Information
-
Project Name
-
Contract No:
-
Document No.
-
Conducted on
-
Location
-
Contractor:
-
Prepared by:
- Jason Clements (MLEI)
- James O'Conner (MLEI)
- Adam Grant (MCC)
- Brendan Howard (MCC)
- Alan Michie (FBE)
- Steve Morton (RGS)
- Other
Management and Administration
-
Skip 'Management and Administration'
-
Has a Traffic Managment Plan been submitted and approved?
-
Are daily, weekly, monthly checklists and reviews being undertaken in accordance with the CEMP and specifications?
-
Is there a suitably qualified and experienced traffic manager appointed / onsite?
-
Has an up-to-date VMP been prepared and implemented?
-
Has a traffic-based risk assessments being undertaken??
-
Is recording and reporting of traffic accidents being undertaken?
General
-
Skip 'General'
-
Is traffic control effective from a drive through?<br>
-
Is the worksite credible? (TCAWS 4.7.1)
-
Are signs easy to read and spaced effectively for the road user?
-
Are speed restrictions in force?
-
Are speed restriction generally being adhered to?
-
Is the road surface travelled through, around or past the work site satisfactory?
-
Is construction parking restricted to compounds and not spilling onto the road network?
-
Was traffic flow restricted (other than speed limits)?
-
Type of road occupation?
- None
- Stop / Go
- Contraflow
- Road Closure
- Shoulder closure
- Intermittent
- Detour
- Other
-
Was the wait time reasonable?
-
Did traffic controllers seem courteous and helpful to road users?
-
General comments.
Long Term Setup
-
Skip 'Long Term Setup'
-
Has a TGS been approved for long term traffic management?
-
Has a long-term traffic control been setup?
-
Is there a speed restriction in place?
-
Have long term traffic signs been erected in a permanent manner?
Short Term Setups
-
Skip 'Short Term Setups'
-
Is there short term / dynamic works being undertaken requiring a traffic setup?
-
Does this setup have an approved TGS?
-
Is the setup consistent with the approved TGS?
-
Will this setup be in place for longer than a day?
-
Is this setup as per the 2-week traffic look ahead?
Traffic Guidance Schemes (TGS)
-
Refer: Traffic Control at Worksites manual - section 7
-
Skip 'TGS"
-
Are all signs and devices in place as per the approved TGS?<br>
-
Are the approved TGS's on site and signed?
-
Have TGS been signed off by certified personnel.
-
Is the TGS relevant to the work being conducted? (TCAWS 4.7.2)
-
Add comments regarding the TGS.
Roadworks Speedlimits
-
Refer: Traffic Control at Worksites Manual - section 8
-
Skip 'Speedlimits'
-
Is a worksite speed reduction in place?
-
Is the speed limit appropriate for the works? (TCAWS 4.5.2)
-
Is a transition zone or Speed Limit AHEAD sign required? (TCAWS 4.5.2)
-
Are speed limit signs correctly spaced?
-
Are conflicting speed limit signs and pavement markings covered or removed?
-
Has the speed limit been notified to relevant authorities?
-
Is a road occupancy license (ROL) required and on site?<br>
-
Is the speed limit noted on the approved TGS?
-
Add comment regarding speed limits.
Signs and Devices
-
Refer: Traffic Control at Worksites Manual - section 6
-
Skip 'Signs and Devices'
-
Are signs current and in good condition? (TCAWS 6.3)
-
Are signs and devices clearly visible, unobstructed?
-
Are signs the correct size? (TCAWS 6.5.3)
-
Are signs erected at the correct height and position? (TCAWS 6.5.4)
-
Verify daily traffic control sign inspection have taken place and documented?
-
Are barrier boards being used effectively?
-
Are cones and bollards material and sizing compliant (TCAWS 6.8.4)
-
Are cones and bollards installed at correct spacings? (TCAWS Table 6-2)
-
Have the needs for pedestrians been appropriates provided for? (TCAWS 4.4.2)
-
Have cyclists needs been considered? (TCAWS 4.4.3)
-
Have residents entry and exit been considered and controlled? (TCAWS 5.2.5)
-
Have signs and devices been checked for night visibility?
-
Has the potential for end of queue accidents been considered? (TCAWS 4.6)
Portable Traffic Signals
-
Refer: Traffic Control at Worksites Manual - section 6.6
-
Skip 'Portable Traffic Signals'
-
Is the approach speed 65km or less? (TCAWS 5.4.3)
-
Is the minimum sight distance provided? (TCAWS 5.4.5)
-
Is the signal timing setup effective for traffic flow? (TCAWS App B)
-
Has the interaction with railway level crossings been considered and addressed?
Flashing Arrow Sign / Variable Message Board
-
Refer: Traffic Control at Worksites Manual - section 6.9
-
Skip 'Flashing signs and VMS'
-
Is it the correct type and approved for use?
-
It is located in a safe position? (TCAWS 6.2.4)
-
Is the message relevant and readable? (TCAWS 6.9.1.1 Table 6-15)
-
Add comments regarding signs and devices.
Traffic Controllers
-
Refer: Traffic Control at Worksites Manual - section 5.4
-
Skip 'Traffic Controllers'
-
Traffic controllers have been trained and are carrying the 'Traffic Controller' qualification? (TCAWS 5.4.3 Table 5-11)
-
Has an escape route been clearly defined? (TCAWS 5.4.3 Table 5-11)
-
Approach speed limit 45km/hr or less? (TCAWS 5.4.2)
-
Are controllers wearing the appropriate high visible uniform with authorized traffic controller notation?
-
Are controllers positioned to be visible for approaching traffic? (TCAWS 5.4.3 Table 5-11)
-
Is there sufficient communications between controllers? (TCAWS 5.4.3 Table 5-11)
-
Are rest breaks setup for controllers? (TCAWS 5.4.3 Table 5-11)
-
Add comments regarding traffic controllers.
Flood Management and Detours
-
Refer: Specification G10 cl 2.7A
-
Skip 'Flooding and Detours'
-
Has appropriate signage been erected for a detour due to flooding to be enacted?
-
Boom gates?
-
Turning bays?
-
Flashing signs?
-
Boom gates?
-
Turning bays?
-
Flashing signs?
-
Is necessary signage and devices available onsite to rapidly implement detour?
-
Is traffic manager and crew briefed on how to implement a detour?
Road Safety Audits
-
Skip 'RSA's'
-
Has a road safety audit (RSA) been undertaken?
-
Have the issues raised in the RSA been appropriately considered and closed out?
-
Are additional road safety audits required?
Signoff
-
Signature of Inspector