Title Page
-
SWMS
-
Conducted on
-
Location
-
Job Number
-
Prepared by
-
Builder
- GJ Gardner
- Hotondo - Hopper Homes
- Trevor Homes
- True Design Homes
- JM Homes
- PS Homes
- Other
-
Builder Name
-
Scope of works
- Facia
- Gutter
- Battens
- Roof
- Flashings
- Downpipes
-
Have all electrical hazards been identified
-
If powerlines are within 4m from staff contact supervisor
-
Are weather conditions suitable for work to be carried out?
-
Is edge protection and scaffold compliant and installed as required?
-
DO NOT commence work! Contact supervisor immediately!
-
Can risk to other trades on site be managed?
-
Discuss and list control measures so work can continue.
-
Is personal protective equipment available?
-
Provide PPE to all staff
-
Have all installers been consulted/involved in this assessment?
-
Consult all staff on site
Hazards not included on SWMS
-
What are the tasks involved?
-
Hazards
-
Add media
-
Control measures
Employees
-
Employee
- James Levy
- Jayson Sullivan
- Shane Dahl
- Syrone Cornelius
- Jon Benford
- Patrick Davis
- Joel Lynch
- Matt Harvey
- Adam Bennett
- Other
-
Add signature