Information

  • Document No.

  • Audit Title

  • Conducted on

  • Prepared by

  • Location

Site Details

  • Subdivision Name

  • Stage

  • Watsons project number

  • Retail Water Authority

  • Retail Water Authority project number

  • Contractor

Type of Acceptance testing

  • Is testing for Water

  • Is testing being undertaken on potable water, recycled water or both

  • Is Swabbing being undertaken

Potable water swabbing

  • Contractors swabbing plan sighted

  • Have all swabs been accounted for

  • Has swabbing passed

  • Select date

  • MRWA representative signature

  • Consultant representative signature

  • Is Hydrostatic testing being undertaken

Hydrostatic testing potable water

  • Design head main is to be tested at (kPa)

  • Total length of line being tested (km)

  • Gauge calibration date and serial number

  • Gauge calibration date and serial number

  • Is percentage of PE water main length greater than or equal to 5% of total length of main

  • Additional water added after main has settled overnight (litres)

  • Water added after 2nd hour (litres)

  • Water added after 3rd hour (litres)

  • Water added after 4th hour (litres)

  • Water added after 5th hour (litres)

V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)

  • Has hydrostatic testing passed

  • Select date

  • MRWA representative signature

  • Consultant representative signature

  • Has pressure held for 15 minutes with no loss

  • Has hydrostatic testing passed

  • Select date

  • MRWA representative signature

  • Consultant representative signature

  • Is Swabbing being undertaken

Recycled water swabbing

  • Contractors swabbing plan sighted

  • Have all swabs been accounted for

  • Has swabbing passed

  • Select date

  • MRWA representative signature

  • Consultant representative signature

  • Is Hydrostatic testing being undertaken

Hydrostatic testing recycled water

  • Design head main is to be tested at (kPa)

  • Total length of line being tested (km)

  • Gauge calibration date and serial number

  • Gauge calibration date and serial number

  • Is percentage of PE water main length greater than or equal to 5% of total length of main

  • Additional water added after main has settled overnight (litres)

  • Water added after 2nd hour (litres)

  • Water added after 3rd hour (litres)

  • Water added after 4th hour (litres)

  • Water added after 5th hour (litres)

V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)

  • Has hydrostatic testing passed

  • Select date

  • MRWA representative signature

  • Consultant representative signature

  • Has pressure held for 15 minutes with no loss

  • Has hydrostatic testing passed

  • Select date

  • MRWA representative signature

  • Consultant representative signature

  • Is Swabbing being undertaken

Potable water swabbing

  • Contractors swabbing plan sighted

  • Have all swabs been accounted for

  • Has swabbing passed

  • Select date

  • MRWA representative signature

  • Consultant representative signature

Recycled water swabbing

  • Contractors swabbing plan sighted

  • Have all swabs been accounted for

  • Has swabbing passed

  • Select date

  • MRWA representative signature

  • Consultant representative signature

  • Is Hydrostatic testing being undertaken

Hydrostatic testing potable water

  • Design head main is to be tested at (kPa)

  • Total length of line being tested (km)

  • Gauge calibration date and serial number

  • Gauge calibration date and serial number

  • Is percentage of PE water main length greater than or equal to 5% of total length of main

  • Additional water added after main has settled overnight (litres)

  • Water added after 2nd hour (litres)

  • Water added after 3rd hour (litres)

  • Water added after 4th hour (litres)

  • Water added after 5th hour (litres)

V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)

  • Has hydrostatic testing passed

  • Select date

  • MRWA representative signature

  • Consultant representative signature

  • Has pressure held for 15 minutes with no loss

  • Has hydrostatic testing passed

  • Select date

  • MRWA representative signature

  • Consultant representative signature

Hydrostatic testing recycled water

  • Design head main is to be tested at (kPa)

  • Total length of line being tested (km)

  • Gauge calibration date and serial number

  • Gauge calibration date and serial number

  • Is percentage of PE water main length greater than or equal to 5% of total length of main

  • Additional water added after main has settled overnight (litres)

  • Water added after 2nd hour (litres)

  • Water added after 3rd hour (litres)

  • Water added after 4th hour (litres)

  • Water added after 5th hour (litres)

V(all) = 0.14 x L (length (km)) x D (dia. (m)) x H (test head (m)) Test passes if: ∆V(5h-4h) ≤ 0.55 x ∆V(3h-2h) + V(all)

  • Has hydrostatic testing passed

  • Select date

  • MRWA representative signature

  • Consultant representative signature

  • Has pressure held for 15 minutes with no loss

  • Has hydrostatic testing passed

  • Select date

  • MRWA representative signature

  • Consultant representative signature

  • Is testing for Sewer

  • Has contractor called in live entry Q number to MRWA control room

  • Has the contractor provided enough qualified personnel to undertake CSE activities

  • Is the section of sewer being tested isolated from live sewer by a mechanical or inflatable plug

  • Gauge calibration date and serial number

  • Gauge calibration date and serial number (vacuum)

  • How many sections will this test be broken into

Test 1 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 1 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 1 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 1 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 1 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 1 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 2 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 2 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 2 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 1 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 1 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 1 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 2 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 2 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 2 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 3 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 3 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 3 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 1 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 1 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 1 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 2 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 2 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 2 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 3 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 3 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 3 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 4 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 4 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 4 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 1 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 1 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 1 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 2 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 2 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 2 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 3 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 3 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 3 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 4 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 4 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 4 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 5 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 5 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 5 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 1 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 1 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 1 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 2 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 2 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 2 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 3 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 3 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 3 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 4 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 4 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 4 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 5 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 5 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 5 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 6 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 6 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 6 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 1 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 1 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 1 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 2 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 2 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 2 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 3 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 3 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 3 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 4 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 4 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 4 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 5 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 5 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 5 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 6 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 6 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 6 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 7 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 7 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 7 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 1 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 1 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 1 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 2 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 2 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 2 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 3 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 3 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 3 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 4 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 4 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 4 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 5 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 5 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 5 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 6 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 6 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 6 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 7 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 7 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 7 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 8 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 8 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 8 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 1 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 1 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 1 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 2 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 2 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 2 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 3 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 3 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 3 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 4 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 4 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 4 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 5 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 5 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 5 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 6 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 6 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 6 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 7 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 7 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 7 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 8 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 8 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 8 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 9 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 9 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 9 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 1 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 1 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 1 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 2 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 2 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 2 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 3 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 3 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 3 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 4 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 4 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 4 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 5 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 5 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 5 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 6 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 6 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 6 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 7 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 7 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 7 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 8 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 8 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 8 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 9 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 9 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 9 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Test 10 Air - Test

  • Line/s to be tested from maintenance hole to maintenance hole

  • Has Air - Test passed

Test 10 Infiltration

  • Maintenance hole to be vacuum tested

  • Has Vacuum test passed

Test 10 Ovality

  • Does Ovality Prover conform with dia. required for pipe type and size

  • Has Ovality test passed

Testing

Sewer acceptance testing sign off

  • Has all sewer acceptance testing passed

  • Enter Date and Time all testing was completed

  • MRWA representatives signature

  • Consultants signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.