Title Page
-
undefined
-
Conducted on
-
Prepared by
-
Location
Customer Satisfaction
-
Is customer satisfied with installation
-
What is the reason for this answer
-
Did engineers show ID and introduce themselves
-
Did engineers carry out pre-start walkthrough and discuss install
-
Did engineers use dustsheets and flooring protector
-
Did engineers walkthrough finished installation
-
Did engineers explain use of controls
-
Did engineers leave appropriate paperwork
-
Customer feedback
Installation Checklist
-
Are radiators installed per survey
-
Reason for re-locating
-
Customer satisfied with radiator positioning
-
Photos of all radiators
-
Are Trv's fitted to all radiators except bypass radiator
-
Is Heat Pump installed per survey
-
Reason for re-locating
-
Customer satisfied with Heat Pump location
-
Heat Pump Manufacturer
-
Heat Pump Model
-
Heat Pump Serial No.
-
Is Heat Pump installed to Manufacturers Instructions
-
Photo of ASHP and Data Badge
-
Are isolation valves fitted
-
Is all external pipework insulated
-
Are all pipework penetrations sealed to building fabric
-
Location of Condensate pipework termination
-
Does blowoff pipework terminate at ground level
-
Is safety cage fitted at blowoff termination
-
Is Cylinder installed per survey
-
Reason for re-locating
-
Is customer satisfied with Cylinder position
-
Cylinder Make and Volume
-
Photo of Cylinder and Data Badge
-
Is Cylinder and domestic pipework installed to regulations
-
Is pipework installed satisfactory
-
Is all pipework insulated
-
Has trunking been fitted to all exposed pipework
-
Is trunking fitted to a high decorative standard
-
Is room stat fitted and positioned correctly
-
Photo of room stat
-
Is Controller fitted and positioned correctly
-
Photo of controller
-
Has system been commissioned per manufacturers instructions
-
Has all required paperwork been completed
Comments
-
Customers comments
-
Inspectors comments
Sign off
-
Customers signature
-
Inspectors signature