Title Page
Site Pre Start Risk Assessment
-
This checklist is used to help identify site hazards in conjunction with your safe work method statement (SWMS). All workers in your team and work zone must be consulted on how you will manage the identified hazards. If you do not have one prepared for this site there are templates linked to the trades types/task section that you may use to make your own.
-
Name of business entity in control of the site
-
Site Supervisor name and contact number
-
Site Address
-
Conducted on
-
Prepared by
Trades
-
Please select what trade you are, or work type you are authorised to conduct on site from the drop down list below.
- Temp Fence Installer
- Fencing (Fixed)
- Asbestos Removal
- Mobile Plant Operator
- Drainer
- Electrical underground services
- Installtion of Piers
- concreter
- Carpenter Framer
- Roof Truss Installtion
- Fascia Gutter installer
- Installation of Roof Sheets
- Tiler Roof
- Antenna Installer
- Solar Panel Installer
- Installation of Evap Coolers
- Wall Wrap installer
- Bricklayer
- Brick Cleaner
- Scaffolder
- Cement Rendering
- Cladding installer
- Carpenter Eve Linings
- electrician
- Plumber
- insulation installer
- Plasterer
- Tiler internal
- Caulking
- Landscaper
- Mobile Scaffold Setup
- Carpet Installation
- Cabinetry/Robes Installation
- Shower/Mirror Installation
- Data/Security System Installation
- House Cleaning
- Residential Maintenance
- General Works
- Other
-
Please read and review the following safe work method statement. (Temp Fence Installation)
https://drive.google.com/drive/u/4/folders/1bzgzfTgBPfgWNdCTfWjywVLkrNX9qJgU -
Please read and review the following safe work method statement. (Temp Fence Installation)
https://drive.google.com/drive/u/0/folders/1nRrEDbjnnZ9yCKvrfi59m1m5Amv5eBRj -
Please read and review the following safe work method statement. (Mobile Plant Operation General)
https://drive.google.com/drive/u/4/folders/1GCUyMUfXsxbcnD7DD4F_L-p4PPlbI2rt -
Please read and review the following safe work method statement. (Bobcat Skid Steer)
https://drive.google.com/drive/u/4/folders/1Hi4TRQgxOTlWt8xXaobZGNiAehmdLJli -
Please read and review the following safe work method statement. (Dingo Mini Skid)
https://drive.google.com/drive/u/4/folders/1W3n_bh8n63MXWRLMeeToL3TMzYkpy4Ao -
Please read and review the following safe work method statement. (Boom Lift)
https://drive.google.com/drive/u/4/folders/1w9ajvHH48T9FFBVYjwso5IbcnIFsZjLx -
Please read and review the following safe work method statement. (Concrete Pump)
https://drive.google.com/drive/u/4/folders/1nY5JtZq34dxLFGQdGTTPoZIrmFDz1_-h -
Please read and review the following safe work method statement. (Excavator)
https://drive.google.com/drive/u/4/folders/1UKZ503zbi5xY1FcYGBn959bfOAIsGelc -
Please read and review the following safe work method statement. (Concrete Placement)
https://drive.google.com/drive/u/4/folders/1qPdDCIboz76fspmomUGJIYkyCIUEySld -
Please read and review the following safe work method statement. (Plumber Drainer)
https://drive.google.com/drive/u/4/folders/11CHNBMPKa2rV9EJKiSSCk84YtIdf1iPk -
Please read and review the following safe work method statement. (Electrical Services Underground)
https://drive.google.com/drive/u/4/folders/1iKwEXZuKScfLo12r5rjNq0JuKpXr3PXm -
Please read and review the following safe work method statement. (Slab Set out)
