Information

  • Site Name and Pitch Number:

  • Sports Facility Type:

  • Pitch specification:

  • Wicket type:

  • Number of Courts:

  • Date and time of inspection:

  • Prepared by:

Outdoor Sports Facility Inspection

  • Is this a grass playing surface?

  • Length of Grass: (Acceptable = slightly long, due to be cut, Good = fine but not cut recently, Excellent = just been cut and cleared

  • Description:

  • Photograph:

  • Action to be taken by Landscapes Contractors:

  • By when:

  • Grass Coverage (Acceptable = some bare areas due to wear, some weeds, Good = few bare patches or weeds, Excellent = No bare patches and negligible weeds.

  • Description:

  • Photograph:

  • Action to be taken by Landscapes Contractors:

  • By when:

  • Playing surface - Drainage (Acceptable = pitch drains within 1 week of heavy rain shower, good = 3 days, excellent = 1 day)

  • Description:

  • Photograph:

  • Action to be taken by Landscapes Contractors:

  • By when:

  • Playing surface - Slope (Acceptable = minor slope along/across the pitch, good = part of the pitch, excellent = no slope)

  • Description:

  • Photograph:

  • Action to be taken by Landscapes Contractors:

  • By when:

  • Condition of Playing Surface - Damage (Acceptable = a few minor undulations, good = the odd undulation, excellent = no damage

  • Description:

  • Photograph:

  • Action to be taken:

  • By when:

  • Line Markings: (Acceptable = lines visible, pitch correct size, Good = lines are bright, Excellent = lines are bright and straight)

  • Description:

  • Photograph:

  • Action to be taken:

  • By when:

  • Have recent weather conditions adversely influenced these scores?

  • To what extent?

  • Equipment (goal posts etc.) - (Acceptable = Goals are standing upright and rust free, Good = goals are clean and smart, Excellent = Goals are pristine)

  • Description

  • Photograph:

  • Action to be taken by Landscapes Contractors:

  • By when:

  • Litter: (Acceptable = Negligible litter on the pitch itself, Good - No litter on the pitch, Excellent - No litter on the pitch or surrounds)

  • Description:

  • Photograph:

  • Action to be taken by Landscapes Contractors:

  • By when:

  • Dog Fouling: (Acceptable = Very little fouling on the pitch itself, Good - No fouling on the pitch, Excellent - No fouling on the pitch or surrounds)

  • Description:

  • Photograph:

  • Action to be taken:

  • By when:

  • Facility is playable in its current condition:

  • Reason:

Health & Safety

  • Are any hazards present during this inspection, which are not already covered the site risk assessment?

  • Description:

  • Photo:

  • Remedial action to be taken:

  • By whom:

  • By when:

  • Have there been any significant changes to the site since the most recent annual risk assessment was undertaken?

  • Does the risk assessment for this site require interim review?

  • By whom:

  • By when:

  • No other hazards or maintenance defects found at time of this inspection:

  • Time inspection completed:

  • Inspector's Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.