MARSH DOCUMENT 28/05/2012 ISSUE 4
-
PROPERTY INSPECTION CHECKLIST - QUARTERLY
-
This inspection checklist is used as a guideline only and is not to be used to confirm compliance with Legislation, Regulations, Codes of Practice and Australian Standards.
-
Shopping Centre:
-
Inspection Date:
Car Park:
-
Potholes
-
Pedestrian walkways
-
Pedestrian Crossings
-
Painted and well lit
-
Pavement/Paving
-
No trip hazards
-
Bus Bays
-
Painted and well lit
-
Car Stops
-
In correct position
-
Traffic Signals
-
Operating
-
Lighting levels
-
Not more than 1% failure
External:
-
External Signage
-
Not visually loose or damaged
-
Light Poles
-
No rust in footings and secure
-
Pallet/Rubbish
-
Remove rubbish and refuse against walls
Mall:
-
Expansion Joints
-
Secure
-
Cracked Tiles
-
No trip hazards
-
Slip Tests
-
Up to date testing recorded
-
Corridors clear
-
No obstructions
Food Court:
-
Seating
-
Are seats stable
-
Table Tops secure
-
Are tops secure
Plumbing:
-
Non Return Valves
-
Are they maintained
-
Sewer Ejector
-
Fully operational
-
Grease Trap
-
Labelled
Gas:
-
Annual survey
-
Site audit to check system
-
Shut Off valves
-
Clearly identified
-
Signage
-
Displayed denoting SOV
-
Auto shut down
-
Ensure procedures in place for reset
-
Access
-
Clear access to Valves
Fire Systems:
-
Hose Reels
-
Tagged and maintained
-
Sprinkler & Pump Rooms
-
Clear of rubbish and fuel on site for pumps
-
Sprinklers
-
All isolation valves locked
-
Hydrants
-
No leaks
-
Portable Fire Equipment
-
Tagged and maintained
-
Fire Shutters/Doors
-
Test key operation
-
Fire Plant Shutdown
-
Review Fire test reports
-
Water Supply
-
Isolation valves open
-
FIP Isolations/Alarms/Faults
-
No alarms, faults or isolations are present.
Dangerous Goods:
-
Asbestos:
-
Visual. Non Friable leave. Friable utilise Procedures
-
Synthetic Fibre:
-
Sealed, none visible. If visible seal.
-
Lead Paint:
-
All to be removed
Electrical:
-
Communication
-
PA & 2way systems
-
General lighting levels
-
Not more than 1% failure
-
Switchboards
-
Clear of rubbish ,isolations are correctly tagged etc.
-
Lifts
-
Emergency lighting & call system operating
-
Travelators/Escalators
-
No sharp objects, Combs
-
Power Outlets
-
Visual check of GPOs for signs of damage (esp. CML and mall)
Cooling Towers:
-
CW Tower
-
Review testing documentation
-
Cooling Tower Dosing Equipment
-
Check equipment is operational
Equipment:
-
Maintenance Vehicles
-
Registration, roadworthy
-
Forklift
-
Registration, roadworthy
-
Scissor Lifts
-
Maintenance levels
-
One man lifts
-
Maintenance levels
-
PPE for staff
-
Hearing, breathing, gloves, masks
-
Compactors
-
Check all safety switches are operational, signage, oil recycling, lighting, leakage to stormwater etc.
-
Gas / Fuel storage
-
Correctly stored and MSDS
Baby Change Rooms:
-
Check tempered water mixing valves, Microwave instructions, RCD protection on all exposed power outlets.
Security:
-
Standing orders
-
Up to date procedures and contact lists
-
CCTV
-
Fully operational
-
Electronic system
-
Fully operational
-
Add signature
-
Date