https://drive.google.com/drive/u/4/folders/1CIE6R1HeKRr06Xx2rf2iI1cDLEMIqXdo -
Please read and review the following safe work method statement. (Piers Holes/Pour)
https://drive.google.com/drive/u/4/folders/1HWDXblWVk4E-WuLoSU0Flm5Sn3lUL6ZD -
Please read and review the following safe work method statement. (Bobcat Operations)
https://drive.google.com/drive/u/4/folders/1Hi4TRQgxOTlWt8xXaobZGNiAehmdLJli -
Please read and review the following safe work method statement. (Concrete Pump)
https://drive.google.com/drive/u/4/folders/1nY5JtZq34dxLFGQdGTTPoZIrmFDz1_-h -
Please read and review the following safe work method statement. (Concrete Placement)
https://drive.google.com/drive/u/4/folders/1qPdDCIboz76fspmomUGJIYkyCIUEySld -
Please read and review the following safe work method statement. (Circular Saws)
https://drive.google.com/drive/u/4/folders/1T-i3KQiOI3i0s6JrB2KB6E1wzzU1WJ5Z -
Please read and review the following safe work method statement. (Nail Gun Use)
https://drive.google.com/drive/u/4/folders/1qF8UZCLQBrOntc3ne9I9v0_SgA9jG_PG -
Please read and review the following safe work method statement. (Working Off Ladders)
https://drive.google.com/drive/u/4/folders/1gnfMXfUbs88AZlpwTGCW6XyWOmzFcVxG -
Please read and review the following safe work method statement. (Lifting Materials With Crane)
https://drive.google.com/drive/u/4/folders/1CNEJj0-D22DWR3qgh2PneRP2BO9v2Qt_ -
Please read and review the following safe work method statement. (House Frames)
https://drive.google.com/drive/u/4/folders/19S8g-CCzAJFnouRxATtrI1AZLmY-PjhC -
Please read and review the following safe work method statement. (Roof Truss Installation)
https://drive.google.com/drive/u/4/folders/1A5cmwlCSGRSMv_tl8JQJwkcsIDrv6FdJ -
Please read and review the following safe work method statement. (Structural Alterations)
https://drive.google.com/drive/u/4/folders/14xkW3c5oi2nc_sizNcLcLg2-ql79O1r_ -
Please read and review the following safe work method statement. (Installation of Fascia & Gutter)
http:// -
Please read and review the following safe work method statement. (Installation of hang on Platform)
-
Please read and review the following safe work method statement. (Working Off Ladders)
-
Please read and review the following safe work method statement. (Working of a Ladder)
https://drive.google.com/drive/u/4/folders/1gnfMXfUbs88AZlpwTGCW6XyWOmzFcVxG -
Please read and review the following safe work method statement. (Roof Tiling)
http:// -
Please read and review the following safe work method statement. (Working off a Ladder)
https://drive.google.com/drive/u/4/folders/1gnfMXfUbs88AZlpwTGCW6XyWOmzFcVxG -
Please read and review the following safe work method statement. (Antenna Installation)
https://drive.google.com/drive/u/4/folders/1MGHZ94OFfSOt-VFXolyo1XgmnnTFCpCb -
Please read and review the following safe work method statement. (Wall Wrap)
-
Please read and review the following safe work method statement. (Brick Laying)
https://drive.google.com/drive/u/4/folders/1kPjXuAVcc_fwNNwpo6K6G4bn9AYXnYFz -
Please read and review the following safe work method statement. (Brick Cleaning)
https://drive.google.com/drive/u/4/folders/1ymdFeMskHk6r8UwOJwzJ6FDkkFq4YVv9 -
Please read and review the following safe work method statement.
https://drive.google.com/drive/u/0/folders/1b0_J01h_eU2iqXIkTmy5_Kpn0fJ-Tkdl -
Please read and review the following safe work method statement.
