Title Page
-
Polygon ID
-
Bushland Reserve Name
-
Conducted on
-
Prepared by
-
Others present
-
What works have been carried out?
- FMZ 1
- FMZ 2
- LM4E
- Burn Preparation
- Response
- Other
- EFM/HIFU
-
What weeds are being controlled?
-
Are the methods applied appropriate to the task?
-
Have the methods been applied at an appropriate time?
-
Was herbicide used appropriate to task?
-
Do you observe an acceptable kill rate?
-
Are off target damage levels acceptable?<br>
-
-
Are the works maintenance works or creation works?
-
Have the works brought the polygon into specification?
-
Comments
-
If No, what aspect of specification has not been met.
- vertical separation
- lateral separation
- canopy separation
- slash height
- realign FMZ width
- removal of fallen fine fuels
-
Further comments regarding specification
-
Have the works been carried out as per the works plan or instructions?
-
If no, explain what has been carried out on site
-
Are the works carried to a professional standard?
-
If unsatisfactory, please explain
-
Do the works reflect the Fire Management Map?
-
If no, explain the discrepancy
-
Is signage required on site
-
Is the signage erected appropriate
- Yes
- No
- NA
-
Comments
-
Photo
-
Is the detail on the Fire Management Map appropriate for the site?
-
Is there further issues requiring attention on site?
- NO
- hard waste present
- green waste present
- mowing around fallen branches
- damaged infrastructure
- negative site impacts from works
-
Does this Audit require follow-up with the Fire Management Team?
-
Respose required by