Title Page
Main Office
Monthly checklist
-
Fire extinguisher, next to Linemen lockup
-
Exit sign, hall outside Jim's office
-
Exit sign, outside Cole and Dustin hallway
-
Exit sign with flood light, at main employee entrance
-
Access control, main employee entrance
-
Fire extinguisher, stores room next to metal fire doors
-
Exit light with flood light, linemen employee entrance
-
Airphone test, exterior linemen employee entrance
-
Access control, linemen employee entrance
-
Fire extinguisher, shop/garage dock
-
Exit light with flood light, shop/garage by fire extinguisher
-
Exit light with flood light, southern exit door
-
Access control, southern exit door
-
Fire extinguisher, outside emergency generator control room
-
Emergency exit light in emergency generator room
-
Fire extinguisher, heat pump room
-
Exit light, lower level by water fountain
-
Fire extinguisher, next to Derrek's office
-
Exit light, outside lower level women's restroom
-
Fire extinguishers, outside SCADA room (halon)
-
SCADA Room access control
-
Exit light, conference room hallway
-
Exit light, conference room with flood
-
Exit light by men's restroom
-
Exit light with flood light, above door leading upstairs to lobby area
-
Access control, door at base of steps to conference room
-
Exit light with flood light, exit door main office entrance
-
Access control, main office entrance doors
-
Main entry air phone
-
Fire extinguisher, outside main entrance / south wall facing generator
-
Exit light with flood light, main hall outside HR and lobby
-
Fire extinguisher outside customer service area
-
Customer service access control
-
Customer service release button
-
Access control, computer room
-
Fire extinguisher, server room (halon for computers)
-
Exit light, main hall left of Cathy's office
-
Exit light with flood light, above janitorial closet
-
Exit light with flood light, bottom of steps at lower level
-
Add signature