Information
-
Document No.
-
Audit Title
-
Customer Name
Survey.
-
Work order number.
-
Full Address Details
-
Customer Contact Details
-
General Comment box
-
Work order type
-
Have you gained access?
-
Can the Property be metered Internally?
-
Reasons for Unmeterable ( Internal).
- IU11- internal Pipework material / condition
- IU12 more than 1 meter required UMP
- IU13 More than 2 meters required (Opt)
- IU14 ISV not located
- IU15 no main ISV for property
- IU16 ISV boxed in
- IU17 ISV behind kitchen units / appliances
- IU18 ISV inaccessible
- IU19 Pipework tees off directly after ISV
- IU20 Shared ISV
- IU21 No room at ISV location
-
Take photo of Stop Tap/Pipework.
-
Number of Bedrooms.
-
Number of Occupants.
-
Unmeterable comments
-
Date and Time of Survey.
Fit Type.
-
Proposed Fit type.
- Internal
- External Public
- External Private
- Exchange
- Read & Verify
- Melco
- Screwin
- Trial Hole required Public
- Trial Hole required Private
- Pipe Trace
-
Secondary Proposed Fit type.
- Internal
- External Public
- External Private
- Exchange
- Read & Verify
- Melco
- Screwin
- Trial Hole required Public
- Trial Hole required Private
- Pipe Trace
O/S/V Details.
-
OSV Location
-
Supported Photo's
Signatures
-
Customer Name & Signature - Confirmation of Visit
-
Surveyor Name & Signature