Title Page
-
Document No.
-
Audit Title
-
Places Gym Corby
-
Conducted on
-
Prepared by
-
Location
-
Personnel
*CENTRE NAME* - These checks are to be completed on a Monthly basis. If there is any non conforming items a picture must be taken at the end of this report, and then logged in the Corrective Action Log located within the Shared Drive.
Monthly Fire Door Inspection
-
Fire Door 1 - Satisfactory
-
Fire Door 2 - Satisfactory
-
Fire Door 3 - Satisfactory
-
Fire Door 4 - Satisfactory
-
Fire Door 5 - Satisfactory
-
Fire Door 6 - Satisfactory
-
Fire Door 7 - Satisfactory
-
Fire Door 8 - Satisfactory
-
Fire Door 9 - Satisfactory
-
Fire Door 10 - Satisfactory
-
Fire Door 11 - Satisfactory
-
Fire Door 12 - Satisfactory
-
Fire Door 13 - Satisfactory
-
Fire Door 14 - Satisfactory
-
Fire Door 15 - Satisfactory
-
Please note down any issues in the space provided below, log on the corrective action log and take a picture using the media tool below if applicable.
-
Add media
-
Select date
-
Add signature