Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Name of Auditor

  • Operations Manager or representative

1. Policies and Responsibilities 2.0

  • 1 Risk management/OH&S reviewed via documented meetings with the Centre's Regional Manager

  • Score

2. Risk Management 8.0

  • 2 Completed Risk Register in place for 'High' severity Risks

  • Score

  • 3 Risk Register regularly updated (eg following an incident, prior to a significant Centre change, annual review by Centre Manager & authorised by review with Regional Manager)

  • Score

  • 4 Completed Risk Action Plans in place 2

  • Score

3. Contractor Management 19.0

  • 5 All Contractor's insurance certificates of currency/details obtained. Relevant details entered into electronic Contractor Database

  • Score

  • 6 Centre Management review one Contractor activity per month to audit compliance using Contractor Compliance Inspection Checklist

  • Score

  • 7 Contractor induction program implemented, including inductions every two years or when a major change occurs

  • Score

  • 8 Evaluation of Contractor Occupational Health and Safety Procedures Checklist completed for all Major Contractors on appointment or renewal of contract

  • Score

  • 9 Contractors Sign In/ Key Pass Register, including details of name and company name, commencement time and date, work permits required, safe work method statements completed and completion time filled in

  • Score

  • 10 Contractor insurance coverage below $20 million submitted on Variation Form and submitted to CFSGAM Retail Head Office

  • Score

  • 11 Ensure that all construction contractors have; all signage on hoardings to include contact details of the shopfitter/contractor and a current OH&S Plan which is kept available.

  • Score

4. Hazard Identification, Management & Reporting 31.0

  • 12 Annual dry slip testing conducted by external provider. Reports retained and filed

  • Score

  • 13 Wet weather procedures in place 2

  • Score

  • 14 Wheelchair/stroller procedures implemented (ie recording of ID details, completion of waivers, storage)

  • Score

  • 15 Centre Management provides guidance to Tenants and their Contractors (where appropriate) to ensure safe shopping trolley management practices are in place, including reporting of unsafe work practices

  • Score

  • 16 Cleaning regimes developed to manage food court areas, including meeting peak periods and managing hot spots

  • Score

  • 17 Evidence of Food Retailers Manual provided to relevant new Tenants 1

  • Score

  • 18 Tenancy management procedures implemented (eg. Leased line breach disciplinary procedures, hazard management, signage management, common mall trading authorisations)

  • Score

  • 19 Ad hoc hazards reported on Hazard Report Form and controls actioned and reviewed.

  • Score

  • 20 Daily and quarterly inspections undertaken, recorded on relevant report/forms and filed

  • Score

  • 21 Evidence of Centre Information Manual provided to Tenants

  • Score

  • 22 Spillage Register utilised

  • Score

  • 23 Monthly Public Liability and Risk Management Report completed and sent to Company Secretary Department at Head Office

  • Score

  • 24 Incident Maps have been established and are reviewed annually 3

  • Score

5. Public Incident & Claims Management 9.0

  • 25 Serious incidents notified immediately to Head Office and all incidents entered into Lotus Incident Database within 2 days of the incident

  • Score

  • 26 Centre Management make a courtesy call to the client within 48 hours of the incident and record details of the call in the incident database

  • Score

  • 27 Shopping trolley incident procedures followed

  • Score

  • 28 Post incident analysis conducted, including reviewing/updating risk assessment forms

  • Score

6. Emergency & Crisis Management 24.0

  • 29 Emergency response procedures developed in conjunction with Contractors and Tenants and are readily available

  • Score

  • 30 Emergency "Go Kit" checked monthly including recorded in Attachment 6D

  • Score

  • 31 Annual evacuation trial undertaken

  • Score

  • 32 Assessment of the effectiveness of procedures undertaken. Minutes/records retained

  • Score

  • 33 Six monthly training of wardens undertaken, including fire fighting equipment and evacuation procedures

  • Score

  • 34 First aid kits signposted, available and maintained six monthly.

