Method Statement Details

  • Audit Title

  • Method Statement No.

  • Client / Site

  • Conducted on

  • Prepared By:

  • Location
  • Show Legal Information

  • INTRODUCTION
    1.1 This method statement has been prepared on the basis of the information supplied by the client together with the site inspection & risk assessment report with sketches and drawings completed by the Emerson Site Inspector. These details are attached and form part of this Method Statement.

    1.2. method statement has been prepared on the basis of the information supplied by the client together with the site inspection & risk assessment report with sketches and drawings completed by the Emerson Site Inspector. These details are attached and form part of this Method Statement.

    method statement has been prepared on the basis of the information supplied by the client together with the site inspection & risk assessment report with sketches and drawings completed by the Emerson Site Inspector. These details are attached and form part of this Method Statement.

    method statement has been prepared on the basis of the information supplied by the client together with the site inspection & risk assessment report with sketches and drawings completed by the Emerson Site Inspector. These details are attached and form part of this Method Statement.

Contact Details

AP Details

  • Site Inspector

  • Date & Time of Visit

  • Telephone Number

  • Mobile Number

Customer Details

  • Customer Name

  • Site Contact

  • Mobile Number

  • Site Address

Load Details

Maximum Load Information

  • Maximum Weight

  • Maximum Radius

  • Maximum Size of Load

  • Maximum Lift Height

  • Maximum Wind Speed

Loads

    Load
  • Description

  • Dimension of Load

  • Length

  • Weight

  • Height

  • Maximum Radius for this item

  • Maximum Weight inc. Block & Tackle

Crane Details

Site Conditions

  • Access for Crane

  • Lifting Position

  • Add Picture

  • Access for Transport

  • Add More Conditions

  • Condition
  • Description

  • Lift Classification

  • Hand Signals

  • Two Way Radios

  • Who Supplied Them?

  • Working at Height Requirements

  • Safety Harness (EN:361)

  • Enter Details

  • Inertia Reel

  • Enter Details

  • Shock Absorbing Laynard

  • Enter Details

  • Short Laynard

  • Enter Details

  • Would you like to add a drawing of anything in the operation?

  • Please

  • Add your drawing

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.