1. Inductions

1. Inductions

  • 1.1 Fredon inductions completed ( induction includes SWMS).

  • 1.2 Principal contractor inductions completed.

  • 1.3 Daily pre-starts conducted; includes SWMS & Risk Assessments.

  • 1.4 Toolbox talks conducted and recorded as specified for the site.

  • 1.5 Skills register in place (includes competencies &licences).

  • Add media

2. Emergency

2. Emergency

  • 2.1 First aid station and first aid kits available.

  • 2.2 First aiders trained and clearly identified on emergency board.

  • 2.3 Emergency plan and phone numbers displayed.

  • 2.4 Extinguishers available, inspected, tagged and current.

  • 2.5 Emergency exits clearly signed and unobstructed.

  • 2.6 Clear access to extinguishers/hose reels.

  • 2.7 Sign In / Sign Out register available.

  • 2.8 Injury Management procedures followed.

  • Add media

3. Housekeeping and General

  • 3.1 Amenities clean and hygienic

  • 3.2 All access/egress ways kept clear and dry.

  • 3.3 Work areas neat, tidy and not cluttered and well lit.

  • 3.4 Materials and tools stored correctly.

  • 3.5 Extensions leads raised off the ground.

  • 3.6 Appropriate segregation of waste, adequate bins provided.

  • 3.7 Manual handling techniques and aids used

  • Add media

4. Personal Protective Equipment (PPE)

4. Personal Protective Equipment (PPE)

  • 4.1 PPE register in place and correct PPE being worn.

  • 4.2 Eye protection (mandatory).

  • 4.3 Safety boots (mandatory).

  • 4.4 Safety hats (mandatory).

  • 4.5 High visibility vests (mandatory).

  • 4.6 Long sleeves shirts and trousers rolled down (mandatory).

  • 4.7 Appropriate Gloves (mandatory).

  • 4.8 Task specific PPE being used eg. Hearing, respiratory, etc.

  • Add media

5. SWMS and Permits

5. SWMS And Permits

  • 5.1 SWMS developed, available and signed.

  • 5.2 Work activities comply with SWMS.

  • 5.3 Necessary work permits obtained:

  • 5.4 Hot Work.

  • 5.5 Excavation.

  • 5.6 Others (confined space, electrical work etc) Note:

  • Add media

6. Hazardous / Chemical Substances

6. Hazardous / Chemical Substances

  • 6.1 Hazardous/chemical register completed and up to date.

  • 6.2 SDSs are available and up to date.

  • 6.3 Hazardous/chemical substances stored correctly.

  • 6.4 Containers labelled correctly.

  • 6.5 Gas cylinders stored upright, secured correctly, clearly marked

  • Add media

7. Tools and Equipment

7. Tools And Equipment

  • 7.1 Equipment register available and up to date.

  • 7.2 Correct tools used for tasks, with correct/adequate safeguards.

  • 7.3 Electrical equipment tested and tagged, serviced and fit for use.

  • 7.4 RCDs, power boards tested and results recorded.

  • 7.5 Lifting equipment tagged, serviced, fit for use and registered.

  • 7.6 Fall protection equipment tagged, serviced and fit for use.

  • Add media

8. Signage/Barricading

8. Signage/Barricading

  • 8.1 Danger/warning signs in place (including electrical).

  • 8.2 Barriers in place around open areas, pits, ramps, etc.

  • Add media

9. Mobile Plant and Equipment

9. Mobile Plant And Equipment

  • 9.1 Pre-start checks are recorded in log books kept and up to date.

  • 9.2 Plant and Equipment register available and up to date.

  • 9.3 Plant Operators have a certificate of competency and hold the relevant High Risk Licence (where applicable).

  • 9.4 A Risk Assessment has been completed on each item of plant<br>Plant is maintained in accordance with the manufacturer’s specification, and recorded <br>Operators Manual is available<br>A record of inspections is available and up to date.<br>

  • Add media

10. Isolations/ LOTO and Electrical Work

10. Isolations/ LOTO And Electrical Work

  • 10.1 LOTO register kept on site and up to date; including lock/tag owner, date, location, device locked.

  • 10.2 Tags labelled with date and name of owner.

  • 10.3 Personnel on site trained in LOTO procedures.

  • 10.4 No Live work is performed unless with a Permit, Risk Assessment, Approval and in accordance with procedure.

  • Add media

11. Working at Heights, Scaffolding, EWPs and Ladders

11. Working At Heights, Scaffolding, EWPs And Ladders

  • 11.1 Fall prevention is provided where required.

  • 11.2 Scaff-tag or similar in place.

  • 11.3 Guard rails, boards, toe boards in place.

  • 11.4 Platform Ladders are used correctly and in good working order.

  • 11.5 Unused ladders stored correctly and off site.

  • 11.6 Ladders appropriately secured and correctly placed.

  • 11.7 Three points of contact applied when using ladders.

  • 11.8 Personnel using EWPs that can extend greater than 11 metre have appropriate High Risk Licence.

  • 11.9 Personnel using EWP/Scissor Lifts have competency certificate.

  • 11.10 Personnel using fall protection equipment are competent.

  • 11.11 Metal ladders not used when conducting electrical work.

  • Add media

12. Quality Control

12. Quality Control

  • 12.1 Project HSEQ Plan available on site.

  • 12.2 Drawing register in place and up to date.

  • 12.3 Superseded drawings are appropriately marked or eliminated.

  • 12.4 ITP’s/ ITC’s used appropriately and timely.

  • Add media

13. Environment

13. Environment

  • 13.1 Sediment control in place where required,

  • 13.2 Waste is being disposed of in the correct locations, recycling where possible.

  • 13.3 Dust being kept to a minimum where possible.

  • Add media

Highlights and General Comments

Highlights And General Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.