Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Site Supervisor
-
Type of frame
-
Type of build
-
Crew completing frame
-
Job site photos
Untitled Page
MATERIAL:
-
Was there adequate material onsite?
-
Is there adequate hardware?
-
Have the joists and flooring been delivered?
SLAB:
-
Is there slab, frame or column overhang?
-
Has the slab report been emailed?
-
Has the termite barrier been installed?
SITE:
-
Is there power onsite?
-
Is a generator required?
-
Has the site clean been completed?
-
Has the temp fencing, toilet, bin and OH's sign been installed?
-
Is their running water?
DELIVERIES
-
Is there clear access in the street?
-
Is there clear access in the driveway for deliveries? e.g no piles of dirt, holes and the ground is firm
-
Are there overhead powerlines?
-
Is a franna needed?
PROCESS:
-
Are we completing this job with 2 plank?
-
Is scaffold required to complete the job?
-
Are the lower trusses being completed? If no please don't deliver to site.
-
Are there any retaining walls to be built?
-
Is the job a hebel or yellow tongue flooring?
-
Is the garage roof being trimmed down? If yes will need material
-
Is the balcony being built level or with 50mm fall?
-
Does the crew have all relevant layouts?