Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Administrative
-
Ensure there is a properly trained Class A, B and C operator assigned to this location.
-
Ensure facility is implementing good housekeeping practices.
-
Ensure annual training records are current for plan.
-
Confirm the Automatic Tank Gauge (ATG - i.e.: Veeder Root) Quick Reference Card is posted near the ATG.
-
Ensure State Required Class C operators have been designated and trained.
-
Ensure permits & registrations are properly posted and current.
-
Comments/Action Items:
-
Add media
Spill Kits
-
Ensure spill kits are located in areas where spills may occur (i.e. next to tanks, drums, defueling areas, fuel islands).
-
Ensure spill kits are properly stocked.
-
Comments/Action items:
-
Add media
Fuel Tank System
-
Ensure nozzles are properly hung on dispensers.
-
If there has been a recent "drive off" ensure the breakaway is not leaking.
-
Ensure hose retractors are properly working and hoses are not touching the ground.
-
Ensure hoses are not crimped, collapsed or cracking.
-
Ensure the ATG has no alarms & is easily accessible.
-
If the dispensers DO NOT have fuel leak sensors, open each dispenser and ensure area is dry and free of debris and there are no signs of leaks.
-
Ensure proper signage is posted such as: "Smoking Prohibited", "Dispensing Into Unapproved Containers Is Prohibited", "Vehicles Must Stop During Fueling", etc.
-
Ensure the emergency shut off switch is not blocked, is clearly labeled and is within sight of all dispensers.
-
Comments/Action Items:
-
Add media
USTs - if applicable (Open each sump and inspect)
-
Ensure underground tank and piping sumps are dry, free of debris and there are no signs of leaks.
-
Ensure the leak detection sensor is properly mounted at the lowest point within the sump.
-
Ensure there are no cracks or holes in the bottom or sides.
-
Comments/Action Items:
-
Add media
USTs & ASTs - Spill buckets/Spill Box (fill ports)
-
Ensure the covers (for USTs) are color coded properly (gas=white w/black cross, vapor=orange, diesel=yellow, used oil=purple, lube oil=none, heating oil=green).
-
Ensure the fill port caps are not visibly broken and are properly secured.
-
Ensure the bucket or box is dry and free of debris and liquids.
-
Comments/Action Items:
-
Add media
ASTs (fuel, lube oil, used oil, etc.) & Mobile Defuelers (i.e.: Black Rhino, etc.)
-
Ensure the tank exterior and connections are free of visible leaks.
-
Ensure above ground piping is free of visible leaks.
-
Ensure the containment (diking or impounding) is free of liquid and debris. (if applicable)
-
Ensure the containment (diking or impounding) drain valve is closed. (if applicable)
-
Ensure the gauge does not indicate any liquid is in the interstitial space of the tank.
-
Ensure the tank audible alarm is working properly by pressing the test button - if equipped.
-
Ensure the fill port is closed when not being used.
-
Ensure tanks, tank supports and concrete pad are in good condition.
-
Ensure outdoor vents are covered/capped to keep rain from entering tank.
-
Ensure vent cap is free of debris such as insect or bird nests (visible from ground only).
-
Ensure all hoses and valves on defuelers are free of leaks and properly connected.
-
Comments/Action Items:
-
Add media
Waste management
-
Ensure any waste drums or tanks are properly labeled with their contents (i.e.: Used oil, waste oil, spill clean up, etc.).
-
Ensure waste manifests, bill of lading or other shipping documents are being retained (i.e.: used oil, used oil filters, used tires, environmental waste, etc.).
-
Comments/Action Items:
-
Add media
-
Notify the Class B Operator or On-site supervisor of any issue(s) discovered.
-
Signature: