Title Page
MIF.01 - 1ST FIX SVP/ RWP INSPECTION
-
Client: Ballymore
-
Project: Royal Wharf
-
SVP / RWP
-
Apartment Number
-
Block
-
Flat Type
-
Select date
-
Floor
-
Drawing Number
-
Checked by
-
Date:
-
Select date
-
Pipe work and fitting material of construction are subject to correct specification.
-
Preliminary line check as Schematic Piping Specification (Brackets, Vents & Drains).
-
Electro-fusion couplings fused correctly.
-
Pipe work brackets are to correct spacing and installed correctly.
-
Installation and position of expansion joints are correct.
-
Insertion Depth of Expansion Joints as per Depth Gauge on fitting
-
Installation and Position of Access Hatch
-
Access Hatch Height 1200mm from Finished Floor Level
-
W/C pan Connection Height 165mm (±) 5mm
-
No open end unused spigots.
-
System cleared for insulating
-
Snag List
-
Ballymore Supervisor
-
Cilantro Supervisor
-
Select date
-
QC Passed: