Title Page
-
Facility Name
-
Audit Date
-
Auditors
-
Section 1 = Safety & Health Administration - Eligible Points = 21
-
Section 2 = Regulatory Compliance - Eligible Points = 137
-
Section 3 = Machine Specific - Eligible Points = 19
-
Section 4 = Equipment Inspections - Eligible Points = 18
-
Section 5 = Air Monitoring - Eligible Points = 7
-
Comments
Safety & Health Administration
Reporting and Tracking of Accidents and Illnesses
-
A. Current OSHA log (Form 300) is maintained and up to date
-
Comments
-
B. Completed OSHA logs are maintained and available for review for the previous five years
-
Comments
-
C. An OSHA Form 301 (Injury and Illness Incident Report) or adequate State Workers' Compensation First Report of Injury is on file for the current year each injury or illness
-
Comments
-
D. OSHA Form 301 (or State Workers' Compensation First Report of Injury) is on file and maintained for the previous five years
-
Comments
-
E. The completed OSHA 300-A Summary forms is posted in a prominent place between February 1 - April 30
-
Comments
-
F. Completed OSHA 300-A summary forms are maintained for the previous 5 years
-
Comments
-
G. OSHA required information is readily accessible to meet 4 hour accessibility requirement. (OSHA 300 and 300-A forms)
-
Comments
Medical/Treatment
-
A. First Aid/CPR/AED training is completed for site personnel with documentation
-
Comments
-
B. Standing orders have been developed by a physician and reviewed every two years with documentation
-
Comments
-
C. First aid kits available and appropriately stocked
-
Comments
Incident Reporting and Investigation Procedures
-
A. Supervisor incident reports are completed for all OSHA record-able accidents and near misses deemed serious
-
Comments
-
B. Incident Review Boards are conducted for any OSHA record-able, property damage, involving powered industrial equipment or other incidents with potential for serious injury. (IRB form completed)
-
Comments
Safety Committee
-
A. Safety Steering team meetings are held monthly with documentation
-
Comments
-
B. Facility Safety teams meet at least on a monthly basis with documentation & include ergonomics
-
Comments
-
C. Facility Safety team members are provided documented training on their responsibilities
-
Comments
-
D. Facility Safety teams conduct periodic audits of the facility to include ergonomics
-
Comments
-
E. Process Safety Management (PSM) meetings are held at least on a monthly basis with documentation
-
Comments
-
F. Facility safety/engineering/maintenance planning meetings are held on a weekly basis
-
Comments
Facility Safety Inspections
-
A. Daily safety inspections are conducted and documented. Deficiencies identified are corrected with documentation
-
Comments
-
B. Monthly safety inspections are conducted and documented. Deficiencies identified are corrected with documentation
-
Comments
-
C. Quarterly facility inspections are conducted and documented. Deficiencies are corrected and documented
-
Comments
Regulatory Compliance
Fire Prevention and Protection
-
A. Fire extinguisher training is conducted on an annual basis for authorized users through the Alchemy LMS
-
Comments
-
B. Fire extinguishers are inspected monthly with documentation
-
Comments
-
C. Fire extinguishers are inspected annually by a third party with documentation
-
Comments
-
D. Fire extinguishers are not blocked
-
Comments
-
E. Maximum travel distance for a fire extinguisher is 75 feet
-
Comments
-
F. Fire extinguishers are not mounted above 5 feet and no less than 4 inches off the floor
-
Comments
-
G. Authorized employees receive initial "Hot Work" training with refresher training every three years through the Alchemy LMS
-
Comments
-
H. Hot Work Permits are fully utilized and completed accurately
-
Comments
-
I. Areas requiring hot work permits are identified with documentation
-
Comments
-
J. Hot Work Permits are maintained onsite for 30 days
-
Comments
-
K. The hot work program and completed hot work permits (30 days) are evaluated on an annual basis with documentation
-
Comments
-
L. Sprinklers Systems and alarms are inspected quarterly by a third party with documentation
