Information
-
Document No.
-
Audit Title
-
Conducted on
-
Prepared by
-
Location
Site Details
-
Subdivision Name
-
Stage
-
Watsons project number
-
Retail Water Authority
-
Retail Water Authority project number
-
Contractor
Type of Acceptance testing
-
Is testing for Water
-
Is testing being undertaken on potable water, recycled water or both
-
Is Swabbing being undertaken
Potable water swabbing
-
Contractors swabbing plan sighted
-
Have all swabs been accounted for
-
Has swabbing passed
-
Select date
-
MRWA representative signature
-
Consultant representative signature
-
Is Hydrostatic testing being undertaken
Hydrostatic testing potable water
-
Design head main is to be tested at (kPa)
-
Total length of line being tested (km)
-
Gauge calibration date and serial number
-
Gauge calibration date and serial number
-
Is percentage of PE water main length greater than or equal to 5% of total length of main
-
Additional water added after main has settled overnight (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Has hydrostatic testing passed
-
Select date
-
MRWA representative signature
-
Consultant representative signature
-
Has pressure held for 15 minutes with no loss
-
Has hydrostatic testing passed
-
Select date
-
MRWA representative signature
-
Consultant representative signature
-
Is Swabbing being undertaken
Recycled water swabbing
-
Contractors swabbing plan sighted
-
Have all swabs been accounted for
-
Has swabbing passed
-
Select date
-
MRWA representative signature
-
Consultant representative signature
-
Is Hydrostatic testing being undertaken
Hydrostatic testing recycled water
-
Design head main is to be tested at (kPa)
-
Total length of line being tested (km)
-
Gauge calibration date and serial number
-
Gauge calibration date and serial number
-
Is percentage of PE water main length greater than or equal to 5% of total length of main
-
Additional water added after main has settled overnight (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Has hydrostatic testing passed
-
Select date
-
MRWA representative signature
-
Consultant representative signature
-
Has pressure held for 15 minutes with no loss
-
Has hydrostatic testing passed
-
Select date
-
MRWA representative signature
-
Consultant representative signature
-
Is Swabbing being undertaken
Potable water swabbing
-
Contractors swabbing plan sighted
-
Have all swabs been accounted for
-
Has swabbing passed
-
Select date
-
MRWA representative signature
-
Consultant representative signature
Recycled water swabbing
-
Contractors swabbing plan sighted
-
Have all swabs been accounted for
-
Has swabbing passed
-
Select date
-
MRWA representative signature
-
Consultant representative signature
-
Is Hydrostatic testing being undertaken
Hydrostatic testing potable water
-
Design head main is to be tested at (kPa)
-
Total length of line being tested (km)
-
Gauge calibration date and serial number
-
Gauge calibration date and serial number
-
Is percentage of PE water main length greater than or equal to 5% of total length of main
-
Additional water added after main has settled overnight (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Has hydrostatic testing passed
-
Select date
-
MRWA representative signature
-
Consultant representative signature
-
Has pressure held for 15 minutes with no loss
-
Has hydrostatic testing passed
-
Select date
-
MRWA representative signature
-
Consultant representative signature
Hydrostatic testing recycled water
-
Design head main is to be tested at (kPa)
-
Total length of line being tested (km)
-
Gauge calibration date and serial number
-
Gauge calibration date and serial number
-
Is percentage of PE water main length greater than or equal to 5% of total length of main
-
Additional water added after main has settled overnight (litres)
-
Water added after 2nd hour (litres)
-
Water added after 3rd hour (litres)
-
Water added after 4th hour (litres)
-
Water added after 5th hour (litres)
V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)
-
Has hydrostatic testing passed
-
Select date
-
MRWA representative signature
-
Consultant representative signature
-
Has pressure held for 15 minutes with no loss
-
Has hydrostatic testing passed
-
Select date
-
MRWA representative signature
-
Consultant representative signature
-
Is testing for Sewer
-
Has contractor called in live entry Q number to MRWA control room
-
Has the contractor provided enough qualified personnel to undertake CSE activities
-
Is the section of sewer being tested isolated from live sewer by a mechanical or inflatable plug
-
Gauge calibration date and serial number
-
Gauge calibration date and serial number (vacuum)
Test 1 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 1 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 1 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 1 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 1 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 1 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 2 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 2 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 2 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 1 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 1 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 1 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 2 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 2 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 2 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 3 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 3 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 3 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 1 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 1 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 1 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 2 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 2 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 2 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 3 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 3 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 3 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 4 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 4 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 4 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 1 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 1 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 1 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 2 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 2 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 2 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 3 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 3 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 3 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 4 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 4 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 4 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 5 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 5 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 5 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 1 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 1 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 1 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 2 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 2 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 2 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 3 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 3 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 3 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 4 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 4 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 4 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 5 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 5 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 5 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 6 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 6 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 6 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 1 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 1 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 1 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 2 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 2 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 2 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 3 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 3 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 3 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 4 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 4 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 4 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 5 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 5 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 5 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 6 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 6 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 6 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 7 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 7 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 7 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 1 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 1 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 1 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 2 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 2 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 2 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 3 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 3 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 3 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 4 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 4 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 4 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 5 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 5 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 5 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 6 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 6 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 6 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 7 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 7 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 7 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 8 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 8 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 8 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 1 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 1 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 1 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 2 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 2 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 2 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 3 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 3 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 3 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 4 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 4 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 4 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 5 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 5 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 5 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 6 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 6 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 6 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 7 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 7 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 7 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 8 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 8 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 8 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 9 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 9 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 9 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 1 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 1 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 1 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 2 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 2 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 2 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 3 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 3 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 3 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 4 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 4 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 4 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 5 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 5 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 5 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 6 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 6 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 6 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 7 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 7 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 7 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 8 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 8 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 8 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 9 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 9 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 9 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Test 10 Air - Test
-
Line/s to be tested from maintenance hole to maintenance hole
-
Has Air - Test passed
Test 10 Infiltration
-
Maintenance hole to be vacuum tested
-
Has Vacuum test passed
Test 10 Ovality
-
Does Ovality Prover conform with dia. required for pipe type and size
-
Has Ovality test passed
Testing
Sewer acceptance testing sign off
-
Has all sewer acceptance testing passed
-
Enter Date and Time all testing was completed
-
MRWA representatives signature
-
Consultants signature