Information

  • Job Number

  • Site

  • Conducted on

  • Site Supervisor

  • Location

SSF 004 Method Statement Amendment

  • The Method Statement provided for this project is intended to identify hazards and address the issue of “Risk and Control”. However, it should be regarded as a “live” document, Site Supervisors should revise and update the Method Statement as changing conditions dictate and whenever significant hazards are identified that are liable to put operatives, sub-contractors, or members of the public at risk.

Identified Hazard / Reason for Review

  • Use Risk Assessment (SSF 003), drawing, diagrams, photographs as well as description, if required.

  • Press Annotate to make a drawing

  • Press Add media to take a photograph(s)

List Control Methods Intended to Reduce Risk

  • Use Risk Assessment (SSF 003), drawing, diagrams, photographs as well as description, if required.

  • Press Annotate to make a drawing

  • Press Add media to take a photograph(s)

Site Supervisor Sign-off

  • These changes to the Method Statement will be relayed to all relevant operatives on site and registered via a Toolbox Talk prior to commencing.

  • Signed by Site Supervisor

  • C. G. Comley & Sons Limited T/A Comley Demolition. Registered office: Southern Way, Rye Common, Odiham, Hook, Hampshire, RG29 1HU. Telephone: 01256 702178. Email: comley@comleydemolition.co.uk Company Registration Number: 01672195

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.