-
Comments
-
M. Annual Pump test are completed for sprinkler systems by a third party with documentation
-
Comments
-
N. Sprinkler pumps are test run weekly (in-house) with documentation
-
Comments
-
O. Monthly valve position inspections for each sprinkler riser is conducted monthly in-house with documentation
-
Comments
Walking Surfaces
-
A. All work platforms, stairs, ladders and mezzanines are designed according to Mountaire and OSHA construction standards
-
Comments
-
B. Floors are in good condition and slip resistant
-
Comments
-
C. Drain grating is in good condition and slip resistant
-
Comments
-
D. Signage and warning cones are used during floor cleaning
-
Comments
Personal Protective Equipment (PPE)
-
A. Job/task specific PPE hazard assessments have been performed to determine PPE needs
-
Comment
-
B. Job/task specific PPE hazard assessments are reviewed on an annual basis
-
Comment
-
C. Observations indicate that employees are wearing PPE as required by job task
-
Comment
Hearing Conservation
-
A. Sound levels have been measured and documented for all areas of the facility (annually)
-
Comments
-
B. Warning signs are posted in high noise areas
-
Comments
-
C. Audiometric examinations are conducted for affected employees on an annual basis
-
Comments
-
D. The OSHA hearing conservation program standard is posted in the facility
-
Comments
-
E. The written hearing conservation program is audited on an annual basis
-
Comments
-
F. Hearing conservation training is conducted on an annual basis
-
Comments
-
G. Employees with hearing shifts are retrained on the proper use of hearing protection with documentation
-
Comments
Hazard Communication
-
A. All chemicals on-site are pre-approved by Safety & Environmental and in the MSDS online system
-
Comments
-
B. All containers are clearly labeled including the appropriate warnings and pictograms
-
Comments
-
C. Chemicals not in original container and not for immediate use have GHS labels (pictograms, signal word & precautionary statements)
-
Comments
-
D. MSDS online icon is available on Kiosks
-
Comments
-
E. The written hazard communication program is audited on an annual basis
-
Comments
Hazardous Energy Control - Lockout/Tagout
-
A. Types of locks utilized are identifiable and issued to authorized employees
-
Comments
-
B. All authorized employees are properly trained on the lockout/tagout program through the Alchemy & Training Department (initial & annual refresher)
-
Comments
-
C. All authorized employees are trained on the "LOTO Observation Skills Steps" annually with documentation (form developed)
-
Comments
-
D. Written lockout/tagout procedures have been developed for each piece of equipment addressing all types of energy as required
-
Comments
-
E. Locations for lockout/tagout disconnects are listed for each unit in the written procedure
-
Comments
-
F. An annual inspection of energy control procedures will be conducted to include verification of authorized personnel understanding of LOTO machine specific procedures (documented)
-
Comments
-
G. Line opening permits are maintained on-site for 1 year
-
Comments
-
H. Annual review of completed line opening permits is completed with documentation
-
Comments
Powered Industrial Equipment
-
A. Authorized pallet jack operators receive initial training with refresher training every 2 years (documented)
-
Comments
-
B. Authorized fork lift operators receive initial training with refresher training every 2 years (documented)
-
Comments
-
C. Pallet jack pre-trip inspections are completed with documentation
-
Comments
-
D. Fork lift pre-trip inspections are completed with documentation
-
Comments
-
E. Forklifts are equipped with backup alarms, horns, lights & fire extinguishers
-
Comments
-
F. All forklifts are equipped with overhead protection and seat belts
-
Comments
-
G. Pallet jack and fork lift operators are carrying their certification license
-
Comments
-
H. Seat belts are being worn on all forklifts
-
Comments
-
I. Authorized skid steer operators receive initial training with refresher training every 2 years (documented)
-
Comments
