Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

----Outlight ----

Outdoor Light 1 - front gate

  • Lightpole installed?

  • Mechanical o.k.?

  • Light correct angle (area)?

  • Lightpole cable installed?

  • Lightpole cable connected?

  • Cable gland o.k.?

  • Cable TAG o.k?

  • Lightpole TAG o.k?

  • Earthing o.k.?

  • Photo of installation:

Outdoor Light 2 - backside

  • Lightpole installed?

  • Mechanical o.k.?

  • Light correct angle (area)?

  • Lightpole cable installed?

  • Lightpole cable connected?

  • Cable gland o.k.?

  • Cable TAG o.k?

  • Lightpole TAG o.k?

  • Earthing o.k.?

  • Photo of installation:

HVAC

  • Equipment installed?

  • Mechanical o.k.?

  • Instrument o.k.?

  • Cable o.k.?

  • Cable gland o.k.?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

---- Earthing ----

---- Earthing Drain Tank ----

  • Earthingband through tank?

  • Potbar installed?

  • Earthing draintank connected?

  • TAG o.k?

  • Photo of installation:

Earthing Skid

  • Earthingband inside SKID?

  • Earthingwires potbar outside to potbar inside skid?

  • Earthing from potbar skid to SKID?

  • Earthingband outside SKID?

  • earthing on pipe manifold?

  • earthing on trays?

  • earthing on pipe oĆ¼tlet pump cont?

  • Earthingband connection completed at SKID?

  • TAG o.k.?

  • Photo of installation:

Earthing Fence

  • additional Earthingunit available?

  • additional Earthingunit connected to earthband?

  • additional Earthingunit connected to fence?

  • Earthingband connection to fence?

  • TAG o.k?

  • Photo of installation:

Light

Light inside Skid

  • Light skid - cableway / pipes?

  • Light skid - cable pulled?

  • Light SKid - itself mounted?

  • Light SKid - connected?

  • Light skid - functionality normal light?

  • Light skid - testing unit build into panels?

  • Light skid - functionality safety light?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

Emergency plates skid

  • Emergency plates reflec SKID 3x?

  • Photo of installation:

Emergency light E&I

  • Emergency light cable E&I?

  • Emergency light mounted E&I?

  • Emergency light connected E&I?

  • Emergency light functionality E&I?

  • Cable gland o.k.?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

Industrial air

  • Industrial air compressor available?

  • Industrial air compressor installed?

  • Industrial air compressor drying unit + filter installed?

  • Industrial air tubing / piping?

  • Industrial air system mechanical completed to equipments?

  • Industrial air system spare pipes closed with blind or filter?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

Exhaust Fan Skid

  • whole for Exhaust fan ?

  • whole for Inlet air ?

  • cover for Inlet air ?

  • Fan Skid cable installed ?

  • Fan Skid itself mounted ?

  • Fan Skid cable connected ?

  • Cover outside Fan Skid mounted ?

  • switch for fan Skid mounted ?

  • switch for fan Skid connected ?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

Ligthning

  • ligthning protection ?

  • short extension on skid for ligthning ?

  • long extension on skid for ligthning ?

  • ligthning rods Skid available ?

  • ligthning rods Skid installed ?

  • ligthning rods E&I available ?

  • ligthning rods E&I installed ?

  • connection to earthing grid SKID ?

  • connection to earthing grid E&I ?

  • TAG o.k?

  • Photo of installation:

Strobolight

  • Strobolight outside E&I mounted complete ?

  • cable pulled ?

  • cable connected ?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

Big motors

  • cable motor 2x pulled ?

  • glands mounted motor ?

  • cable motor 2x connected ?

  • Cable right curve to diameter 22kW ?

  • ptc cable motor 2x pulled ?

  • ptc cable motor 2x connected ?

  • glands fixed motor ?

  • earthing on motors ?

  • motorconnection proper done (wire itself) ?

  • bridge in panel PTC ?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

small motor

  • cable motor pulled ?

  • glands motor mounted ?

  • cable for motor 7,5 connected ?

  • glands right for motor 7,5 ?

  • glands fixed motor ?

  • earthing on motors ?

  • Cable right curve to diameter ?

  • motorconnection proper done (wire itself) ?

  • blind glands mounted motor & right type ?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

Junction boxes

  • cables pulled ?

