Information

  • Inspection No.

  • Job location and Job number

  • Client / Site

  • Conducted on

  • Location

Construction phase plan and risk assessment communication

  • Prepared by Team Leader

  • Does the construction phase plan/risk assessment cover the build remit.

  • Stop marquee erection and contact head office to advise that the CPP and RA are not correct for the site and to obtain permission to proceed

  • Communicate CCP and RA for the marquee erection to the erection team Click to enter Names of those present.

  • Team leader Sign to confirm communication to those present.

  • Other personnel on site
  • Name / Company

  • Add signature

Pre-construction checks

  • Check ground conditions - note if ground is soft or hard, soft ground conditions would be if a standard stake driven into the ground with 6" exposed can be moved physically without the aid of tools. If so more stakes than normal or longer stakes than normal and spreader plates under main uprights may be required. Any additional such measures should be noted.

  • Check ground conditions - note if ground is soft or hard, soft ground conditions would be if a standard stake driven into the ground with 6" exposed can be moved physically without the aid of tools. If so more stakes than normal or longer stakes than normal and spreader plates under main uprights may be required. Any additional such measures should be noted.

  • Tap to enter information

  • Any further infomation

  • Enter corrective action taken

  • Has the area been marked out for service lines and checked for underground hazards e.g. electricity cables, water services, gas services

  • Mark out services as instructed using CAT for the erection area and identify electricity, water and gas

  • Are all aspects of the final structure at a safe distance from overhead hazards? electricity supply lines, tall trees and overhangs. if no contact head office for direction to proceed.

  • Detail the corrective actions taken to reach a satisfactory outcome to permit erection.

  • Team leader sign off that actions have been taken.

Set up and Organising the site

  • Have all signs and perimeter marking been erected around the work area and hazards and public access to the construction area prevented? if no Ensure all access areas to the work areas is restricted to authorised persons only.

  • Are all the items on the load been delivered and are suitable for the construction of the marquee?

  • Contact head office and arrange replacement / missing parts

  • Communication procedures are in accordance with Pre-Construction information

  • Record here and communicate any special procedures needed e.g emergency procedures. while working on site.

PPE Check

  • PPE being worn as per risk assessment instructions.

  • PPE being worn?

  • If no, Limit the staff member to work not where the PPE is not required and advise head office.

Ladder inspection

  • Identify the ladders, step ladders, hop ups being used.

  • Are there any damaged, loose or missing parts?

  • Rubber feet

  • Identify defective equipment

  • Rungs bent

  • Identify defective equipment

  • Missing rivets or rung securing mechanism

  • Identify defective equipment

  • Damaged hop up/ step ladder mechanisum

  • Identify defective equipment

  • Add any other hazard info found on the equipment
  • Identify defective equipment

  • Defect

Marquee inspection

  • Inspection checks carried out frame and stability

  • Is the construction a traditional pole marquee?

  • Inspection checks carried out

  • Inspection check list finished Marquee

  • Enter details of defective items
  • Add media

  • team leaders name

  • Add signature

  • Select date

Site sundry instalations

  • Confirm the following items have been installed according to Pre Construction information and on the Confirmation Of Order form?

  • Other items supplied by marquee company

  • All items correct? and qty correct?

  • Enter missing items

  • Site Manager to sign off as complete

  • Confirm all subcontract materials have been installed according to Pre Construction information

  • Other items supplied by subcontract company

  • All items correct? and qty correct?

  • Enter missing items

  • Site Manager to sign off as complete

Sign off installation complete

  • Client has been informed of how to use the generator, heater, dimmer etc? (Not required if not installed)

  • Enter details

  • Site clean and tidy before handover

  • Enter details

  • Marquee clean and tidy

  • Enter details

  • Are all items as requested?

  • Enter details

  • Customer sign off

  • Notes

  • Marquee team leader sign off

  • Notes

  • Enter date and time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.