Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
34. Noise
-
34.1. Nuisance or disturbance noise from site activities is being kept to a minimum and such work that causes such only being conducted during DA approved hours
35. Impacts on Water Quality
-
35.1. Storm water run off controlled<br><br>
-
35.2. Storm water entry gullies have protection fitted (on & off site)
-
35.3. Concrete trucks/pump wash-outs controlled<br>
-
35.4. Wash-outs for paints and solvents controlled<br>
-
35.5. Earthen batters have silt protection fitted
-
35.6. Stockpiles have silt protection fitted
36. Air Quality
-
36.1. Plant & Equipment exhaust emissions acceptable<br><br>
-
36.2. Dust suppression is adequate
-
36.3. Release of dust/fumes or vapors and Preventative measures against the release of CFC’s, asbestos fibres & chemical fumes
37. Erosion and Sediment Control
-
37.1. Water pump-out allowed to settle before discharge to storm water<br><br>
-
37.2. Water PH levels monitored as per the CESMP<br>
-
37.3. Project silt fencing in good repair and drains protected & protection serviced regularly
38. Cultural Heritage
-
38.1. If identified, protection and detection methods are being followed as per CESMP<br>
39. Chemical Storage
-
39.1. Spillage bunds suitable to materials and quantity being stored (110% largest container)<br><br>
-
39.2. Fire precautions considered at storage locations<br>
-
39.3. Only compatible substances stored adjacent to each other – See SDS for storage guidance
40. Site Contamination
-
40.1. Leaching Acid Sulphate controlled<br>
-
40.2. Contamination treatment as per CESMP<br><br>
-
40.3. Site usage of paints, solvents and chemicals are not contaminating the site – Wash up & spillage
41. Flora & Fauna
-
41.1. If identified protection and detection methods are being followed as per CESMP<br>
-
41.2. Damage or disturbance to flora & fauna on site & in adjacent parklands/wetlands/forests are being controlled as per CESMP<br>
-
41.3. Cross contamination of noxious weeds/pests/fire ants/materials through transportation are controlled<br><br>
42. Vibration
-
42.1. Nuisance or disturbance vibration from site activities is being kept to a minimum and such work that causes such only being conducted during DA approved hours<br>
-
42.2. Damage to adjoining properties & utility services is being avoided<br><br>
43. Waste Management
-
43.1. General litter, pests & vermin controlled via closed top food scrap bins and emptied daily<br>
-
43.2. General building waste prevented from unintended release<br>
-
43.3. Controlled disposal of asbestos, CFC’s is as per CESMP and legal requirements<br>
-
43.4. Recycled materials are identified and treated as per the CESMP<br><br>
44. Energy
-
44.1. Electrical consumption used on a conservative basis<br>
-
44.2. Plant not being used is switched off<br><br>
45. PCBU Environmental Competence
-
45.1. Other PCBU’s are conforming to legal and other requirements imposed for environmental protection (actual harm)<br>
-
45.2. Other PCBU’s are conforming to required precautions to avoid environmental harm or potential environmental harm<br>
-
45.3. Other PCBU’s are maintaining records on the effectiveness of their environmental controls they put in place to avoid environmental harm
Sign off - Matrix personnel
-
Additional comments by Matrix inspecting person
-
Additional sketch area for Matrix inspecting person
-
Name and Site Role of Matrix person conducting inspection
-
Note: Consult with both workers and Subcontractor PCBUs
-
Note: Upload events on to Mango if they cannot be closed out on day of inspection.
Sign off - persons consulted during inspection
-
Name, Occupation and PCBU name of person consulted during inspection
-
Name, Occupation and PCBU name of person consulted during inspection
-
Name, Occupation and PCBU name of person consulted during inspection
-
Name, Occupation and PCBU name of person consulted during inspection
Sign off - Project Manager or Site Manager acknowledgment
-
Name, position and signature of PM or SM
-
PM or SM comments