  • Score

  • 35 First aid contact information is posted in the Centre or at the location of the first aid kit

  • Score

  • 36 Services isolation points are noted on a plan 1

  • Score

7. Fire & Life Safety 73.0

  • 37 Servicing of essential services conducted in accordance with required service frequencies - refer Essential Services Maintenance Manual

  • Score

  • 38 Emergency lighting including pump house, sprinkler control valve room and the fire control room (where applicable). Exit signage provided and maintained

  • Score

  • 39 Fire services rooms, compartments and enclosures (including fire brigade booster enclosures, pump room, sprinkler control valve room, fire control room etc.) clearly labelled on the outside, including isolation procedures

  • Score

  • 40 Fire resisting structures and exits maintained in accordance with BCA

  • Score

  • 41 Penetrations in fire rated construction protected and maintained in accordance with BCA

  • Score

  • 42 Fire doors maintained in accordance with AS 1851 (Section 17)

  • Score

  • 43 Penetrations fire stopped (multi-storey buildings)

  • Score

  • 44 Register of fire barriers and associated penetrations available and maintained

  • Score

  • 45 Location of waste storage areas and receptacles used (closure and locking of lids during after hours) and stored away from the sides of buildings

  • Score

  • 46 Pallet storage areas are > 10m from buildings or stored in sprinklered protected areas

  • Score

  • 47 Alarm systems maintained in accordance with Australian Standards 2

  • Score

  • 48 Automatic Fire Sprinkler Systems maintained in accordance with Essential Services Maintenance Manual (including log book entries) and minimum clearance of 500mm maintained between sprinklers and objects, 1m for high piled storage areas

  • Score

  • 49 EWIS testing and maintenance conducted in accordance with Essential Services Maintenance Manual

  • Score

  • 50 Manual fire appliances maintained in accordance with Australian Standards, eg. Fire extinguishers, hose reels, fire hydrants

  • Score

  • 51 Maintain static pressure at below 1,200 kPa for all sprinkler control valves

  • Score

  • 52 All fire water supply valves secured in open position using chains/locks

  • Score

  • 53 Fire hydrant block plans available and displayed (Where tanks are installed, the volume of the tanks should be indicated)

  • Score

  • 54 Fire hydrant booster enclosures be installed with a lock compatible with the fire brigade

  • Score

  • 55 Fire hydrants and booster connections installed with protective caps (Booster connections must have appropriate kPa labelling)

  • Score

  • 56 Where diesel driven fire pumps are installed, the direct supply fuel tank should be maintained at least 75% full

  • Score

  • 57 Water supply flow test results for fire hydrants and sprinklers forwarded to the current ISR insurer (via Marsh) when requested

  • Score

  • 58 Inspection/maintenance documentation filed on site

  • Score

  • 59 Fire isolations recorded in the Fire Isolation Record

  • Score

  • 60 Property Impairment Notification Form utilised and forwarded to Marsh 2

  • Score

8. Essential Services Certification 10.0

  • 61 Fire Safety Compliance Certificate/15A (or the equivalent in each State/Territory) displayed in fire contact room and/or Centre Management office

  • Score

  • 62 Annual Fire Brigade familiarisation session offered 1

  • Score

  • 63 Centre Manager or Operations Manager, mechanical services contractor, fire services contractor involved in full function fire tests

  • Score

  • 64 Test documentation completed, signed off and filed

  • Score

9. Plant 19.0

  • 65 Plant hazard identification/management program in place including completion/updating of plant risk assessment forms

  • Score

  • 66 Induction and task specific training conducted on safe use of plant 2

  • Score

  • 67 High risk plant only operated by competent and authorised personnel, eg. scissor lifts and BMUs

  • Score

  • 68 Compactors and cardboard bailers requirements in place including key usage and induction

  • Score

  • 69 Relevant plant registered with regulatory authorities and register maintained 4

  • Score

10. Electrical Safety 26.0

  • 70 Procedure in place for maintenance/testing of equipment, including portable equipment, for example: Mall lights / Toilet lights / Car park lights / Security lights / Hand dryers / High and low voltage / CML connections

  • Score

  • 71 Quarterly inspections on fixed electrical equipment conducted and reported on quarterly inspection reports

  • Score

  • 72 Inspections and testing of hand held tools, portable equipment, extension leads and power boards undertaken in accordance with AS 3760

  • Score

  • 73 All main switchboards undergo thermographic testing every 12 months (whilst under load).

