Information
-
Date, Initials, Job #
-
Job Name
-
Audit Title
-
ViewPoint Reference #
-
Site Supervision:
-
Conducted on
-
Prepared by
-
Weather Condition at time of incident:
-
Overall visibility
-
Location
1. Accident/Incident Details
-
1a. Employee / Injured Party Name:
-
1b. Was injury or incident reported immediately? (To whom)
-
1c. Date & Time reported:
-
1d. Is the injured party an employee of Miron Construction? If the answer is no, list Sub-Contractor or Affiliation to project.
-
1e. Trade:
- Labor
- Carpenter
- Iron Worker
- Plumber
- Electrician
- Painter / Taper
- Visitor
- Project Management
- Mill Worker
- Safety Manager
- Company Executive
- Finisher
- Teamster / Driver
- Operator
- Project Owner / Rep
- Sheet Metal Worker
- Pipe Fitter
- Brick Layer
- Tech Engineer
-
1f. Indicate Employees Union Local affiliation:
-
1g. Location of accident (please be specific)
-
1h. Date and time of injury;
-
1i. Describe nature of injury:
- Laceration
- Contusion
- Strain
- Sprain
- Puncture
- Loss of vision
- Fracture
- Illness
- Abrasion
-
1j. Describe what employee was doing at the time of injury:
-
1k. Was employee working on assigned task? Give details.
-
1l. Who assigned task to employee?
-
1m. Was a Pre-Task / Tool box Talk training completed before work began? (Attach Copies)
-
1n. Photograph copies of training documents (attach here)
2. Statements: Witness, Employee, & Foreman
-
2a. What were fellow co-workers / trades assignment at the time of injury?
-
2b. Were co-workers or other tradesmen present at time of injury? (List individually)
-
2c. Were there any witnesses?
-
2d. Witness Statement:
-
2e. Witness
-
2f. Witness Signature:
-
2g. Foreman Statement:
-
2h. Foreman Signature:
-
2i. Employee Statement:
-
2j. Employee signature:
-
2k. Describe who, what, when,where, why and how injury occurred:
-
2l. photo of work area
-
2m. photo of task and body position
-
2n. Photo of injury (if possible)
3. Contributing Causes:
-
3a. Were tools being carried or used at time of incident
-
3b. Describe tools being used or carried at time of incident:
-
3c. Did the use of tools, equipment or material play a role in this incident?
-
3e. Describe how tools, equipment or material affected this incident:
-
3f. Were photo's taken at time of incident by anyone else beside person completing this form?
-
3g. Who took other photo's and what is their affiliation to the project? (Please List with contact info)
-
3h. Contributing Cause or Causes of the incident: (Inadequate PPE, Not Paying attention to surroundings, failure to utilize safety equipment)
-
3i. Were any chemicals involved in incident?
-
3j. Describe chemical label on can and SDS (aka) MSDS for chemical.
-
3k. Photographs of label if possible.
4. Injury Details
-
4a. Was first aid provided at time of injury?
-
4b. Did employee decline medical treatment at time of injury?
-
4c. Was post accident drug testing performed?
-
4d. Did injured employee go to clinic to receive medical attention for injury?
-
4f. Name and Location of assigned facility.
-
4g. Was employee released to full / regular duty?
-
4h. Was the employee released to work with restrictions?
-
4i. Describe in detail restrictions:
-
4i. What are the medical follow up instructions?
-
4i. Did the employee have a similar injury in the past?
-
4j. Is there a follow up appointment, if so when? (Select date & time)
-
4k. Is there a transitional duty position available based on restrictions?
5. Corrective Action: Short Term
-
5a. What was the immediate action taken to correct the issue (how was this done):
6. Corrective Action: Long Term
-
6a. What are the long term corrective action or actions needed to correct and avoid this issue? (describe)
7. Additional Information
-
7a. Drawings applicable to Incident
-
7b. Are there any attachments that apply: Pictures, Drawings, Training Records, Statement of Employee, Statement of Witness/es, Other.
-
7c. Attachment Details here:
-
7d. Additional Information notes:
8. Person Completing Form (please sign below)
-
8a. Investigation by: