CHECKLIST COMPLETED:
-
From sidewalk (not working here)?
-
Off-site before or after work?
-
On-site?
INSTRUCTIONS: EVERY SECTION SHOULD BE ANSWERED: YES= OBSERVED AND IN COMPLIANCE, NO= OBSERVED AND NOT IN COMPLIANCE, NOT NEEDED= NOT PRESENT ON JOBSITE, DK= DO NOT KNOW
PERSONAL PROTECTIVE EQUIPMENT:Is personal protective equipment to be used at worksite:
-
Selected to minimise risk to health and safety
-
Suitable for the nature of the work and any hazard associated with the work?
-
Maintained, repaired, or replaced so it continues to minimize risk or worn by worker so as reasonably practicable?
-
Is PPE needed at this worksite?
HARD HATS
-
Supplied by employer?
-
Worn when required?
Boots
-
Supplied by workers?
-
Worn when required?
HEARING PROTECTION
-
Supplied by employer?
-
Worn when required?
EYE PROTECTION
-
Supplied by employer?
-
Worn when required
RESPIRATORY PROTECTION
-
Supplied by employer?
-
Training provided?
-
Worn when required?
PAINT SPRAYER EQUIPMENT
-
Are only properly trained employees using the paint sprayer equipment?
-
Are employees who operate spray guys aware of being exposed to injection injuries?
-
Are injection incidents reported & referred for medical assessment?
-
Eye protection supplied by employer and worn when required?
-
Respirator/masks worn when required and checked for proper fitting?
-
Inspect paint sprayer, including manifold filter, gun filter, and inlet strainer?
-
Are filters changed in accordance with manufactures instructions?
-
Inspect paint lines/hoses for any kinks or splits, report to jobsite foreman and do not use!
-
Inspect wet cup for leakage, tighten if needed?
-
Tip wear, replace if necessary?
-
Electric cord and plug?
SPRAYER SAFETY
-
Are spray guns fitted with tip guards?
-
Are spray guns fitted with a trigger lock?
-
Are spray guns trigger lock functional?
-
Are sprayers regularly cleaned and maintained?
-
Are spray guns tested in a safe manner?
-
Are all pressurized paint pots & spray guns cleaned properly? PRESSURE SHOULD BE RELEASED PRIOR TO CLEANING AND THE GUN SHOULD NEVER BE CLEANED BY COVERING NOZZLE WITH A CLOTH OR MATERIAL HELD IN HAND, AS THIS METHOD OF CLEANING CAN RESULT IN A PAINT INJECTION INJURY!
LADDERS:
-
are present at this worksite?
-
Correct size for the job?
-
Fully opened and spreader bars locked?
-
Firm foundation for ladder feet?
-
Proper climbing procedures?
-
Three-point contact rule followed?
-
Free from obvious defects?
-
Workers stand below top 2 steps/rungs?
-
Extend more than three feet above support?
-
SCAFFOLDS:
-
Are they present at this worksite?
-
Fall protection used if over 10' tall?
-
Set up on level, stable flooring?
-
Platform is appropriate width for type of scaffold?
-
Ensured all planks and railing are secure prior to use?
FALL PROTECTION:
-
Needed at this worksite?
-
Fall protection provided for heights 6' or more?
-
Harness is worn properly and attached to secure anchorage?
-
Slide guards are installed across full width and all sides?
-
Guardrails set up for openings> 6' above lower level?
-
Guardrails are constructed sturdily with 2x4's?
MACHINE HAZARDS:
-
Are power tools and machines used at this site?
-
Workers are trained on the use of power tools?
-
Workers have appropriate PPE and keep clothing away?
-
Workers are trained prior to using nail guns?
-
Tile and concrete are cut with wet methods?
-
Workers are trained prior to using paint sprayer?
-
Equipment is thoroughly inspected before operating?
HEAT STRESS:
-
Is heat a major problem at this site?
-
Have workers been trained on preventing and recognizing heat-related illness?
-
Are workers provided with enough water and given appropriate rest breaks?
TRENCHING:
-
Are there any exposed trenches?
-
Are all open/ exposed trenches marked for safety precaution?
ELECTRICAL HAZARDS:
-
Are present at this worksite?
-
Work on electrical circuits or energized equipment is begun ONLY after all power sources have been identified, de-energized and locked out or tagged out?
-
Overhead and underground electrical power lines are located, identified and avoided?
-
Ladders, scaffolds, equipment or materials are more than 10' from any electrical power lines?
EXCAVATIONS:
-
Are present at this worksite?
-
Soil and conditions are inspected everyday?
-
Are there safe exits (ladders) for excavations greater than 4' deep?
-
Shoring, shielding, and inclination assessed for excavations greater than 5' deep?
ACTIONS OR CHANGES
-
Talked to your organizers about health and safety concerns and possible changes/training?
-
Talked to co-workers about health or safety concerns?
-
Talked to foreman or contractor about health or safety concerns?
-
Suggested changes in equipment or procedures to co-workers?
-
Asked foreman or contractor for changes in equipment or procedures?
-
Asked foreman or contractor for training for self and/or co-workers?