construction, clean, and in good order?
-
All decorations completed in all areas of the gym and entrance lobby?
-
Has the breakfast bar and managers podium been hard wired in and stools placed around? Welcome sign installed on front of podium?
-
Are the water font(s) working?
f) Design
-
External signage illuminated?
-
Internal signage installed?
-
Internal signage not hidden behind equipment?
-
Adequate way-finding signage installed?
-
Zonal signs correctly applied, as per guidelines?
-
Internal lighting sufficient and satisfactory in all areas?
3 - Handover Notes
-
Note
-
Assigned To
-
Relevant Photo
4 - Post-opening Follow Up Support
-
Date booked for follow up visit or call by SDM:
5 - Photos of Club
-
Add media
Report Sign Off
-
Regional Manager/Cluster Manager
-
Scheme Development Manager