Title Page
-
Conducted on
-
Prepared by
Information
-
Add location
Job Info
-
Work order Number:
-
Description of work:
-
Worker who completed Job:
-
Date Completed:
Visual inspection
-
Is the job Complete?
-
Has the area been left in a safe condition?
-
Has the Area been cleaned?
-
Add Photo’s of area
-
Are site staff happy with the finished job?
-
Staff member asked
-
Are You Happy with the Finished Job?
Administration
-
Has paperwork been completed for Job?
- Electrical Risk Assessment and Controls
- Hot Work Permit
- Working at Heights Form
- Confined Space Form
- Risk Assessment and Controls
- No of the above
-
Have site staff check the Job?
-
Has Job been completed in SAP?
-
Has a PM sheet been completed if required?
-
Has Time been confirmed against the Job?
Quality
Welding Job
-
Welding up to AS standard?
-
Has welding been finished?
-
Painted
-
Slag removed
-
Job present neat and tidy?
-
Has correct welding type been chosen? I.e Vertical up chosen over vertical down on heavy material.
-
Should the Job have even been welded? I.e was bolting a better option.
-
Fire watch practises complete?
Fitting Job
-
Are all Bolts and parts in place
-
Job present neat and tidy?
-
Checked and serviceable?
-
Oil level
-
Greased
-
Covers on
-
Guards on
-
Are all tags removed?