Title Page
-
Reviewer
-
Title
-
Date Started
-
Date Completed
-
Team Members
-
The Environmental Manager, or designee, is responsible for conducting the annual site compliance evaluations.
This checklist provides an overview of the evaluation process - additional details are available in the SWP3 Plan.
Items to be Reviewed in Compliance Evaluation
Any drainage area modifications that require change to SWP3?
-
Date Completed
-
Notes / Follow-up
Inspect stormwater drainage areas for evidence of pollutants entering the drainage system
-
Date Completed
-
Notes / Follow-up
Inspect stormwater outfalls for the presence of non-storm water discharges
-
Date Completed
-
Notes / Follow-up
Verify items that are listed as part of the material handling, storage and transfer areas covered by the SWP3
-
Date Completed
-
Notes / Follow-up
Evaluate effectiveness of measures to reduce pollutant loading
-
Date Completed
-
Notes / Follow-up
Observe structural measures, sediment controls, & other BMP to insure proper operation
-
Date Completed
-
Notes / Follow-up
Verify spill cleanup, control equipment and containment structures in the areas covered by the SWP3
-
Date Completed
-
Notes / Follow-up
Observe Best Management Practices effectiveness to insure proper operation
-
Date Completed
-
Notes / Follow-up
Inspect any equipment required by the SWP3
-
Date Completed
-
Notes / Follow-up
-
Keep Copy in STATESVILLE Feed Mill SWP3 File. Include Copy of Summary Report with Certification & Signature.
Items to Complete Following the Evaluation
Revise the SWP3 plan as required by the Annual Evaluation.
-
Date Completed
-
Notes / Follow-up
Implement any changes required.
-
Where capital improvements are necessary, establish an implementation schedule. Include schedule in revised SWP3
-
Date Completed
-
Notes / Follow-up
Prepare a Summary Report that includes:
-
Inspection Results
-
Follow-up Actions
-
Date of Inspection
-
Personnel Conducting the Inspection
-
All incidents of non-compliance
-
If Facility is in compliance -- certification of compliance Reports must be retained for at least 3 years with SWP3
-
Date Completed
-
Notes / Follow-up
-
Keep Copy in STATESVILLE Feed Mill SWP3 File. Include Copy of Summary Report with Certification & Signature.