  • Score

  • 74 RCDÕs for portable devices inspected and tested as per AS 3760 including establishment and maintenance of a Register for all equipment that have been tagged and tested

  • Score

  • 75 Fixed RCDÕs inspected and tested annually

  • Score

  • 76 Plant rooms containing switchboards labelled and kept locked at all times

  • Score

  • 77 Switch rooms not to be used as storage rooms at any time

  • Score

  • 78 All electrical equipment used on roofs must have an earth leakage device

  • Score

  • 79 Clear spaces must be maintained around battery chargers

  • Score

  • 80 RF equipment management procedures in place

  • Score

11. Legionella Risk Management 20.0

  • 81 Cooling tower Risk Management Plan implemented

  • Score

  • 82 Cooling tower Risk Management Plan independently reviewed annual (Victoria & SA only)

  • Score

  • 83 All cooling towers have fully automatic dosing systems for chemical injection of corrosion inhibitor and biocide

  • Score

  • 84 MSDS held for all water treatment chemicals used at the Centre

  • Score

  • 85 Copies of inspection results forwarded to the Centre Management

  • Score

  • 86 Tenant systems incorporated into inspection schedules. Tenant testing and inspection reports provided to Centre Management

  • Score

  • 87 Inspection testing conducted in accordance with Essential Services Maintenance Manual testing guidelines: Analytic service / Tower Inspection / TBC reports / Biocide dosage / Inhibitor dosage / Cooling tower cleans / Legionalle test / Conddenser inspection

  • Score

  • 88 Corrective actions procedures implemented where required

  • Score

12. Indoor Air Quality Management 8.0

  • 89 IAQ parameters tested annually (as a minimum), eg. temperature, humidity, bacteria, fungi/mould, dust. Includes testing in car parks.

  • Score

  • 90 Inspection of air handling units as per BCA and Australian Standards 2

  • Score

  • 91 Centre smoke free, including five metre radius outside entrances. Signage displayed

  • Score

  • 92 Records maintained and managed in filing system 1

  • Score

13. Security & Access Control 17.0

  • 93 Register of security Contractors includes relevant details and filed during contract agreement (eg. licence details, insurance details, First Aid certification)

  • Score

  • 94 Regular meetings held between Centre Management and the Contractor and meetings minuted and filed

  • Score

  • 95 Guard Reports and Maintenance/Liability Report completed daily

  • Score

  • 96 Security reviews conducted after major incidents and corrective actions implemented

  • Score

  • 97 After hours procedure in place, including use of applicable form/register 1

  • Score

  • 98 CCTV coverage includes coverage of rest room corridors and passageways and rest room entries/exits

  • Score

  • 99 Application for CCTV Release form completed when required 2

  • Score

  • 100 CCTV footage retained for a minimum of 30 days (for new IP systems 60 days at 4CIF quality)

  • Score

  • 101 Security information entered into SCIDS

  • Score

  • 102 Procedure in place for staff escorts

  • Score

14. Dangerous Goods & Hazardous Substances 22.0

  • 103 DG/Hazardous Substances Register in place, including tenant substances

  • Score

  • 104 Annual audit conducted of chemical inventories at Centre. Unused goods discarded

  • Score

  • 105 Current MSDS held for all good/chemicals 5

  • Score

  • 106 Centre Plan developed denoting the location and type of Dangerous Goods and Hazardous Substances stored in the Centre

  • Score

  • 107 DG/hazardous storage locations are free from hazards, well ventilated and substances are stored correctly (eg. bunding, metal cabinets, flame proof cans). Appropriate signage used

  • Score

  • 108 All substances appropriately labelled according to National Code of Practice for the Labelling of Workplace Substances. The label should be: Durable and firmly secured on the outside of the container/ in English / easily readable / not defaced, altered or hand written / contain the product name and significant ingredients / state the type of use(s), hazards and relevant health and safety information

  • Score

  • 109 All gas cylinders shall be chained/secured in an upright position, whether full or empty.

  • Score

15. Tenancy Inspections 9.0

  • 110 Tenancy inspection program in place, ie annual inspections, communication protocols

  • Score

  • 111 Relevant documentation/forms/letters utilised

  • Score

  • 112 Inspections to include storage heights in major retailer's back of store areas

  • Score

16. Hazardous Building Materials (HBM) 20.0

  • 113 HBM Register in place (includes results of risk assessments, timing for reviews)

  • Score

  • 114 HBM risk issues included in induction process for Employees/Contractors

  • Score

  • 115 Refurbishment/demolition risk audits conducted, including Part 6 asbestos audits

  • Score

  • 116 Identified materials suitably labelled

  • Score

  • 117 Asbestos discovery procedures followed

  • Score

  • 118 Asbestos management procedures followed

  • Score

17A Roof Access and 17B Work at Heights 45.0

  • 119 Have the roof access risks been assessed of all physical locations and tasks that may cause an employee, contractor or passer-by an injury, through the use of the Work at Height Hazard Identification, Risk Assessment and Control Form

  • Score

  • 120 Have the appropriate risk controls been identified for each rooftop hazard using the hierarchy of controls noted within the CFSGAM Risk Management manual.

