Title Page
-
Conducted on
-
Prepared by
-
Location
-
Time on site?
-
Have RAMS been read and signed?
-
Have all aspect of the work been completed?
-
Why?
-
List switch ports used for devices:
-
Insert photo of Chef Screen & Bump Bar
-
Insert serial number of PIK box for chef screen
-
Insert serial number of bump bar for chef screen
-
Insert picture of servery screen and bump bar
-
Insert serial number of PIK box for servery screen
-
Insert serial number of bump bar for servery screen
Untitled page
-
Has mission control advised that the screens are working correctly?
-
Has the site been cleaned to the standard it was upon arrival?
-
Time Leaving site?
-
Engineer signature
-
Store signature