1. Planning and Approvals

  • All Plans/Permits valid and onsite - ie. Power Company, Council or VicRoads MOA

  • Select date

  • Checked By

2. Construction Documentation

  • SWMS relevant for specific site and activities

  • Flushing Point constructed as per Standard Drawings SEW_PSS_004 or SEW_PSS_008

  • Isolation Valve constructed as per Standard Drawing SEW_PSS_003

  • Excavation Permit

  • Confined Space Entry Permit

  • Valid Q form

  • Select date

  • Checked By

3. Construction Plant and Equipment

  • Daily pre-start checklists completed for all plant

  • CSE equipment satisfactory

  • Plugs (not damaged)

  • Hoses (no leaks)

  • Select date

  • Checked By

4. Service Location and Protection

  • "Dial Before You Dig" information <br>

  • All known existing services have been located and proved prior to work commencing

  • Minimum clearance maintained as per WSA 07-2007 or WSA 02-2002

  • Select date

  • Checked By

5. Traffic Management

  • Set up as per site Traffic Management Plan

  • Works within specified road access time periods as stated in relevant MOA

  • Select date

  • Checked By

6. Inspection of Materials

  • Pipe and fittings conform to specifications and are in new condition<br><br>As per standard drawing:<br><br>- SEW_PSS_003/PSS-1010-M Typical Isolation Valve Installation<br>- SEW_PSS_004 Flushing Point - Trafficable<br>- SEW_PSS_008/PSS-1012-M Flushing Point

  • Min PN16/SDR11, PE 100 and 316 SS Fittings

  • Valve/s clockwise closing

  • 3mm gasket in good condition

  • Select date

  • Checked By

7. Establish Environmental Controls (as per EMP)

  • Silt fencing set up where required

  • Silt traps employed where required

  • Parawebbing erected around protected trees/vegetation

  • Arborist onsite for excavation within a SRZ

  • Select date

  • Checked By

8. Excavation

  • Sufficient traffic management and signs around excavation

  • Adequate fall from heights protection installed where required

  • Spoil stored correctly or removed from site

  • Correct trenching and shoring methods used for excavations greater than 1.5m

  • Select date

  • Checked By

9. Isolation Valve Location

  • Ensure correct fittings and pit covers are used (Trafficable or non Trafficable)

  • Is this a bridge crossing? Valves required on either side of crossing

  • Flanges wrapped in blue plastic

  • Select date

  • Checked By

10. Flushing Pit Location

  • Ensure correct fittings and pit covers are used (Trafficable or non Trafficable)

  • Intermediate flushing point is a minimum 1000mm or 12 x diameter from valves (whichever is greater)

  • Select date

  • Checked By

11. Concrete Placement

  • Concrete placed in accordance with WSA-07-2007 Clause 14.6.5

  • Free fall is less than 1.6m

  • Concrete is immediately compacted after placing (ensure segregation off concrete ingredients does not occur)

  • Formwork remains in place until adequate concrete strength has been achieved

  • Select date

  • Checked By

13. Bedding of Pipe for Open Cut

  • Bottom of trench is free from sharp obstructions

  • Min 100mm compacted sand on bed of trench

  • Min 150mm compacted sand surrounding pipe

  • Marker Tape installed on top of bedding material (min 150mm above pipe)

  • Select date

  • Checked By

14. Compaction and Backfill

  • Backfill to MRWA Specification No. 04-03.1 or to Road Authority's requirements

  • The Road Authority's requirements shall take precedence if they exceed the requirements of the MRWA Specification.

    MRWA Specification for roadways:
    - up to 1.5m deep - 20mm Class 2 Plant Mixed Wet Mix Crushed Rock
    - Over 1.5m - top 600mm to be 20mm Class 2 Plant Mixed Wet Mix Crushed Rock, 20mm Class 4 Crushed Rock for remainder.
    - Excavations in Footpaths - 20mm Class 4
    - Backfill placed in 200mm layers and compacted to required density 95% AS.

  • Compaction Test Report/s received

  • Select date

  • Checked By

15. Acceptance Testing

  • Pressure Testing for gravity system (vacuum or low air pressure testing)

  • Deflection testing (to be done 14 days after compaction has been completed)

  • CCTV received and satisfactory

  • Select date

  • Checked By

16. Reinstatement

  • Construction Impact Zones and affected work areas restored to condition prior to commencement of works

  • All surplus material removed from site

  • Select date

  • Checked By

NOTES AND COMMENTS

South East Water Representitive

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.