Title Page

  • Job Site Name

  • Conducted on

  • Inspected By:

  • Unit/Floor

  • Do you have 18in at unit entry

  • Verified Kitchen Dimensions?

  • Are all ceilings braced?

  • Are control joints framed every 30 ft?

  • Access panels framed properly?

  • Is stagger of prerock wall 12 in?

  • Are rough openings for doors correct?

  • Are welded frames plumb and level?

  • Return wall at tub/shower plumb and square?

  • Soffits in wall and kitchen plumb and square?

  • All blocking installed and at correct height?

  • MEP are not protruding beyond stud plane at cement board?

Fire Rating

  • Caulk/Fire tape complete?

  • Stagger of multilayer prerock correct?

  • Outside layer of prerock is 3/4 or 1in below framed ceiling/ bulkhead?

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.