Title Page

  • Document No.

  • Audit Title

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Were there any actions from the previous audit? If so confirm if actions have been appropriately closed - if not chase with the action owner

  • Summary:

  • Check that the person(s) issuing these permits have been trained (look at permit training records)

  • Add media

  • Check all sections of the permit form have been completed (no blank sections)

  • Add media

  • Check that the permit has been authorised by the issuer and accepted by the recipient

  • Add media

  • Check that reasonable control measures have been specified - and that the permit is cross referenced to other permits/authorisation documents (where applicable).

  • Add media

  • Check that the permits have been cancelled by both the issuer and the recipient

  • Add media

  • Check that there is an up to date list of persons authorised to issue permits

  • Add media

  • Check that the system is audited on a 6 monthly basis by the Engineering Manager (or equivalent)

  • Add media

  • Is a "Hot work" permit and "Permits to breach" in place and regularly used.

  • Add media

  • Ensure any 'live' permits have been issued correctly (talk to the recipient if possible)

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.