Title Page

  • Site conducted
  • Conducted on

  • Prepared by

  • Site Supervisor

  • Type of frame

  • Type of build

  • Crew completing frame

  • Job site photos

Untitled Page

MATERIAL:

  • Was there adequate material onsite?

  • Is there adequate hardware?

  • Have the joists and flooring been delivered?

SLAB:

  • Is there slab, frame or column overhang?

  • Has the slab report been emailed?

  • Has the termite barrier been installed?

SITE:

  • Is there power onsite?

  • Is a generator required?

  • Has the site clean been completed?

  • Has the temp fencing, toilet, bin and OH's sign been installed?

  • Is their running water?

DELIVERIES

  • Is there clear access in the street?

  • Is there clear access in the driveway for deliveries? e.g no piles of dirt, holes and the ground is firm

  • Are there overhead powerlines?

  • Is a franna needed?

PROCESS:

  • Are we completing this job with 2 plank?

  • Is scaffold required to complete the job?

  • Are the lower trusses being completed? If no please don't deliver to site.

  • Are there any retaining walls to be built?

  • Is the job a hebel or yellow tongue flooring?

  • Is the garage roof being trimmed down? If yes will need material

  • Is the balcony being built level or with 50mm fall?

  • Does the crew have all relevant layouts?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.