Title Page
-
Site
-
Regional Manager Name
-
Site Engineer Name
-
Date
-
Prepared by
-
Location
PART A - General
-
1. HSE policy displayed at site
-
2. Emergency contact number displayed at site
-
3. Assembly point
-
4. Toolbox talk records available at site
-
5. Visitor Safety induction record
-
6. Availability of fire extinguisher at site
-
7. Availability of first aid box at site
PART B - Minimum Standards
-
1. Implemented LOTO (Lockout & tagout) at site
-
2. Working at height - Availability of Harness at site
-
3. Lifting - Avaibility of lifting tool at site
-
4. Operating tools and tackles - Physical condition of hand tools
-
5. Working with hazardous substance - display of MSDS at site
-
56. PPE - Availability of PPE for METSO personnel
-
7. Maintaining good order - House keeping at site
-
8. Maintaining good order - Stacking of wear parts
PART C - Mechanical
-
1. Hopper - (Wheel stopper/ warning board/ Edge barrigation/ free from non standard connections/ Alarm)
-
2. Jaw Crusher - (Physical Condition of Guards/ Operator cabin/ ladder - presence of hand rails/ Non standard connections/ visual defects)
-
3. Cone Crusher - (Physical Condition of Operator cabin/ ladder - Hand rails/ Non standard connections/ visual defects/ Condition of chute)
-
4. Barmac Crusher (VSI) - (physical condition of guards/ ladder - hand rails/ Non standard connections/ Visual defects/ Condition of Chute)
-
5. Vibrating Screen - (Physical condition of guards/ housekeeping - walkway free from debris/ Visual defects/ sufficent clearance between structure and screen body/ Obstrucles in walkway)
-
6. Conveyor - (Physical condition of Pull chord cable/ Motor guard/ rollers/ side frame/ Non standard connections)
PART D - Electrical
-
1. Hopper- (Adequate Lighting/ Non- standard electrical connections/ Overhead power lines secured)
-
2. Jaw crusher - (Emergency switch working status/ Earth pit condition/ Panel - No additional connections/ operating panel - rubber mat/ Panel - Secured connections, insulation & gland provided).
-
3. Cone crusher - (Emergency switch working status/ Earth pit condition/ Panel - No additional connections/ operating panel - rubber mat/ Panel - Secured connections, insulation & gland provided).
-
4. Barmac Crusher (VSI) - (Emergency switch working status/ Earth pit condition/ Panel - No additional connections/ operating panel - rubber mat/ Panel - Secured connections, insulation & gland provided).
-
5. Conveyor - ( Non- standard electrical connections/ No Sprinkler line & electrical line connected/ Adequate lighting)
-
6. Metal detector - (ladder - two sided)
-
7. Lighting arrestor - (earth pit/ Insulation/ gland/ separate cable/ Visual defects)
PART E -Welding & Gas Cutting set
-
1. Welding machine - (physical condition of machine/ cable/ gland secured/ Elcb/ holder condition)
-
2. Gas cutting set - (flashback arrestor/ hose condition/ trolley arrangement/ positioning of cylinders/ fire blanket)
PART F - Inventory Management
-
1 Identified scrap and material storage area
-
2 Tag system for all Inventory items/ New & repaired items need to be segregated seperately.
-
3 Storage of Lub drums in proper manner without any leakage
-
4 Electrical items inside the box and secured & separate box for small items
PART G - Good Practices
-
Points For Good Practice 1
-
Points For Good Practice 2
-
Points For Good Practice 3
Completion
-
Sign Off