Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Add signature

1. HSE Management and Induction

  • 1.1 Copy of HSE Policy and Project/Site HSE plan available at site and Communicated to all workers

  • 1.2 Risk assessments completed and recorded

  • 1.3 Fredon induction undertaken by all workers (include SWMS)

  • 1.4 Principal Contractor Induction undertaken by all workers

  • 1.5 Induction records kept for each person

  • 1.6 PPE and safety equipment issued and recorded

  • 1.7 Site rules issued and recorded

  • 1.8 Monthly HSEQ reports completed and submitted

2. Daily Pre-start Meetings

  • 2.1 Pre-Start meetings held daily

  • 2.2 Records of attendance kept and minutes kept

  • 2.3 SWMS and Identified risks are included

3. Tool Box Meetings

  • 3.1 Tool box meetings held weekly or as specified in HSEQ Plan

  • 3.2 Records of attendance kept and minutes kept

  • 3.3 Suggestions and issues are investigated and resolved

  • 3.4 Input from workers, subcontractors, customers and project management

4. Consultation and Representation

  • 4.1 HSE consultation arrangements in place (eg HSE reps)

  • 4.2 Workplace HSE committee operating at site

  • 4.3 Minutes of HSE committee meetings posted on notice boards

  • 4.4 HSE representatives/committees inspect the site

  • 4.5 HSE representatives/committee members receive training

5. Competency and Certification

  • 5.1 Workers engaged in ‘prescribed’ occupations are certified and records kept

  • 5.2 Licences/Competencies recorded in register, copies of certificates kept

  • 5.3 Personnel who are being trained are supervised

6. Safe Work Method Statements (SWMS)

  • 6.1 SWMS are developed, reviewed/specific for the job and registered

  • 6.2 Task steps and High Risks Hazards identified and included

  • 6.3 SWMS include adequate Control Measures

  • 6.4 Communicated and necessary training/instruction received by all workers

  • 6.5 Workers comply with controls in SWMS and procedures

  • 6.6 Work covered by SWMS is monitored to ensure compliance and adequacy/effectiveness of controls

7. Workplace Inspections

  • 7.1 HSEQ inspections conducted at periodic intervals

  • 7.2 Subcontractors and management participate in inspections

  • 7.3 Records kept and results communicated

  • 7.4 Actions developed, implemented and closed out

8. Hazard Reporting

  • 8.1

  • 8.2 Supervisors action hazard reports

9. Incident Reporting

  • 9.1 Requirements communicated and known by all personnel

  • 9.2 Incidents (incl. environmental incidents) reported and recorded

  • 9.3 Investigations completed where required

  • 9.4 Corrective actions addressed and closed out

10. Response and Recovery

  • 10.1 Emergency response procedures current and accessible

  • 10.2 Emergency equipment, exit signs, paths of travel and alarm systems inspected, tested and maintained at regular intervals

  • 10.3 Emergency response procedures have been tested (Drills conducted)

  • 10.4 Evacuation maps are prominently displayed and understood

  • 10.5 Locations for fire extinguishers identified and marked

  • 10.6 Extinguishers of the correct type, inspected, tagged and current

  • 10.7 Personnel trained in use of emergency equipment

11. First Aid

  • 11.1 First aiders clearly identified

  • 11.2 First aid kits provided and contents regularly checked

  • 11.3 Register of first aid treatments maintained

  • 11.4 First aid facilities are sign posted

  • 11.5 Emergency phone numbers, location of doctor/ hospital are displayed

12. Amenities

  • 12.1 Amenities and offices adequate for number of employees

  • 12.2 Amenities and washing facilities provided kept clean, tidy and hygienic

  • 12.3 Amenities and offices have fire extinguishers

  • 12.4 All appliances clean, operational and tagged:- air conditioners/ heaters/ urns/hot water units/drinking water/refrigerators-food warmers/microwaves

  • 12.5 Adequate noticeboards in place, including HSE noticeboard

  • 12.6 Safety signs are in good condition and clearly visible

13. Work Environment and Housekeeping

  • 13.1 Good site layout all access/egress ways kept clear, work areas neat and tidy, walking surfaces in good condition and work areas well lit

  • 13.2 All stairs and landings are clear from obstructions

  • 13.3 Barriers in place around open areas, pits and ramps, railings in place to guard ladder ways and wall openings

  • 13.4 Emergency exits clearly signed and unobstructed Clear access to fire extinguishers/hose reels

  • 13.5 ‘No Smoking’ and ‘Smoking Permitted’ areas clearly marked

14. Storage

  • 14.1 Materials stored off the ground

  • 14.2 Storage areas covered and weather proof

  • 14.3 Materials protected against damage

  • 14.4 Materials easily identified

15. Personal Protective Equipment (PPE)

  • 15.1 Correct PPE being worn

  • 15.2 Eye protection (double shielding where necessary)

  • 15.3 Gloves (Minimum Cut 3 rating)

  • 15.4 Safety boots

  • 15.5 Safety Hats

  • 15.6 Long sleeves and trousers

  • 15.7 High visibility vests or shirts

  • 15.8 Hearing, Respiratory, Safety harness used where required or specified

16. Work Permits

  • 16.1 Necessary work permits obtained/monitored/complied with as required:

  • 16.2 General Work Permit

  • 16.3 Hot Work

  • 16.4 Working at Heights

  • 16.5 Live Work

  • 16.6 Excavation

17. Hazardous Substances

  • 17.1 Assessments completed

  • 17.2 Hazardous substances stored/labelled correctly and in secured area

  • 17.3 Appropriate PPE being worn correctly, additional PPE available to manage appropriate substances

  • 17.4 SDSs and register readily available and current

  • 17.5 Warning notices and placards in place

  • 17.6 Area free of chemical spills

18. Flammables and Compressed Gases

  • 18.1 Flammable substances stored as per regulations and will not contaminate area or equipment (e.g. bunded)

  • 18.2 Warning signs visible including No smoking/naked flame signs

  • 18.3 Gas cylinders are segregated by type and full/empty

  • 18.4 Adequate ventilation

19. Electrical

  • 19.1 Electrical equipment in good condition and tagged correctly

  • 19.2 Residual Current Devices (RCDs) tested and results recorded

  • 19.3 Certificates obtained for RCDs in boards

  • 19.4 Earth leakage devices available, in use and tagged

  • 19.5 Covers on and locked on distribution boards

  • 19.6 Out of service/danger tags used

  • 19.7 Cables secured and organised

20. Tools and Equipment

  • 20.1 Correct tools being used for tasks

  • 20.2 Safe operating procedures available for specific tools

  • 20.3 Guarding adequate and correct voltage/air pressure being used

  • 20.4 Inspected/serviced regularly

  • 20.5 Cables/hoses/connectors/earthing/ check/etc in good condition

  • 20.6 Damaged items tagged ‘Out of Service’ and removed from service

  • 20.7 Stored correctly

21. Cartridge Operated Tools

  • 21.1Trained/licensed operator

  • 21.2 Appropriate shielding/containment

  • 21.3 Control of cartridges (authorised personnel only)

22. Isolation

  • 22.1 System in place to de-energise electrical/pneumatic/hydraulic equipment

  • 22.2 Personnel understand/competent in requirements

  • 22.3 Use of isolation tags/locks

  • 22.4 Faulty construction plant and equipment is tagged out of service/isolated

  • 22.5 Faulty plant and equipment is inspected, maintained, repaired and approved by a competent person

23. Working at Heights

  • 23.1 Permit obtained where required

  • 23.2 Height hazards controlled by permanent or temporary handrails or scaffolding

24. Mobile Elevated Work Platforms (MEWP's)

  • 24.1 Plant Operators have a certificate of competency and hold the relevant High Risk Licence (where applicable)

  • 24.2 Work covered by a SWMS/permit

  • 24.3 Pre-start checks completed / maintenance records current

  • 24.4 Controls clearly marked /Marking of Safe Working Load (SWL)

  • 24.5 Handrails in good condition and secure

  • 24.6 Harness used (where applicable)

25. Scaffolding

  • 25.1 Erected correctly by a competent person. For scaffolding over 4m, erection was performed by licensed scaffolders.

  • 25.2 Scaff-tag or similar in place

  • 25.3 Guard rails, boards, toe boards in place

  • 25.4 Scaffold tied to structure

  • 25.5 Platforms free from debris

  • 25.6 Mobile scaffold is working correctly, on secure level surfaces

26. Ladders

  • 26.1 Inspected/serviced regularly

  • 26.2 In good working order and damaged ladders removed from service

  • 26.3 Wooden or fibreglass for electrical works

  • 26.4 Platform Ladders to be used to work from (not A-Frame Ladders)

  • 26.5 Extension Ladders being used as access and correctly:

  • 26.6 No dangerous situations, correct angle placement and tied off

  • 26.7 Three points of contact method used

  • 26.8 Ladders extend 1m above level of exit

27. Fall Protection Equipment (Eg Lanyards and Harnesses)

  • 27.1 Register available of all fall protection equipment on site

  • 27.2 Maintenance and inspection schedule for fall protection equipment

  • 27.3 Records of maintenance and inspection kept

  • 27.4 Equipment stored correctly

  • 27.5 Personnel using fall protection equipment hold a certificate of competency

  • 27.6 Fall arrestor anchor points certified, checked and tested

28. Lifting, Rigging, Cranes and Lifting Equipment

  • 28.1 Licensed operators

  • 28.2 Maintenance log kept (Cranes)

  • 28.3 Operational instructions legible/available and permits current

  • 28.4 Warning signs notices displayed

  • 28.5 Lift studies have been conducted and records kept

  • 28.6 Operational areas clear of power lines

  • 28.7 Lifting equipment register in place and up to date

  • 28.8 Lifting equipment in good condition (no signs of broken wire ropes, severed wires and strands, rust, corrosion, kinks, dog legs, signs of damage or abuse, down grading of slings, etc)

  • 28.9 Repairs correct/satisfactory

  • 28.10 Records of inspection and maintenance kept for lifting equipment

  • 28.11 Lifting equipment correctly stored

  • 28.12 Lifting equipment marked - Safe Working Load (SWL)

29. Motor Vehicles / Mobile Plant

  • 29.1 Plant Operators have a certificate of competency and hold the relevant High Risk Licence (where applicable).

