Welcome

Woodbridge Energy Center Material Receiving Report

  • All MRRs will require the following information:
    1. MRR # (Generated when material received by warehouse)
    2. Storage Requirements
    3. Care & Maintenance Requirements
    4. OS&D (If applicable)
    6. Photos of material in the as-received condition
    5. Signature of MRR preparer with date

MRR

General Information

  • Date of inspection

  • MRR#:

  • Storage Location

  • Pictures of material in its offloaded location

  • Is outdoor, uncovered storage acceptable for this material?

  • Outdoor, uncovered storage is acceptable.

  • Does this material have care and maintenance requirements?

  • Care/Maintenance Requirements:

  • Photos

Over, Short & Damaged

  • Did the shipment contain the correct quantity of materials?

  • Enter the line item description and the quantity that should have been received and the actual quantity received. Include any relevant information and photos. As many quantity discrepancies may be added as needed.

  • Line Item Qty Discrepancy
  • Description

  • Add media

  • Was the shipment delivered undamaged?

  • Describe each instance of damage and include photos.

  • Damaged Part
  • Damage Description

  • Add media

  • MRR completed by:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.