McGee- Authority to Commence Works
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
-
Is there a AtCW issued for all ongoing works on site?
-
Pick an activity currently ongoing on site and check if there is current set of RAMS/Safe systems of works ?
-
Pick a random operative on site and check if have they been briefed on RAMS and signed the briefing register? Do they have the required competency to carry out the task?
-
Does the AtCW reference TW designs and are routine inspections carried out?
-
Has the team planned and documented Emergency/rescue plan? Is rescue equipment available
-
Carry out random checks on equipment including LOLER , are all inspection in place and in date?
-
Does the AtWC reference the specific lift plan/schedule of common lifts?
-
Is the issued AtWC displayed on the daily activity board at the workface?
-
Has the supervisor checked and confirmed if the current site/set up of work area is compliant?
-
Has the Supervisor and Authorised Manager signed and dated the template to confirm that the above