Title Page

  • Reviewer

  • Title

  • Date Started

  • Date Completed

  • Team Members

  • The Environmental Manager, or designee, is responsible for conducting the annual site compliance evaluations.
    This checklist provides an overview of the evaluation process - additional details are available in the SWP3 Plan.

Items to be Reviewed in Compliance Evaluation

Any drainage area modifications that require change to SWP3?

  • Date Completed

  • Notes / Follow-up

Inspect stormwater drainage areas for evidence of pollutants entering the drainage system

  • Date Completed

  • Notes / Follow-up

Inspect stormwater outfalls for the presence of non-storm water discharges

  • Date Completed

  • Notes / Follow-up

Verify items that are listed as part of the material handling, storage and transfer areas covered by the SWP3

  • Date Completed

  • Notes / Follow-up

Evaluate effectiveness of measures to reduce pollutant loading

  • Date Completed

  • Notes / Follow-up

Observe structural measures, sediment controls, & other BMP to insure proper operation

  • Date Completed

  • Notes / Follow-up

Verify spill cleanup, control equipment and containment structures in the areas covered by the SWP3

  • Date Completed

  • Notes / Follow-up

Observe Best Management Practices effectiveness to insure proper operation

  • Date Completed

  • Notes / Follow-up

Inspect any equipment required by the SWP3

  • Date Completed

  • Notes / Follow-up

  • Keep Copy in STATESVILLE Feed Mill SWP3 File. Include Copy of Summary Report with Certification & Signature.

Items to Complete Following the Evaluation

Revise the SWP3 plan as required by the Annual Evaluation.

  • Date Completed

  • Notes / Follow-up

Implement any changes required.

  • Where capital improvements are necessary, establish an implementation schedule. Include schedule in revised SWP3

  • Date Completed

  • Notes / Follow-up

Prepare a Summary Report that includes:

  • Inspection Results

  • Follow-up Actions

  • Date of Inspection

  • Personnel Conducting the Inspection

  • All incidents of non-compliance

  • If Facility is in compliance -- certification of compliance Reports must be retained for at least 3 years with SWP3

  • Date Completed

  • Notes / Follow-up

  • Keep Copy in STATESVILLE Feed Mill SWP3 File. Include Copy of Summary Report with Certification & Signature.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.