-
J. Skid steer pre-trip inspections are completed with documentation
-
Comments
-
K. Authorized articulating boom operators receive initial training with refresher training every 3 years (documented)
-
Comments
Emergency Action Plans - Egress
-
A. An Emergency Action Plan has been developed and updated when facility changes are made. (fire, chemical, weather, bomb threat & medical emergency)
-
Comments
-
B. The Emergency Action Plan is reviewed on an annual basis with documentation
-
Comments
-
C. Exit signs are illuminated with a minimum of 5 foot candles of light
-
Comments
-
D. Doors that are not exits are marked "Not an Exit"
-
Comments
-
E. Exits are not blocked
-
Comments
-
F. Egress exit doors are not locked or equipped with appropriate panic bars
-
Comments
-
G. Annual fire evacuation drills are conducted by shift with documentation (includes head count)
-
Comments
-
H. All supervisors are trained on emergency evacuation procedures on an annual basis with documentation
-
Comments
-
I. Evacuation assembly areas are designated (Signage for processing facilities)
-
Comments
-
J. Emergency lighting is in working order and inspected on a monthly basis with documentation
-
Comments
-
K. Local Fire Department has conducted site visit within the last three years with documentation
-
Comments
Bloodborne Pathogens
-
A. Bio-waste bags and/or sharps containers are labeled and utilized
-
Comments
-
B. Authorized employees are trained on an annual basis through Alchemy (medical, janitorial, first aid & others)
-
Comments
-
C. Documentation exists that hepatitis vaccinations are offered to employees
-
Comments
-
D. Personal protective equipment (PPE) has been issued to all bloodborne pathogen responders
-
Comments
Confined Space Entry
-
A. All authorized employees are trained on confined space entry through the Alchemy LMS every three years
-
Comments
-
B. Rescue training is completed for authorized confined space trained employees with documentation (if needed)
-
Comments
-
C. Air monitoring equipment is maintained and available on-site for any confined space entries
-
Comments
-
D. A master list of confined spaces is maintained
-
Comments
-
E. All confined spaces are posted with appropriate signage
-
Comments
-
F. Rescue equipment is maintained or available on-site at time of any confined space entry. (confined spaces not declassified)
-
Comments
-
G. Confined space permits are maintained on-site for one year
-
Comments
-
H. The confined space program and confined space permits are evaluated on an annual basis with documentation
-
Comments
Respiratory Protection
-
A. Respiratory protection training is conducted through the Alchemy LMS on an annual basis
-
Comments
-
B. Appendix D form is completed for all employees wearing respirators on a voluntary basis
-
Comments
-
C. Respiratory physicals are performed on an annual basis with documentation of clearance from our medical provider
-
Comments
-
D. Fit testing is performed for all employees wearing respirators. Requires documentation by each type of mask/regulator
-
Comments
-
E. Respirators are clean and stored in an appropriate container or bag
-
Comments
Formaldehyde
-
A. New hire orientation training for Formaldehyde is completed for affected employees through the Alchemy LMS to include temporary and contract workers
-
Comments
-
B. Annual formaldehyde training is completed for authorized employees through the Alchemy LMS to include temporary and contract workers
-
Comments
-
C. Warning signage is utilized to identify hallways/rooms during formaldehyde use
-
Comments
-
D. Bulk storage of formaldehyde has appropriate warning signage
-
Comments
-
E. Procedures are developed for dispensing of formaldehyde to include wick cleaning and emergency spills
-
Comments
-
F. Medical Disease physicals are performed as based on air monitoring results. (above STEL=2.0 ppm, above AL=.5 PPM TWA)
-
Comments
Machine and Power Transmission Guarding
-
A. Blades of fans less than seven (7) feet above the floor or working level are guarded. The guard must not have openings larger than one-half (1/2) inch
-
Comments
-