  • Score

  • 121 The Roof Access Permit is fully completed for all roof works

  • Score

  • 122 All points of roof access are signposted

  • Score

  • 123 All points of roof access are locked

  • Score

  • 124 CFSGAM employees are to only access the roof without a completed Roof Access permit when the conditions stated within the CFSGAM Risk Management manual are met

  • Score

  • 125 All authorised personnel required to access roof areas have been inducted to the specific requirement stated within the CFSGAM Risk Management manual.

  • Score

  • 126 Have all issues under planning and precautions within the CFSGAM Risk Management manual been addressed when planning work on roof

  • Score

  • 127 If a Fall Arrest system is to be used for a roof access task, has a Rescue Plan been completed by the contractor prior to the use of the Fall Arrest system.

  • Score

  • 128 Have the working at heights (there is no minimum height with the risk based on the level of hazard) risks been assessed of all physical locations and tasks that may cause an employee, contractor or passer-by an injury, through the use of the Work at Height Hazard Identification, Risk Assessment and Control Form

  • Score

  • 129 Have the appropriate risk controls been identified for each work at height hazard using the hierarchy of controls noted within the CFSGAM Risk Management manual.

  • Score

  • 130 The Work at Heights Permit is fully completed for all work at heights tasks

  • Score

  • 131 Ladder Inspection Checklist is being used

  • Score

18. Confined Space Entry 11.0

  • 132 Confined spaces identified and their name and location recorded on a register

  • Score

  • 133 Risk assessments/hazard identification conducted on all confined spaces and recorded on Confined Space Risk Assessment Forms

  • Score

  • 134 Pre entry work evaluation conducted (ie can the work be done outside the confined space?)

  • Score

  • 135 Contractor appropriately trained in hazards of Confined Spaces, assessment of procedures, control measures, emergency procedures (first aid & rescue procedures), selection, use, fit and maintenance of safety equipment

  • Score

  • 136 Confined Space Entry Permits completed/signed to manage works in confined spaces

  • Score

  • 137 The following records shall be maintained on file: Entry permits for 2 years / the current risk assessment reports for the confined space for 5 years from the time of its validity / training records

  • Score

19. Car Parks 16.0

  • 138 A traffic management plan is in place

  • Score

  • 139 Clear signage at entrance points is securely fixed identifying height restrictions within car parks

  • Score

  • 140 Trolley bays should be clearly signposted and marked in a clear, distinctive colour

  • Score

  • 141 Wheel stops/bumpers should be painted in a bright, distinctive colour

  • Score

20. Refrigerant Gases 2.0

  • 142 Refrigerant Gases Register in place for major plant 1

  • Score

  • 143 Leak detection systems installed and maintained where >100kg of a refrigerant gas is located within one chiller unit in areas where ventilation is poor

  • Score

21. Sharps 3.0

  • 144 Sharps management procedure in place, incorporating identification, removal and disposal practices. First aid procedures implemented for injuries

  • Score

22. Marketing Events 8.0

  • 145 Risk assessments completed for major marketing events, Marketing Risk Assessment Forms completed

  • Score

  • 146 Hazard inspection completed prior to event

  • Score

  • 147 Promotions Mall Licensing Agreement completed by all Licensees

  • Score

  • 148 Leasing variation requests completed and forwarded to Head Office

  • Score

26. Hot Work 24.0

  • 149 The responsible person for the administering of the hot works program has the appropriate level of knowledge in hot work

  • Score

  • 150 Risk assessments completed for all tasks involving hot works

  • Score

  • 151 Permit to work completed for all hot work activities including notations of permit requirements (correctly signed and dated)

  • Score

  • 152 Post hot work supervision and monitoring completed for all hot work activities

  • Score

  • Total Score

  • Audit completion

  • Auditor

  • Operations Manager or Representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.