Information
-
Audit Title
-
Site
-
Document No.
-
Client
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Introduction
-
General description of the location
-
General photos of the location
Inlet Pipelines
-
Equipment to be checked
#
-
Equipment TAG
Equipment
Mechanical
-
All devices properly installed (according to P&ID)?
-
Helping Drawing
-
----- Re-checking section ------
Re-chekcing #
-
Date and time of the re-checking
-
All devices properly installed (according to P&ID)?
-
Helping Drawing
-
All devices - final and correct implementation?
-
Date and time of the final and correct implementation
-
Photos of the final and correct implementation (usually 3 photos)
Instrument
-
All devices properly installed (according to P&ID)?
-
Helping Drawing
-
----- Re-checking section ------
Re-chekcing #
-
Date and time of the re-checking
-
All devices properly installed (according to P&ID)?
-
Helping Drawing
-
All devices - final and correct implementation?
-
Date and time of the final and correct implementation
-
Photos of the final and correct implementation (usually 5 photos)
TAG
-
All devices properly installed (according to P&ID)?
-
Helping Drawing
-
----- Re-checking section ------
Re-chekcing #
-
Date and time of the re-checking
-
All devices properly installed (according to P&ID)?
-
Helping Drawing
Serial number of the device/devices
-
Photo of the serial number nameplate (one picture for every device)
Final checking of this unit
-
All devices - final and correct implementation?
-
Deadline
-
Date and time of the final and correct implementation
-
Photos of the final and correct implementation (usually 5 photos)