  • 29.2 Pre-start checks completed and recorded

  • 29.3 Maintenance log kept

  • 29.4 Seatbelts fitted and used

  • 29.5 Fire extinguisher installed

  • 29.6 Reversing alarms, flashing lights

  • 29.7 Loads appropriately secured

30. Welding and Cutting

  • 30.1 Hot work Permit and Extinguisher in place

  • 30.2 Goggles, gloves, helmets etc suitable for job

  • 30.3 Screens shields and warning signs in place

  • 30.4 All equipment, leads, connectors in good condition and grounded correctly

  • 30.5 Cutting torches in good condition

  • 30.6 Cylinders secured/upright

  • 30.7 Hose and regulators in good condition and protected against fire/physical damage, flashback arrestors fitted

31. Excavations

  • 31.1 Underground services identified/protected

  • 31.2 Adequate access/egress

  • 31.3 Barriers/warnings in place

  • 31.4 Shoring/sloping/stepping adequate for conditions

  • 31.5 Rebar ends protected

  • 31.6 Spoil clearance and plant/equipment clearance adequate

32. Confined Spaces

  • 32.1 Risk Assessed and entry procedure documented, area sign posted and access restricted

  • 32.2 Personnel trained and stand-by person available

  • 32.3 Emergency procedure in place, approved and consulted

  • 32.4 Ventilation adequate and low voltage lighting used

  • 32.5 Atmospheric testing conducted, Test equipment (eg atmospheric monitor) calibration up to date and records available

33. Hot Work

  • 33.1 Risks identified and Permits issued

  • 33.2 Fire protection available

  • 33.3 Stand-by person appointed, if applicable

34. Hazardous Manual Tasks / Ergonomics / Repetitive Work

  • 34.1 Risk assessments conducted and documented

  • 34.2 Personnel trained in safe manual task work practices

  • 34.3 Materials have “lift points” where they cannot be easily handled

  • 34.4 Suitably rated trolleys and lifting equipment is available and readily accessible to cart and materials

  • 34.5 Workstations adjustable to meet requirements of user

  • 34.6 Work postures meet ergonomic requirements, are practical for task are adequately addressed

  • 34.7 Work processes are set up to reduce twisting and bending

  • 34.8 Processes and work areas in place to reduce repetitive work

35. Inspection, Measuring and Test Equipment

  • 35.1 Inspection, measuring and test equipment identified, calibrated and logged in register

  • 35.2 A schedule of testing dates is available

  • 35.3 Inspection, measuring and test equipment maintained & stored correctly

36. Remote Areas

  • 36.1 Remote workers have communications which have been tested

  • 36.2 Emergency response procedures in place

37. Noise and Vibration

  • 37.1 Areas emitting noise/vibration are identified with hearing protection requirements clearly signed

  • 37.2 Personnel wearing correct hearing protection

  • 37.3 Adequate arrangements to minimise noise pollution

  • 37.4 Monitoring where appropriate

  • 37.5 Noisy works are carried out during specified hours

38. Spills/Contamination

  • 38.1 Environmental response procedures available where required (e.g. chemical spill)

  • 38.2 Response and clean up arrangements in place with spill response kits available, stocked, identified and accessible

  • 38.3 Personnel trained in environmental emergency response

39. Waste

  • 39.1 Waste management systems in place (prevent/reduce/reuse/recycle)

  • 39.2 Appropriate segregation of waste

  • 39.3 Adequate bins provided

  • 39.4 Waste disposal records maintained

40. Water Courses

  • 40.1 Appropriate pumping out of excavations

  • 40.2 Tanks adequately bunded and bunds intact

  • 40.3 Stockpiled materials have sediment controls around them

  • 40.4 Stormwater drain sediment controls are in place and effective

41. Air Quality

  • 41.1 No black smoke from plant

  • 41.2 Dust generation minimised

  • 41.3 Mobile Plant is restricted to designated routes to minimise dust

42. Local Community/Surroundings

  • 42.1 Impact of traffic minimised

  • 42.2 Traffic Management Plan in place where required

43. Flora and Fauna

  • 43.1 Endangered flora and fauna have been identified and protected where necessary

  • 43.2 Weeds are controlled

44. Quality

  • 44.1 Drawings are registered on the drawing register

  • 44.2 Drawings or part of drawings being photocopied show drawing number to cross-reference if title block in not part of photocopy

  • 44.3 Drawings that are for reference only i.e. architectural, stamped “For Reference Only” on the drawing holder

  • 44.4 PC/Laptop used on site, regularly backed-up

  • 44.5 ITP’s and ITC’s are initiated as required by the specification or client requirements

  • 44.6 ITP’s/ ITC’s are used to verify actual work carried out in the field

45. (Site/Project Specific Inspection Items)

  • 45.1

  • 45.2

  • 45.3

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.