-
Please read and review the following safe work method statement. (Plumber- Drains)
https://drive.google.com/drive/u/4/folders/11CHNBMPKa2rV9EJKiSSCk84YtIdf1iPk -
Please read and review the following safe work method statement. (Plumber- Working off Ladders)
https://drive.google.com/drive/u/4/folders/1gnfMXfUbs88AZlpwTGCW6XyWOmzFcVxG -
Please read and review the following safe work method statement. (Plumber- Rough in Trades)
https://drive.google.com/drive/u/4/folders/1iVZt1uWC1NQocoSUCjtHdMEsUVijGaof -
Please read and review the following safe work method statement. (Plumber- Fix)
https://drive.google.com/drive/u/4/folders/1iVZt1uWC1NQocoSUCjtHdMEsUVijGaof -
Please read and review the following safe work method statement. (insulation Installer - Walls & Roof)
https://drive.google.com/drive/u/4/folders/1SJu7W8h4aPsXZK-FxxAIAbeKsgGEq9cD -
Please read and review the following safe work method statement. (insulation Installer - Working off ladders)
https://drive.google.com/drive/u/4/folders/1gnfMXfUbs88AZlpwTGCW6XyWOmzFcVxG -
Please read and review the following safe work method statement. (Plaster Board Install)
https://drive.google.com/drive/u/4/folders/1-rpWhMrHctxvNdm_xZAnAjRY-yv1TAxj -
Please read and review the following safe work method statement. (Plaster Board Stop & Finish)
http:// -
Please read and review the following safe work method statement. (Use of Stilts)
https://drive.google.com/drive/u/4/folders/1w69aoudmbySxykV7Tt4Nr7AABI5z41Im -
Please read and review the following safe work method statement. (Tiling Internal/External)
https://drive.google.com/drive/u/4/folders/1293sHFJbVZO1jMLekoY4OqPk4x974kbn -
Please read and review the following safe work method statement. (Caulking)
https://drive.google.com/drive/u/4/folders/1r3PP9zIWbczPsEtQS5QZ4edEOrDyLpxf -
Please read and review the following safe work method statement. (Renderining)
https://drive.google.com/drive/u/4/folders/1MANXWXiqhySOdHX3RUBVohs70PSI4tRn -
Please read and review the following safe work method statement. (Mobile Scaffold)
https://drive.google.com/drive/u/4/folders/1MANXWXiqhySOdHX3RUBVohs70PSI4tRn -
Please read and review the following safe work method statement. (Eave Linings)
https://drive.google.com/drive/u/4/folders/1n-7vBnZdENNPQQFRjdB156uzTITKK3st -
Please read and review the following safe work method statement. (Working off a Ladder)
https://drive.google.com/drive/u/4/folders/1gnfMXfUbs88AZlpwTGCW6XyWOmzFcVxG -
Please read and review the following safe work method statement. (Nail Gun Use)
https://drive.google.com/drive/u/4/folders/1qF8UZCLQBrOntc3ne9I9v0_SgA9jG_PG -
Please read and review the following safe work method statement. (Working off a Ladder)
https://drive.google.com/drive/u/4/folders/1gnfMXfUbs88AZlpwTGCW6XyWOmzFcVxG -
Please read and review the following safe work method statement. (Nail Gun Use)
https://drive.google.com/drive/u/4/folders/1qF8UZCLQBrOntc3ne9I9v0_SgA9jG_PG -
Please read and review the following safe work method statement. (Cladding Installation)
https://drive.google.com/drive/u/4/folders/1ZlE8skCtkOYf5N9GcYl3ggj3CeHRKml_ -
Please read and review the following safe work method statement. (Working off a Ladder)
https://drive.google.com/drive/u/4/folders/1gnfMXfUbs88AZlpwTGCW6XyWOmzFcVxG -
Please read and review the following safe work method statement. (Mobile Scaffold)
https://drive.google.com/drive/u/4/folders/1MANXWXiqhySOdHX3RUBVohs70PSI4tRn -
Please read and review the following safe work method statement. (Solar Panel Installation)
https://drive.google.com/drive/u/4/folders/1ma2t49q6R9Q-yJOBY6BTaG6IrsSnh9jo -
Please read and review the following safe work method statement. (Bobcat Operation)
https://drive.google.com/drive/u/4/folders/1Hi4TRQgxOTlWt8xXaobZGNiAehmdLJli -
Please read and review the following safe work method statement. (Dingo Mini Skid Operation)
https://drive.google.com/drive/u/4/folders/1W3n_bh8n63MXWRLMeeToL3TMzYkpy4Ao -
Please read and review the following safe work method statement. (Circular Saw)
https://drive.google.com/drive/u/4/folders/1T-i3KQiOI3i0s6JrB2KB6E1wzzU1WJ5Z -
Please read and review the following safe work method statement. (Grinder Use)
https://drive.google.com/drive/u/4/folders/1MQ92p7AOge2uMuK_egK_lNpbIegLHSPr -
Please read and review the following safe work method statement. (Working off a Ladder)
https://drive.google.com/drive/u/4/folders/1gnfMXfUbs88AZlpwTGCW6XyWOmzFcVxG -
Please read and review the following safe work method statement. (General Landscaping Works)
