Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

34. Noise

  • 34.1. Nuisance or disturbance noise from site activities is being kept to a minimum and such work that causes such only being conducted during DA approved hours

35. Impacts on Water Quality

  • 35.1. Storm water run off controlled<br><br>

  • 35.2. Storm water entry gullies have protection fitted (on & off site)

  • 35.3. Concrete trucks/pump wash-outs controlled<br>

  • 35.4. Wash-outs for paints and solvents controlled<br>

  • 35.5. Earthen batters have silt protection fitted

  • 35.6. Stockpiles have silt protection fitted

36. Air Quality

  • 36.1. Plant & Equipment exhaust emissions acceptable<br><br>

  • 36.2. Dust suppression is adequate

  • 36.3. Release of dust/fumes or vapors and Preventative measures against the release of CFC’s, asbestos fibres & chemical fumes

37. Erosion and Sediment Control

  • 37.1. Water pump-out allowed to settle before discharge to storm water<br><br>

  • 37.2. Water PH levels monitored as per the CESMP<br>

  • 37.3. Project silt fencing in good repair and drains protected & protection serviced regularly

38. Cultural Heritage

  • 38.1. If identified, protection and detection methods are being followed as per CESMP<br>

39. Chemical Storage

  • 39.1. Spillage bunds suitable to materials and quantity being stored (110% largest container)<br><br>

  • 39.2. Fire precautions considered at storage locations<br>

  • 39.3. Only compatible substances stored adjacent to each other – See SDS for storage guidance

40. Site Contamination

  • 40.1. Leaching Acid Sulphate controlled<br>

  • 40.2. Contamination treatment as per CESMP<br><br>

  • 40.3. Site usage of paints, solvents and chemicals are not contaminating the site – Wash up & spillage

41. Flora & Fauna

  • 41.1. If identified protection and detection methods are being followed as per CESMP<br>

  • 41.2. Damage or disturbance to flora & fauna on site & in adjacent parklands/wetlands/forests are being controlled as per CESMP<br>

  • 41.3. Cross contamination of noxious weeds/pests/fire ants/materials through transportation are controlled<br><br>

42. Vibration

  • 42.1. Nuisance or disturbance vibration from site activities is being kept to a minimum and such work that causes such only being conducted during DA approved hours<br>

  • 42.2. Damage to adjoining properties & utility services is being avoided<br><br>

43. Waste Management

  • 43.1. General litter, pests & vermin controlled via closed top food scrap bins and emptied daily<br>

  • 43.2. General building waste prevented from unintended release<br>

  • 43.3. Controlled disposal of asbestos, CFC’s is as per CESMP and legal requirements<br>

  • 43.4. Recycled materials are identified and treated as per the CESMP<br><br>

44. Energy

  • 44.1. Electrical consumption used on a conservative basis<br>

  • 44.2. Plant not being used is switched off<br><br>

45. PCBU Environmental Competence

  • 45.1. Other PCBU’s are conforming to legal and other requirements imposed for environmental protection (actual harm)<br>

  • 45.2. Other PCBU’s are conforming to required precautions to avoid environmental harm or potential environmental harm<br>

  • 45.3. Other PCBU’s are maintaining records on the effectiveness of their environmental controls they put in place to avoid environmental harm

Sign off - Matrix personnel

  • Additional comments by Matrix inspecting person

  • Additional sketch area for Matrix inspecting person

  • Name and Site Role of Matrix person conducting inspection

  • Note: Consult with both workers and Subcontractor PCBUs

  • Note: Upload events on to Mango if they cannot be closed out on day of inspection.

Sign off - persons consulted during inspection

  • Name, Occupation and PCBU name of person consulted during inspection

  • Name, Occupation and PCBU name of person consulted during inspection

  • Name, Occupation and PCBU name of person consulted during inspection

  • Name, Occupation and PCBU name of person consulted during inspection

Sign off - Project Manager or Site Manager acknowledgment

  • Name, position and signature of PM or SM

  • PM or SM comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.