Information
-
Audit Title
-
Client / Site
-
Location
-
Conducted on
-
Prepared by
Site Audit
1. Working at Heights
-
1.1 All edges with a 6 foot fall risk are protected with handrails at 42” to withstand 200lbs horizontally with 21” midrail and toeboard?
-
1.2 A fall protection system is being utilized while workers are exceeding heights of 6 feet. Specify which is used; PFAS, handrails, warning line, safety monitor, or controlled access zone?
-
Additional Notes
2. Small Tools and Equipment
-
2.1 Laser Warning signs are displayed when lasers are in use?
-
2.2 Workers operating powder actuated tools possess the proper training card for the equipment?
-
Additional Notes
3. Scaffolds
-
3.1 The scaffolding erected is properly tagged with its current state; red, yellow, green?
-
3.2 Green tagged scaffolding meets ALL requirements? *Daily inspection is completed prior to workers getting on it? *Scaffold platform(s) fully planked and no gaps more than an inch wide between the planks or uprights.*Scaffolds and walkways at least 18” wide. *Platforms extend over the support a minimum of 6” or are cleated. *Supported scaffold(s) with more than 4:1 height to base ratio restrained from tipping. *Supported scaffold on adequate firm foundation and capable of supporting intended loads. *Supported scaffold is plumb and braced. *Safe access to platform provided. Cross braces not used as means of access. *Fall protection provided on all scaffolds more than ten feet above a lower level. *Guardrail systems meet OSHA requirements and are installed prior to employees using the scaffold?
-
Additional Notes
4. Lifting Equipment
-
4.1 Forklifts and cranes on the jobsite have undergone a written daily inspection prior to usage each day?
-
Additional Notes
5. Harness and Equipment
-
5.1 All PFAS have been inspected and are in good condition with no found discrepancies?
-
Additional Notes
6. Ladders
-
6.1 Ladders are in good condition?
-
6.2 Stepladders are used only in the fully opened position without standing on the top or the first rung below the top?
-
6.3 Straight ladders are set at the proper angle, extend 3 feet above the landing surface and are tied off at the top?
-
Additional Notes
7. Hazardous Chemical (including fuel and oil)
-
7.1 Flammables are properly stored away from ignition sources or where spills could enter stormwater drains. etc?
-
7.2 Compressed gas cylinders are all secured. Flammable and non-flammable cylinders are stored a minimum of 20 feet from each other?
-
7.3 All containers on-site are properly labeled of their contents?
-
7.4 Large propane tanks are protected by large visual cones; barricaded where adjacent to traffic?
-
Additional Notes
8. Emergency Response
-
8.1 All workers have been trained on emergency procedures. Procedures are displayed. Emergency maps are displayed on each building level?
-
8.2 Adequate first aid kits available. An eye wash station is located on the jobsite?
-
Additional Notes
9. Personal Protective Equipment (PPE)
-
9.1 Adequate PPE sun protection, hardhats, eye glasses, high visibility safety shirts or vests, long pants, masks, sturdy leather work boots; steel toe where required, and gloves are utilized by each worker or visitor on site?
-
Additional Notes
10. Work Environment
-
10.1 Adequate toilet facilities are provided and maintained?
-
10.2 Functioning temporary lighting is provided in all work areas, bulbs are protected, lights and cords are suspended at least 8 feet above the floor. Strings of lights get power from circuits not providing power to other uses?
-
10.3 Inside work areas are clean and organized?
-
10.4 Exterior site areas are clean and organized?
-
10.5 Holes greater than 2” are properly covered, secured, marked and able to withstand 2x the intended load?
-
Additional Notes
11. Electrical Hazards
-
11.1 Electrical cords are at least 12 gauge, contain proper grounding plugs and are undamaged?
-
11.2 ALL extension cords are protected with GFCI protection?
-
11.3 Overhead electrical lines are protected from accidental contact?
-
11.4 All temporary electrical panel boxes are current with their monthly GFCI inspections?
-
11.5 Electrical cords are protected from equipment being driven on them?
-
Additional Notes
12. Environmental Hazards
-
12.1 An effective vehicle tracking pad is in place that prevents tracking mud or dirt onto public or private streets?
-
12.2 The erosion control log is up to date?
-
12.3 All storm water systems and devices are in place to prevent on-site contaminates from entering the storm water?
-
Additional Notes
13. Job Site Record Book
-
13.1 "Toolbox talks" being discussed & signed?<br>
-
13.2 Toolbox Topic for the Week
-
13.3 List Attendees (Take Picture of Signed "Toolbox Talk" )
-
13.4 All individual Daily Documents being filled out on job site daily? (Skid Loader, Scissor Lift, JLG, Cranes, Welding Machines, Rod Oven, Daily Sling Inspection, Scaffolding Inspection) <br>
14. Welding
-
14.1 Fire Extinguisher in reach of ANY and all Hot Work?<br>
-
14.2 Are fire extinguishers located a minimum of 1 per every 3000sf throughout project job site?
-
14.3 Spark Containment (Fire Blankets, Welding Screens)<br>
-
14.4 Welding Leads in good Condition?<br>
15. Potential Hazards for Upcoming Week
-
15.1 First time crew members on site?<br>
-
Do they understand Scope of work, hazards, and procedures?<br>
-
Signature of New Crew Member
-
15.2 Are there floor openings that require protection? (Greater than 2'x2')
-
Type in Explanation
-
15.3 Potential Hazards for Upcoming Week? (Tap At right to select multiple options)
- Overhead Work
- Pinch Points
- Hot Stress
- Slips Trips
- Rigging Failure
- Inhalation
- Hot/Cold Surfaces
- Moving Equipment
- Falls
- Flammable/Combustible
- Civil Work with Shoring
- Other
-
Manually Enter "Other" potential hazards
Corrective Actions
-
Enter any corrective actions that will be undertaken. Take pictures of some of the safe and at-risk items as part of this report.
-
*Add Pictures Here*
Sign Off
-
Type Auditor's Name
-
Auditor's Signature
-
Name of anyone onsite that was notified of unsafe work practices as part of this audit.