Title Page

  • Location / Site

  • Prepared by

  • Conducted on

Mobile Plant

  • Photos

  • ID:

  • Model:

  • Daily pre start inspection checklist completed by operator.

  • Faults identified have been signed off.

  • Operator competencies verified

  • Safety devices fitted – seat belts / fire extinguishers / reverse alarms / machine guards / brakes / flashing beacon

  • Safe working load charts in place and legible.

  • Motion alarms fitted and operational

  • Vehicles and trucks are maintained to manufacturers specification.

  • Operators manual on site and available to operator.

  • Mobile plant being used correctly eg. Use of spotters, not overloaded etc.

  • Motion alarms fitted and operational if required

  • Mobile plant not blocking access ways

  • Contractors have a SWMS / JSA for the task

  • Contractor have signed onto Visitor / Site Inspection SWMS

  • Contractor is aware of emergency evacuation procedure

  • Contractor has all required Personal Protective Equipment

  • All licences and accreditation's are current and available for inspection

  • Further Findings:

Sign

  • Name

  • Select date

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.