https://drive.google.com/drive/u/4/folders/1pC9z6KT_fNvwUEdoMgcmfmLZprfVZG6- -
Please read and review the following safe work method statement. (Mobile Scaff Setup)
https://drive.google.com/drive/u/4/folders/1MANXWXiqhySOdHX3RUBVohs70PSI4tRn -
Please read and review the following safe work method statement. (Carpet Installation)
https://drive.google.com/drive/u/4/folders/126BEtOb8GJbq2gXiyjhPNPrJXvfh_hh8 -
Please read and review the following safe work method statement. (House Cleaning)
https://drive.google.com/drive/u/4/folders/1Csxw_YTdj9-gEk3gzRhAXORtdo7Ka6lf -
Please read and review the following safe work method statement. (Residential Maintenance)
https://drive.google.com/drive/u/4/folders/1gz3Z88n3IS7NVb-F5dmvA4gX9JCeYUj- -
Please read and review the following safe work method statement. (General Works)
https://drive.google.com/drive/u/4/folders/1nmYZHNaKWkaCRQAlBQ_24rkmvJOlTI84 -
Please read and review the following safe work method statement. (Blank SWMS - to be Printed off and filled in)
https://drive.google.com/drive/u/4/folders/1vuUF4iiNJCMVpUnHi_x2cepZZvBhnaWX -
I have read the applicable SWMS all of my team have been inducted into the applicable SWMS for the activities to be conducted, I have engaged other trades/persons on site and reviewed each others activities and taken that into account as part of completed the following hazard assessment.
HAZARDS. Identify the hazards that will hurt you on site.
-
Select the hazards that can possibly hurt you on site from the following drop down.
- Team member/s may not be fit to work
- Rain/Winds/Heat
- Gas leak detected
- unsure of requirements or process
- Potential Live Sevices underground/ovehead
- Traffic Hazards
- Amenities in poor condition
- Unauthorised Entry of people to site
- obstructed site access
- mud control required on site
- open trenches or holes
- Asbestos Containing Material
- Objects that pose a cut hazard
- Fall zones
- material drop from height
- Working over the top of people
- incomplete/unsafe scaffold
- Awkward or difficult lifts
- unstable surface
- interaction with plant equipment
- Live electrical circuits
- Over head powerlines
- Leaking Gas LIne
- Capped Gas Line
- Permits required for task
- pressurised gas/air used
- Chemicals/paints/sealants used
- Other
-
Please describe the hazard
-
Take a photo of the hazards
ACTIONS. Confirm the action you will take to manage the identified hazards
-
Select the actions from the drop down list that you will implement as part of your control measure in your SWMS
- Isolate area
- Drop Zone barricaded
- Clear access path
- barricade fall zone
- raise electrical leads
- progressive house keeping
- Do not use scaffold
- Euipment check prior to start
- Contact supervisors for direction
- Ensure spotter is in Place
- Loading zone is braced and propped
- Clean access/work zone
- Clean amenities
- Plank out access path
- Secure site
- engage with other trades on site
- Toolbox with team
- Dial before you dig
- Shoring or Batter
- Cover/Barricade Trench
- Turn off gas supply
- Isolate electrical circuit
- Team lift
- Mechanical Lift
- Isolate people from work zone
- Ensure correct PPE is used
- Do not work on roof
- Implement heat plan
- clean public access areas eg: footpath/nature strip/road
- Traffic management in place
- Request further information
- Team fit for task
- Contact Supervisor & Leave site
- Line Pump to be used
- Franner Crane to be used
- Permits in place
- Check all Viod Platforms
- Access Ladders Secured
- Gate access used
- Brick elevator used
- Safety Data Sheets reviewed
- Other
-
Please write down the hazard control method that you will use.
-
I acknowledge and understand the safe work method statement and site risk assessment. I am the person responsible to implement or change the SWMS in accordance with the work.
-
Worker on site sign off:
-
Worker on site sign off:
-
Worker on site sign off:
-
Worker on site sign off:
-
Worker on site sign off:
Site/Job Supervisor SWMS review sign off
-
The site/job supervisor should review the SWMS when available, for the purposes of identifying hazards that may be present on site that are not within the reasonable skill set of the contractor completing the swms for the task. If the Supervisor is not on site please, check the builders sign or site information notice board for specific site hazards, if unsure call to check for any specific hazards.
-
Site/Job supervisor name