Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Ironworkers

  • List current drawings being used.

Rebar

  • Has rebar installer filled out checklist

  • Are all additional bars installed around MEP openings/sleeves?

  • Does all WWF have a 2 section lap on it?

  • Do special areas such as depressions have proper bars and proper coverage is there?

  • Are bars around all steel columns per drawings?

  • Is candy cane hook bars around slab edge and large openings? With continuous bars at edge?

Carpenters

  • Have all beams been checked for hardware to prevent blow out? (Ties, jahn-a clamps, kickers, wing nuts, bulkheads etc.)

  • Is construction joints in proper place with allowable space for rebar or mesh to stick thru?

Engineer

  • Has all grading of the deck been planned or completed?

  • Has engineer taken pre-shots of metal deck and beams for deflection?

Finishers

  • Are all slab slopes/pitches/high points and low points marked out and shown to the finisher foreman?

  • Is the finished product determined? (trowel, bull float, broom etc.)

Laborers / Clean-up

  • Has deck been blown and vacuumed?

Signature of Checklist auditor

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.