Title Page
-
Location / Site
-
Prepared by
-
Conducted on
Mobile Plant
-
Photos
-
ID:
-
Model:
-
Daily pre start inspection checklist completed by operator.
-
Faults identified have been signed off.
-
Operator competencies verified
-
Safety devices fitted – seat belts / fire extinguishers / reverse alarms / machine guards / brakes / flashing beacon
-
Safe working load charts in place and legible.
-
Motion alarms fitted and operational
-
Vehicles and trucks are maintained to manufacturers specification.
-
Operators manual on site and available to operator.
-
Mobile plant being used correctly eg. Use of spotters, not overloaded etc.
-
Motion alarms fitted and operational if required
-
Mobile plant not blocking access ways
-
Contractors have a SWMS / JSA for the task
-
Contractor have signed onto Visitor / Site Inspection SWMS
-
Contractor is aware of emergency evacuation procedure
-
Contractor has all required Personal Protective Equipment
-
All licences and accreditation's are current and available for inspection
-
Further Findings:
Sign
-
Name
-
Select date
-
Signature