Title Page

Details

  • Client

  • Who?

  • Conducted on

  • Prepared by

  • Name of Competent Person

  • Survey Type

  • First Line of Address

  • Front Elevation Photo

  • Location
  • Project

Mid & Post Install

Mid & Post Install Loft Survey

Loft Hatch

  • Loft Hatch Insulation

  • Photo's Mid Install

  • Photo's Post Install

  • Loft Hatch Draught Proofing

  • Photo's Mid/Post Install

  • Loft Hatch Hooks

  • Photo's Mid/Post Install

Loft Insulation

  • Loft Insulation

  • Is loft insulation being removed

  • Removed Insulation Photo

  • Overall Loft Photo's Showing Mid Install (Multiple Angles)

  • What area of the loft has been insulated (m2)

  • Post Install Insulation Photo

  • Post Install Insulation Depth (photo with tape)

  • Overall Loft Photo's (Multiple Angles)

Loft Ventilation

  • Are Eaves Vent Trays Fitted

  • Cross Flow Ventilation Installed

Cables

  • Did the PIBI identify any high voltage cable's in the loft space.

  • Type of cable

  • Is it clearly visible after loft insulation install

Tanks & Pipes

  • Water Tank Present

  • Photo of Insulated Tank

  • Any Pipes Present

  • Photo's of Insulated Pipework

Boarding

  • Has boarding been installed

  • Photo evidence of boarding MID Install

  • Photo evidence of boarding POST install

Handover/Conformity/Completion Certificate

  • Have you attached the Handover, Conformity & Completion Certificates to the rafter?

  • Photo evidence of certificates

  • Any Other Relevant Photo's

Resident Handover

  • Resident Received Handover Paperwork (resident to sign)

Inspection Test Plan

Loft Survey

  • Retrofit Survey

  • Boarded Areas

  • Water Tanks

  • Ventilation

  • Pipework

  • Cabling/Lighting in ceiling below (safe to insulate over)

Compliance

Design

  • Architect/Manufacturer Detail

  • Product Specified

  • What product

  • Loft Hatch Detail, Loft Hatch Draught Proofing

  • Ventilation - Cross Flow Ventilation

  • IBG Required

Installer

  • Name

  • Who

  • Qualification Number

Loft Cleared

  • Is it confirmed the loft has no hazardous materials (lead/asbestos etc.)

  • Is the old loft insulation being removed

  • Has it been checked that there are no issues below the existing loft insulation

  • Is there anything preventing the install of the insulation

Activity

  • Correct insulation product

  • Correct volume needed

  • Necessary paperwork on hand post completion

  • Resident guide ready

  • Access if appropriate and works can be completed safely

H&S

  • RAMS provided; Installer/Operative has signed up to RAMS specific referenced to this property

Lay Insulation

  • Depths

  • Layers

  • No gaps visible

  • Thicknesses

Ventilation

  • Mechanical ventilation left clear and in working condition

  • Vents to open air as specified (cross flow ventilation)

Loft Hatch

  • Insulated as per detail

Loft Post Install

  • All packaging removed

Paperwork in Loft

  • Loft Insulation Certificate

  • Conformity Certificate

  • Warning Notice

  • Claim of Compliance

Sign Off

Photo Checklist

  • Front of Property

  • Loft Hatch Insulation

  • Loft Hatch Draught Proofing

  • Loft Hatch Hooks

  • Loft Insulation Depth

  • Overall Loft (Multiple Angles)

  • Eaves Vent Trays

  • Cross Flow Ventilation

  • Water Tank

  • Insulated Pipes

  • Conformity Certificate

Assessment Sign off

  • I can confirm that I have inspected the loft and that the works indicated above have been completed and can be handed over to the client/resident. Name of Competent Person:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.