B. Power transmission equipment (pulleys/chains/gears/sprockets) less than seven (7) feet above the floor or working level are guarded front and back
-
Comments
-
C. All exposed parts of shafts less than (7) feet above the floor or working level is protected by casing enclosing the shaft
-
Comments
-
D. Projecting shaft ends have smooth edges and do not project more than one half diameter of the shaft unless guarded by non-rotating caps
-
Comments
-
E. Unused shaft keyways are filled or covered
-
Comments
Ergonomics
-
A. Ergonomics training is conducted for all new hires through the Alchemy LMS
-
Comments
-
B. Specific ergonomics training has been developed and conduced for supervision with documentation
-
Comments
-
C. Training has been conducted for employees on the proper adjustment of work stand heights with documentation
-
Comments
-
D. Knives and scissors have ergonomics design with documentation
-
Comments
-
E. Knife and scissors sharpeners are available with easy access
-
Comments
-
F. A written knife and scissors sharpening program to include schedule for replacing knives and scissors has been developed
-
Comments
-
G. Training on knife sharpening is completed for employees who use them and the knife sharpener. (Traps)
-
Comments
-
H. A list of ergonomics improvements is maintained and documented
-
Comments
-
I. A work hardening program has been developed and documented
-
Comments
-
J. Ergonomics is included as part of the processing plant shift safety teams with documentation
-
Comments
Contractor Safety
-
A. Contractors have signed Attachment "A", Contractor Safety Information Request
-
Comments
-
B. Contractors have signed Attachment "B", Safety, Security & Health Rules
-
Comments
-
C. Contractors have signed Attachment "C", Contractor Safety Orientation Manager Sign-off
-
Comments
-
D. Contractor employees have signed Attachment "D", Contractor Employee Acknowledgement Form for Contractor Safety Orientation Manual
-
Comments
-
E. "Contractor Safety Approval" form is completed for each contractor
-
Comments
-
F. Periodic audits are conducted of contractors on-site work with documentation
-
Comments
Fall Protection
-
A. Initial fall protection training is provided to authorized employees with refresher training every 3 years through the Alchemy LMS
-
Comments
Electrical Safety
-
A. No observed missing electrical covers
-
Comments
-
B. Electric panels are not blocked (3 feet)
-
Comments
-
C. Electrical panels are clearly labeled
-
Comments
-
D. Electric panel covers/doors/troughs are not missing anchor screws with all knockouts sealed
-
Comments
-
E. Electrical panel blanks are properly covered
-
Comments
-
F. Electrical conduit is utilized for all permanent machinery and equipment
-
Comments
-
G. Extension cords are in good condition with appropriate ground plugs
-
Comments
-
H. GFCI's are utilized for construction like work. (extension cords for portable power tool, ect...)
-
Comments
-
I. Arc flash analysis and appropriate labels are posted on all electric panels
-
Comments
-
J. Arc flash analysis is re-certified every 5 years with documentation
-
Comments
-
K. Initial NFPA 70 E training has been conducted through the Alchemy LMS with refresher every 3 years for affected personnel
-
Comments
-
L. Arc flash PPE is available on-site with reasonable access
-
Comments
Shipping and Loading Docks
-
A. Wheel chocks are available and utilized
-
Comments
-
B. Jockeys truck drivers have received training per Mountaire training requirements ??????
-
Comments
-
C. Daily pre-trip inspections are conducted for jockey trucks with documentation
-
Comments
-
D. Dock doors are lighted and identified
-
Comments
-
E. Dock plates and levelers are in good condition
-
Comments
-
F. Docking safety systems are in good working condition (lights)
-
Comments
Grain and Feed Handling
-
A. All pit grates have an opening grid of 2.5 inches or less
-
Comments
-
B. Good housekeeping exists which includes evidence or 1/8 inch or less of grain dust
-
Comments
-
C. A written program for emergency action plans for grain and feed handling has been established (fire, explosion, rescue, ect...)
