Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Site Supervisor
-
Steel supplier
-
Type of build
-
Crew completing frame
-
Job site photos
Pre Start
MATERIAL:
-
Has all the steel been delivered?
-
Is there adequate hardware?
-
Has the frame material been delivered?
SLAB:
-
Is there slab, frame or column overhang?
-
Has the slab been laser levelled?
-
Has the termite barrier been installed?
SITE:
-
Is there power onsite?
-
Is a generator required?
-
Has the site clean been completed?
-
Has the temp fencing, toilet, bin and OH's sign been installed?
-
Is their running water?
DELIVERIES
-
Is there clear access in the street?
-
Is there clear access in the driveway for deliveries? e.g no piles of dirt, holes and the ground is firm
-
Are there overhead powerlines?
-
Is a franna needed?
PROCESS:
-
Are all columns installed plumb, studs pinned and anchor bolts installed?
-
Are all beams installed level and with the correct bolted connections?
-
Are cleats welded to columns if they have overhang?
-
Is the site left clean?
-
Was there any rectification work needed?