Title Page
-
Inspection Date
-
Inspector (Name and Signature)
-
Location
Mechanical Inspection
Propulsion Engines
-
Operational Test
-
Leaks
-
Engine Fasteners
-
Rotational Guarding
-
Operation and Product Info Signage
-
Engine hoses condition
-
Engine piping condition
-
Engine Wiring condition
-
Exhaust leaks
-
Battery's
-
Instrument panel
-
Engines paint condition
Generators & Assembly
-
Operational Test
-
Leaks
-
Engine Fasteners
-
Rotational Guarding
-
Operation and Product Info Signage
-
Engine hoses condition
-
Engine piping condition
-
Engine Wiring condition
-
Exhaust leaks
-
Instrument panel
-
Generators paint condition
Steering System
-
Operational test
-
Indicator and rudder Alignment
-
Leaks
-
Engine hoses condition
-
Engine piping condition
-
Engine Wiring condition
-
Linkage/Pins/Clevis
-
Steering pumps and couplings
-
Safety Guarding
-
Rudder Bushing & Clearances
-
Steering system paint condition
Reduction Gear Boxes
-
Operation test
-
Leaks
-
Engine hoses condition
-
Engine piping condition
-
Engine Wiring condition
-
Coupling Condition
-
Safety Guarding
-
Mounts and Fastener
Fire Fighting System
-
Fire pump operational test.
-
Hose and Nozzle Condition
-
Labeling is identifiable and dated(Fire Pump Sea Chest Valve)
-
Portable Fire Extinguishers
-
Foam Sample Report up to date if Applicable
-
Fire Suppression system up to date
Electrical Inspection
Electrical Systems
-
Warning and Voltage Labels in correct locations
-
Electrical Inspections up to date
-
Switch Gear free of dust
-
Whistles , Bells , Horns
-
All Wiring Lugs tight and present
-
Battery's maintained and service date labeled
-
Starters , Overloads , Contacts
-
Operational test on Pumps
-
Condition of all Pumps
-
Air Compressors Motors
Condition Based Monitoring
-
Active Alarms
-
Alarms Deactivated
-
Operational test of high/low level alarms
-
Operational test of General Alarm, Fire Alarm, Sims Motion
-
Engine room sounding alarm functional
-
All Warning and Action lamps in working order
-
PLC clean and dust free
-
Toughbook is connected to the network
Electrical General
-
Electrical Hand Tools in proper working order
-
Proper Electrical PPE available
-
Extension Cords free of Breaks, Cracks ,Frays
-
Approved Surge Protectors used
-
GFI Outlets in Operation
-
ARC Flash Gloves Inspected and in good condition
-
Receptacle Covers in place
-
Light Switch Covers in place
-
Adequate space around all electrical enclosures
Vessel Appearance
Interior
-
Depth Sounder
-
Lighting Fixtures
-
Bilge Free of Oil & Fuel
-
General House Keeping
-
Relief Valves Label and Testing up to date (2 years)
-
Containments clean
Exterior
-
Air Intakes Free of Dirt and Oil
-
Deck Plates Down and Secured
-
Fire Cabinets in order!!NO CARDBOARD!!!
-
Search Lights
-
Hand Rails and Chains
-
Deck Winches & Capstan
Maintenance Records
Records
-
All Waste Transfer Logs up to date
-
Adequate parts stocked for voyage
-
Permit Books on hand
-
LOTO log sheet available
-
Lock Out Tag Out accessible
-
Waste Oil disposal log
-
Hazardous Material log
-
Slop Oil & Logs
-
Hazardous Waste & Logs
-
Used Oil Filter & Logs
-
MSD disposal log
-
JSA documentation
General Vessel Inspection
General Inspection
-
Emergency Signs operational
-
Hot Water piping covered
-
General Alarms labeled
-
Escape Hatches
-
Fire Doors to remain closed
-
Void Hatch Seals in good condition
-
Hand tools in safe operation
-
Yawl operational
-
Yawl Crane inspection up to date
-
MSD Operation
-
Product Transfer Hoses
-
Controlled Water System
-
Yawl Fuel Tank full of fuel and free of water
-
Yawl free of water and full of air if applicable
-
Yawl free of water and full of air if applicable