Client/Job Details
-
Date
-
Site Foreman
-
Location
-
Job Number
-
Job Description
-
Job Allocations
Site Inspection and Set Up
-
Received Induction to site - by Site Manager/Property Owner
-
Signs/Cones/Barricades set up
-
Traffic Controls in place
-
Wind strength
-
Has Foreman assessed wind conditions and approved continuation of work (work must not commence without approval)
-
Avoid work during high winds exceeding safe operational limits.
-
Use ropes or rigging to prevent uncontrolled movement.
-
Ensure safe exit paths in case of falling branches or trees.
-
Current or forecast weather conditions
- Rain
- Thunder/Lightening
- Fog/Low visibility
- High temperatures
- Low temperatures
-
Adverse weather conditions
-
Has Foreman assessed weather conditions and approved continuation of work (work must not commence without approval)
-
Stop operations during heavy downpours to maintain visibility and footing.
-
Delay operations until visibility improves.
-
Stop work and seek shelter if thunderstorms are forecasted or present.
-
Provide ample drinking water, sunscreen, and enforce breaks in shaded areas
Site hazards identified
-
Site Photo
-
Dropzone
-
Overhead lines
-
Terrain
-
Streams/Waterways
-
Livestock/Animals/Pests
-
Traffic
-
Public/Pedestrians
-
Buildings/Structures
-
Other
Tree assessment
-
Tree name/species
-
Tree Photo
-
Dead/broken limbs
-
Cracked/split trunks
-
Heavy leaners/unstable tree
-
Vines/interlocking branches
-
Other
Emergency procedures
-
Draw site plan
-
First Aid Kit and Extinguishers available onsite
-
First Aiders onsite
-
Evacuation point
Prestart Sign Off
-
Add signature
-
Add signature
-
Add signature