  • cables connected ?

  • glands right colour JB ?

  • glands fixed JB ?

  • glands not used right stopper JB / blindgland ?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

F&G system

  • seperate pipes (Fire & Gas) ?

  • H60.cable (Fire & Gas) ?

  • Smokedetector mounted ?

  • Smokedetector cable pulled ?

  • Smokedetector cable connected 2x ?

  • Gassensor mounted ?

  • Gassensor cable pulled ?

  • Gassensor cable connected 2x ?

  • Firesensor mounted ?

  • Firesensor cable pulled ?

  • Firesensor cable connected 2x ?

  • F&G-unit mounted ?

  • cables to F&G-unit connected ?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

Heaters tanks

  • cables heater pulled ?

  • cables heater connected ?

  • temperature cable for elmes.heaters 2xquestion , pulled ?

  • cables temperature switch connected ?

  • heateconnection proper done (wire itself) ?

  • Cable right curve to diameter ?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

Instrumentation (partial)

  • SDV103 installed ?

  • SDV103 cable pulled ?

  • SDV103 cable connected ?

  • SDV103 air pipe mounted ?

  • SDV103 air pipe connected ?

  • earthing band Water Cut ?

  • Coriolis 2700 ?

  • Coriolis 3500 + NOC ?

  • Coriolis installed ?

  • Coriolis cable pulled ?

  • Coriolis cable connected ?

  • Coriolis earthing ?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

ESD-buttons

  • ESD-button installed ?

  • ESD-button piping ?

  • ESD-button cable installed ?

  • ESD-button connected ?

  • ESD-button function? ?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

E&I-Container

  • PLC-cabinets wired and completed for startup ?

  • right colour at cable cover in automation panel ?

  • PLC-cabinets software installed ?

  • fan in panel on right position ?

  • all cables connected in panel ?

  • E&I Container door correct installation (emergency opening) ?

  • frame cable inlet installed ?

  • frame cable inlet proper closed ?

  • frame cable inlet cover outside ?

  • panel E&I labels (nameplate, switch,ā€¦.) ?

  • switch light E&I nameplate ?

  • switch socket E&I nameplate ?

  • circuit breaker air compressor right size ?

  • C-profile in powerpanel ?

  • circuit breaker HVAC right size ?

  • watercut/Coriolis unit installed ?

  • earthingpoints at E&I ?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

transformer

  • OHL cable pulled ?

  • transformer itself mounted ?

  • OHL cable connected to tranasformer ?

  • OHL - transformer cable installed ?

  • Transformer - E&I cable pulled ?

  • Transformer - E&I cable connected ?

  • Main power supply / ON ?

  • cables proof protocol ?

  • completion certificate ?

  • preliminary docu ?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

generall units

  • edgeprotection ?

  • glands fixed lightbox ?

  • Potentialbar all installed ?

  • Potentialbar named ?

  • Potentialbar wires named ?

  • Potentialbar points reserve ?

  • cable clamp on vertical trays ?

  • cable nameplate ?

  • instrument nameplate ?

  • light nameplate ?

  • emergency light nameplate ?

  • earthingpoints at skid all ?

  • temporary cover at cable entrance SKID to avoid animals coming in at ?

  • SKID frame cable inlet installed ?

  • SKID frame cable inlet proper closed ?

  • Skid frame cable inlet cover outside ?

  • all earthing labels mounted ?

  • manifold pipes outside long enough for proper installation pressure gauges ?

  • anti panik locking system doors Skid installed ?

  • safety instruction - protectia muncii / per locaton ?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

Documentation / protocols handed over:

  • MTO lists ( ?

  • earthing protocol ?

  • cables proof protocol ?

  • Insemex ?

  • Lux protocol ?

  • switch board / cabinets / protocols, certs ?

  • completion certificate ?

  • preliminary docu ?

  • Photo of installation:

Well line integration

  • pressure switches / mechanical installation into pipes ?

  • pressure switches / mechanical installation ?

  • pressure switches / cable pulled ?

  • pressure switches / cable connected ?

  • pump / cable pulled ?

  • pump / cable connected ?

  • cables proof protocol ?

  • completion certificate ?

  • preliminary docu ?

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

Others

  • Earthing o.k.?

  • TAG o.k?

  • Photo of installation:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.