Title Page
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
MDU Name
-
MDU Unit Count
-
Select Contractor
- 3 Tier
- Bambanani Tech
- Bluetel
- Britelink
- Closed Circuit
- Emid
- Fabcomm
- FibreMat
- Light Source Fibre
- Lucert Group
- MTopGroup
- Ndzalamala IT
- Quiphire
- Red Networks
- Secure First
- Speedbit Solutions
- Ultimate Resource
-
MDU Address
-
Project Name
-
Aggregation Name
-
Block Name
Civils
-
Are Poles Planted According to Approved Site Survey?
-
Are Poles Planted To Correct Depth?
-
Has Excavated Soil/Grass Been Reinstated Correctly?
-
Are All Poles Straight?
-
Have All Work Areas Been Cleaned?
-
Have All Paving, Walkways, Tiles & Floors Been Reinstated Correctly?
-
Load Image Of Reinstated Paving, Floors, Tiles.
-
Comments Section
Auditing
-
Are All Cable Supports Installed Correctly?
-
Are Dead-Ends, Tangents & Drops Professionally Installed?
-
Are Electrical, Telkom and Fibre Cable Separation Maintained?
-
Are Conduits Attached To The Wall Correctly?
-
Is the NDP Unit Installed Correctly, Level, Professionally?
-
Upload Image of NDP & Associated Conduits
-
Is Cable Routing To/From NDP Neat, Level, Professionally?
-
Are The CTP Units Installed Correctly, Level, Professionally?
-
Load Image of CTP Unit 1
-
Load Image Of CTP Unit 2
-
Load Image Of CTP Unit 3
-
Load Image Of CTP Unit 4
-
Load Image Of CTP Unit 5
-
Any Other Items Requiring Attention?
Closure
-
Closing Statement?
-
Select date