-
Comments
-
D. Employees have been trained on emergency action plans for grain and feed handling situations with documentation
-
Comments
-
E. Affected employees have been trained on bin entry procedures with documentation
-
Comments
-
F. A written housekeeping program has been developed by area/equipment with documented compliance
-
Comments
-
G. A written program for preventive maintenance established for grain legs and key equipment with documentation of compliance
-
Comments
-
H. Rail/train car safety procedures have been developed with documented training
-
Comments
-
I. Bin entry permits are maintained for 1 year
-
Comments
-
J. Annual review of the bin entry procedure to include bin entry permits is completed with documentation
-
Comments
Machine Specific
Machine Specific and Task Training
-
A. Verify new hire orientation is being conducted per approved playlist/learning plan. (random select 20 - processing, 5-Live & 2-Grain)
-
Comments
-
B. Monthly awareness safety training is conducted for the entire facility with documentation
-
Comments
-
C. Training completed for cage dump operators with documentation
-
Comments
-
D. Observations that cage dump warning lights (jammed cage) are operating and safe operating procedures are followed including un-jamming of cages
-
Comments
-
E. Training completed for salvage saws operators every 6 months through the Alchemy LMS
-
Comments
-
F. Observations that salvage saw operator is following safe operating procedures. (PPE, skills)
-
Comments
-
G. Training completed for OSSID machine operators with documentation
-
Comments
-
H. Observations that OSSID machine operators are following safe operating procedures
-
Comments
-
I. Training completed for gizzard table operators with documentation
-
Comments
-
J. Observations that gizzard table has warning signage and operators are following safe operating procedures
-
Comments
-
K. Training completed for CVP machine operators with documentation
-
Comments
-
L. Observations that CVP machine operators are following safe operating procedures
-
Comments
-
M. Training completed for party wing disjointer operators with documentation
-
Comments
-
N. Observations that party wing disjointer operators are following safe operating procedures
-
Comments
-
O. Training completed for B610 multivac operators with documentation
-
Comments
-
P. Observations that B610 multivac operators are following safe operating procedures
-
Comments
-
Q. Boiler low water cut-out safeties are tested daily with documentation
-
Comments
-
R. Boiler daily operating pressure logs are maintained to ensure safe parameters with documentation
-
Comments
-
S. Procedures have been developed for pallet jack battery changing with documented training
-
Comments
Equipment Inspections
Equipment Inspection
-
A. Engineered fall protection systems are inspected on an annual basis by a third party with documentation
-
Comments
-
B. Safety harnesses & lanyards inspected annually with documentation (in-house)
-
Comments
-
C. Self retracting lifelines (SRL's) are inspected on an annual basis with documentation (non-engineered system, in-house)
-
Comments
-
D. Anchor (slings) hardware inspected annually with documentation (in-house)
-
Comments
-
E. Emergency Response Trailer (ERT) inspected monthly with documentation
-
Comments
-
F. ERT level "A" suits pressure tested on an annual basis with documentation
-
Comments
-
G. ERT SCBA's regulators certified by third party on an annual basis with documentation
-
Comments
-
H. ERT SCBA air tanks re-certified as required with documentation (composite=3 years, carbon/steel/aluminum composite=5 years)
-
Comments
-
I. Ladders are inspected on annual basis by safety with documentation
-
Comments
-
J. Emergency eye wash and showers are available and inspected on a monthly basis with documentation
-
Comments
-
K. Emergency eye wash and showers are clean and functioning
-
Comments
-
L. Hoist are inspected on an annual basis by a third party with documentation
-
Comments
-
M. Hoist beams are marked with load rating
-
Comments
-
N. Storage mezzanines have signage for load rating
-
Comments
-
O. Bench grinders have all the guards with tool rest not to exceed 1/4 inch and shatter guard not to exceed 1/8 inch
-
Comments
-
P. Drill press is mounted to the floor and has bit guarding
-
Comments
-
Q. Welders are in good condition including leads, power cords, and plugs
-
Comments
-
R. Oxygen cylinders are stored at least 20 feet from flammable tanks or separated by 5 foot high - one hour fire barrier
-
Comments
Air Monitoring
Air Monitoring
-
A. Personal air monitoring conducted every 2 years for chlorine with the results posted. Note: Change in process requires new monitoring
-
Comments
-
B. Personal air monitoring conducted every 2 years for ammonia with the results posted. Note: Change in process requires new monitoring
-
Comments
-
C. Personal air monitoring conducted every two years for dust with the results posted. Note: Change in process requires new monitoring. (Live Hang, Hatchery & Feed Mill)
-
Comments
-
D. Personal air monitoring conducted every 6 months for formaldehyde with the results posted. Note: Change in process requires new monitoring
-
Comments
-
E. Personal air monitoring conducted every 2 years for hexavalent chromium with the results posted. Note: Change in process requires new monitoring
-
Comments
-
F. Personal air monitoring conducted every 6 months for carbon dioxide with the results posted. Note: Change in process requires new monitoring
-
Comments
-
G. Peracetic Acid coming soon
-
Comments