Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Location
-
Conducted on
-
Prepared by
-
Personnel
-
Personnel Conducting Audit Signature
Comments / Highlights
1. Inductions
1. Inductions
-
1.1 Fredon inductions completed ( induction includes SWMS).
-
1.2 Principal contractor inductions completed.
-
1.3 Daily pre-starts conducted; includes SWMS & Risk Assessments.
-
1.4 Toolbox talks conducted and recorded as specified for the site.
-
1.5 Skills register in place (includes competencies &licences).
-
Add media
2. Emergency
2. Emergency
-
2.1 First aid station and first aid kits available.
-
2.2 First aiders trained and clearly identified on emergency board.
-
2.3 Emergency plan and phone numbers displayed.
-
2.4 Extinguishers available, inspected, tagged and current.
-
2.5 Emergency exits clearly signed and unobstructed.
-
2.6 Clear access to extinguishers/hose reels.
-
2.7 Sign In / Sign Out register available.
-
2.8 Injury Management procedures followed.
-
Add media
3. Housekeeping and General
-
3.1 Amenities clean and hygienic
-
3.2 All access/egress ways kept clear and dry.
-
3.3 Work areas neat, tidy and not cluttered and well lit.
-
3.4 Materials and tools stored correctly.
-
3.5 Extensions leads raised off the ground.
-
3.6 Appropriate segregation of waste, adequate bins provided.
-
3.7 Manual handling techniques and aids used
-
Add media
4. Personal Protective Equipment (PPE)
4. Personal Protective Equipment (PPE)
-
4.1 PPE register in place and correct PPE being worn.
-
4.2 Eye protection (mandatory).
-
4.3 Safety boots (mandatory).
-
4.4 Safety hats (mandatory).
-
4.5 High visibility vests (mandatory).
-
4.6 Long sleeves shirts and trousers rolled down (mandatory).
-
4.7 Appropriate Gloves (mandatory).
-
4.8 Task specific PPE being used eg. Hearing, respiratory, etc.
-
Add media
5. SWMS and Permits
5. SWMS And Permits
-
5.1 SWMS developed, available and signed.
-
5.2 Work activities comply with SWMS.
-
5.3 Necessary work permits obtained:
-
5.4 Hot Work.
-
5.5 Excavation.
-
5.6 Others (confined space, electrical work etc) Note:
-
Add media
6. Hazardous / Chemical Substances
6. Hazardous / Chemical Substances
-
6.1 Hazardous/chemical register completed and up to date.
-
6.2 SDSs are available and up to date.
-
6.3 Hazardous/chemical substances stored correctly.
-
6.4 Containers labelled correctly.
-
6.5 Gas cylinders stored upright, secured correctly, clearly marked
-
Add media
7. Tools and Equipment
7. Tools And Equipment
-
7.1 Equipment register available and up to date.
-
7.2 Correct tools used for tasks, with correct/adequate safeguards.
-
7.3 Electrical equipment tested and tagged, serviced and fit for use.
-
7.4 RCDs, power boards tested and results recorded.
-
7.5 Lifting equipment tagged, serviced, fit for use and registered.
-
7.6 Fall protection equipment tagged, serviced and fit for use.
-
Add media
8. Signage/Barricading
8. Signage/Barricading
-
8.1 Danger/warning signs in place (including electrical).
-
8.2 Barriers in place around open areas, pits, ramps, etc.
-
Add media
9. Mobile Plant and Equipment
9. Mobile Plant And Equipment
-
9.1 Pre-start checks are recorded in log books kept and up to date.
-
9.2 Plant and Equipment register available and up to date.
-
9.3 Plant Operators have a certificate of competency and hold the relevant High Risk Licence (where applicable).
-
9.4 A Risk Assessment has been completed on each item of plant<br>Plant is maintained in accordance with the manufacturer’s specification, and recorded <br>Operators Manual is available<br>A record of inspections is available and up to date.<br>
-
Add media
10. Isolations/ LOTO and Electrical Work
10. Isolations/ LOTO And Electrical Work
-
10.1 LOTO register kept on site and up to date; including lock/tag owner, date, location, device locked.
-
10.2 Tags labelled with date and name of owner.
-
10.3 Personnel on site trained in LOTO procedures.
-
10.4 No Live work is performed unless with a Permit, Risk Assessment, Approval and in accordance with procedure.
-
Add media
11. Working at Heights, Scaffolding, EWPs and Ladders
11. Working At Heights, Scaffolding, EWPs And Ladders
-
11.1 Fall prevention is provided where required.
-
11.2 Scaff-tag or similar in place.
-
11.3 Guard rails, boards, toe boards in place.
-
11.4 Platform Ladders are used correctly and in good working order.
-
11.5 Unused ladders stored correctly and off site.
-
11.6 Ladders appropriately secured and correctly placed.
-
11.7 Three points of contact applied when using ladders.
-
11.8 Personnel using EWPs that can extend greater than 11 metre have appropriate High Risk Licence.
-
11.9 Personnel using EWP/Scissor Lifts have competency certificate.
-
11.10 Personnel using fall protection equipment are competent.
-
11.11 Metal ladders not used when conducting electrical work.
-
Add media
12. Quality Control
12. Quality Control
-
12.1 Project HSEQ Plan available on site.
-
12.2 Drawing register in place and up to date.
-
12.3 Superseded drawings are appropriately marked or eliminated.
-
12.4 ITP’s/ ITC’s used appropriately and timely.
-
Add media
13. Environment
13. Environment
-
13.1 Sediment control in place where required,
-
13.2 Waste is being disposed of in the correct locations, recycling where possible.
-
13.3 Dust being kept to a minimum where possible.
-
Add media
Highlights and General Comments